Tag: Education

Wesleyan University Science Building

Location: Middletown, Connecticut

Completion Date: 2026

Sales Rep: Mechanical Solutions, Inc.

Griswold Controls Products Used: Isolator B Valve, Isolator S Valve, and Union

 

Description:

For a community that could fill 2/3rds of Lambeau Field, a new era is right around the corner. Wesleyan University makes up 4,320 people in that community, but they are bringing a huge wave of new additions to Middletown.  

What the new Public Affairs Center, 44 and 56 Hamlin Street, and being carbon neutral by 2035 all have in common is bringing in the new era at Wesleyan University. One of the faces of this is the ambitious new Science Building. Scheduled for completion in 2026, this state-of-the-art building will serve as a hub for innovation and learning, providing students and faculty with cutting-edge resources and a collaborative environment. 

Wesleyan University’s new, 190,000 square foot science building will contain 48 labs, vivarium, greenhouse, outdoor spaces, and an advanced instrumentation lab spread across 4 floors of science. Going carbon neutral in 11 years requires support from every facet of operations. That is why the new building, designed by Payette Architects, will use only a third of the energy per square foot that the current labs take up. 

By providing a modern and efficient facility for scientific research and education, the building will attract top-tier faculty and students, enhancing the university’s reputation as a leading institution for scientific research and education. The building will also provide a collaborative environment for students and faculty, important for any higher education university.

Challenges and Solutions:

One of the primary challenges in constructing the New Science Building was integrating advanced HVAC systems into a complex architectural design and meeting the rigorous environmental guidelines. The solution involved using Griswold Controls’ Isolator B, Isolator S, and union products, known for their reliability and efficiency. These components ensure optimal performance and ease of maintenance, crucial for a facility that will house sensitive scientific equipment. 

Because the Wesleyan University new science building is a landmark project apart of the university going carbon neutral by 2035, there needs to be an incredible system to support that. 

By incorporating advanced HVAC solutions from Griswold Controls, the project ensures a sustainable, efficient, and comfortable environment for students and faculty. 

Benefits and Outcomes:

The building’s completion in 2026 will mark a new era of innovation and collaboration at Wesleyan University, solidifying its position as a leader in scientific research and education. The impact of this project, along with other ongoing construction efforts, will transform the campus and provide a modern, efficient, and sustainable environment for the entire Wesleyan community.  

This project was made possible via the Isolator S. Streamlined installation, sustainabilty, and efficiency are at the center of what the Isolator S valve provides. This valve is a combination of a ball valve, union and strainer, all in one housing leading to incredibly easy install.  

The new science building, and those projects associated with it, will also have a positive impact on the local community. By attracting top-tier faculty and students, the community of Middletown is sure to be improved in education and beyond. 

Products Used:

The Isolator B is a critical component in this HVAC system, providing reliable isolation and control to ensure efficient operation and easy maintenance. Its robust design makes it particularly suitable for high-demand environments like this New Science Building at Wesleyan University. 

The Isolator S is renowned for reducing labor costs and ensuring that the system can be easily serviced when needed. Its use in the New Science Building ensures that the building’s HVAC systems operate at peak efficiency, providing a consistent and comfortable environment for students and faculty. 

The precision of these valves allows for enhanced comfort while also contributing to the building’s overall energy efficiency, aligning with the project’s sustainability goals.

About Mechanical Solutions, Inc.

Since 1994, Mechanical Solutions, Inc. has been a reputable provider of high-quality mechanical components and systems. Their expertise in fluid dynamics, and system integration played a crucial role in the successful implementation of the HVAC system for the Yale New Haven Hospital Adams Neuroscience Center. With a strong commitment to innovation and customer satisfaction, Mechanical Solutions has established itself as a trusted partner in the healthcare industry.

Featured Projects
Have a question about this or another Featured Project? Fill out the form below and someone from Griswold Controls will get back to you shortly.


    Please prove you are human by selecting the plane.

    We Would Love to See Your Projects!

    Do you have a project that showcases Griswold Controls products?

    We would love to feature you! Submit a contact form with project details so we can feature the project on our website.

    Yale New Haven Hospital Adams Neuroscience Center

    Location: New Haven, Connecticut

    Completion Date: 2026

    Sales Rep: Mechanical Solutions, Inc.

    Griswold Controls Products Used: Coil Piping Package including Isolator R Valve

     

    Description:

    What started in 1826 as the fourth voluntary hospital in the U.S. is now a nationally recognized not-for-profit part of New Haven, Connecticut. The Adams Neuroscience Center will be a 505,000 square foot part of the Saint Raphael Campus and carefully designed to maintain existing standards of excellence in the Yale New Haven Health system. Cutting-edge treatments and research in neurological disorders will be at the forefront of this new neurological center. The expansion underscores Yale New Haven Hospital’s commitment to providing top-tier medical care and fostering innovation in neuroscience. Not only that, but maintaining the Magnet designation from the American Nurses Credentialing Center, the nation’s highest honor of nursing excellence will be essential to the success of the Adams Neuroscience Center. 

    These standards exist across the Yale New Haven Hospital, which is comprised of New Haven-based campuses, and includes Yale New Haven Children’s Hospital, Yale New Haven Psychiatric Hospital and Smilow Cancer Hospital.  

    This new project is sure to have a positive impact on the community in New Haven. One way this will happen is through the partnership with Yale University and the CHIRAL program. New Haven Hospital and Yale University have implemented this program that includes various initiatives like improving patient safety and healthcare delivery through multidisciplinary research and innovation.  

    These partnerships provide Yale students with valuable hands-on experience and contribute to improving healthcare services in the region.

    Challenges and Solutions:

    Ensuring optimal comfort and functionality for patients and staff in the new neuroscience facility posed significant challenges. The facility’s complex HVAC requirements demanded precise control and reliability. Mechanical Solutions, Inc. addressed these challenges by supplying Griswold Controls’ Coil Piping Packages. These pre-assembled systems streamline installation and reduce costs, featuring over 900 standard configurations for easy integration. The Isolator R Valves included in these packages are equipped with a stainless steel flow control cartridge, which dynamically absorbs pressure fluctuations, simplifying the balancing process and enhancing valve performance. 

    This approach has been successfully implemented in other projects, such as the Lowell Elementary School and Douthit Hills, where the Isolator R Valves played a crucial role in maintaining system balance and efficiency. 

    Benefits and Outcomes:

    The integration of Griswold Controls’ high-quality components into the Yale New Haven Hospital Adams Neuroscience Center ensures efficient operation and contributes to the hospital’s goal of delivering exceptional patient care. This project exemplifies the successful collaboration between Yale New Haven Hospital, Mechanical Solutions, Inc., and Griswold Controls, setting a new standard for healthcare facilities.

    Products Used:

    The Yale New Haven Hospital Neuroscience Center utilized Griswold Controls Coil Piping Packages, which simplify installation and ensure system integrity. These packages include all necessary components for a complete coil connection, facilitating on-site assembly. The Isolator R Valves were selected for their precision and reliability, featuring easily accessible flow control cartridges for flow measurement and adjustments.

    Photo from Tighe & Bond

    About Mechanical Solutions, Inc.

    Since 1994, Mechanical Solutions, Inc. has been a reputable provider of high-quality mechanical components and systems. Their expertise in fluid dynamics, and system integration played a crucial role in the successful implementation of the HVAC system for the Yale New Haven Hospital Adams Neuroscience Center. With a strong commitment to innovation and customer satisfaction, Mechanical Solutions has established itself as a trusted partner in the healthcare industry.

    Featured Projects
    Have a question about this or another Featured Project? Fill out the form below and someone from Griswold Controls will get back to you shortly.


      Please prove you are human by selecting the plane.

      We Would Love to See Your Projects!

      Do you have a project that showcases Griswold Controls products?

      We would love to feature you! Submit a contact form with project details so we can feature the project on our website.

      Zoetis Vivarium

      Location: Lincoln, Nebraska

      Completion Date: August 2023

      Sales Rep: Hydronic Energy, Inc.

      Griswold Controls Products Used: Coil Piping Package including QuickSet Manual Balance Valve

       

      Description:

      A global leader in animal health has recently completed a significant expansion in west-side Lincoln, Nebraska. This 1.4 million-square-foot facility on 145 acres, which is about twice the area of The Vatican, is dedicated to alleviating osteoarthritis pain in dogs and cats, and a Veterinary Medicine R&D registration facility. This expansion not only boosts Zoetis’ capacity to produce innovative treatments but also highlights their commitment to sustainability and environmental stewardship as part of their “Driven to Care” initiative. 

      Challenges and Solutions:

      Providing exceptional comfort for all 950 year-round residents at the Zoetis Vivarium Project was a challenge. Not only that, but this site stands as a pivotal manufacturing hub in Zoetis’ global supply network. These challenges are similar to those found in the City of Hope Cancer Center in Irvine, California. 

      One of the solutions, supplied by Hydronic Energy, is the Coil Piping Packages from Griswold Controls. These pre-assembled piping systems are designed to save time and reduce costs, offering over 900 standard configurations that can be readily connected to the system with minimal connections. The inclusion of Manual Balance QuickSet valves in these packages is particularly noteworthy. These valves are equipped with a venturi, graduated memory stop, and Flow Optimizer, which simplifies the static balancing process and enhances overall valve performance.

      Benefits and Outcomes:

      The integration of Griswold Controls’ high-quality components into the Zoetis Vivarium project not only facilitates the operational efficiency of the facility but also contributes to the broader goal of creating sustainable and environmentally friendly manufacturing processes. The success of this project serves as a testament to the collaborative efforts of companies like Zoetis and Hydronic Energy, Inc., and the innovative solutions provided by manufacturers like Griswold Controls.  

      This sets a benchmark for future projects in the industry, where the synergy between advanced pharmaceutical manufacturing and sustainable practices can lead to remarkable outcomes.

      Products Used:

      The Zoetis Vivarium project incorporated Griswold Controls Coil Piping Packages, designed to simplify the installation process and ensure system integrity. These packages include all necessary components for a complete coil connection, simplifying on-site assembly. Additionally, the QuickSet Manual Balance Valves were chosen for their precision and reliability, featuring brass venturi inserts for flow measurement and graduated memory stops for flow setting. 

      Photos from Business Wire

      About Hydronic Energy

      Founded in 1978, Hydronic Energy is a manufactures representative that sells HVAC equipment in commercial, residential, and industrial markets in Iowa, Nebraska, Eastern South Dakota, and Western Illinois. They represent the best manufactures in the industry and their goal is to bring integrity and the highest level of service possible to our customers.

      Featured Projects
      Have a question about this or another Featured Project? Fill out the form below and someone from Griswold Controls will get back to you shortly.


        Please prove you are human by selecting the flag.

        RUTGERS UNIVERSITY: RWJUH CENTER FOR INNOV...

        RUTGERS UNIVERSITY: RWJUH CENTER FOR INNOVATION  Location: New Brunswick, New Jersey Completion Date: September 2023 Sales Representative: Wales Darby Griswold Products Used: Pre-assembled Coil Piping Packages...

        PRINCETON UNIVERSITY CBE BUILDING

        Location: Princeton, New Jersey  Completion Date: 2025  Sales Rep: Wales Darby  Griswold Products Used: Pre-Assembled Coil Hookups (CPP-IRIS) with Isolator R Valves  Project Description  At the forefront...

        ANAZAO HEALTH

        Location: Tampa, Florida  Completion Date: Late 2024  Sales Rep: Florida Hydronics  Griswold Products Used: QuickSet Packages and Large Flanged QuickSet Manual Valves   Our thoughts are with the...

        JOAQUIN MURRIETA PARK

        Location: Tucson, Arizona  Completion Date: Late 2024  Sales Rep: SiteOne Landscape Supply  Griswold Products Used: DWS Series Dirty Water Irrigation Valves  Project Description:  The City of Tucson...

        Wesleyan University Science Building

        Location: Middletown, Connecticut Completion Date: 2026 Sales Rep: Mechanical Solutions, Inc. Griswold Controls Products Used: Isolator B Valve, Isolator S Valve, and Union   Description: For a...

        Yale New Haven Hospital Adams Neuroscience...

        Location: New Haven, Connecticut Completion Date: 2026 Sales Rep: Mechanical Solutions, Inc. Griswold Controls Products Used: Coil Piping Package including Isolator R Valve   Description: What started...

        Zoetis Vivarium

        Location: Lincoln, Nebraska Completion Date: August 2023 Sales Rep: Hydronic Energy, Inc. Griswold Controls Products Used: Coil Piping Package including QuickSet Manual Balance Valve   Description: A global...

        Homestead Wakefield Elementary School HVAC...

        Location: Bel Air, Maryland Completion Date: Fall of 2025 Sales Rep: Hydro Tec Sales and Service Griswold Controls Products Used: Coil Piping Package including QuickSet Manual Balance Valve...

        Spelman College

        Location: Atlanta, Georgia Completion Date: N/A Sales Rep: Hoffman Hydronics Griswold Controls Products Used: Coil Piping Package & QuickSet Manual Balance Valves and Strainers   Description: Nestled in the...

        UT Southwestern Medical Center

        Location: Dallas, Texas Completion Date: 2023 Sales Rep: Texas Air Systems Griswold Controls Products Used: Coil Piping Piping Packages including Automatic Flow Limiting IR Valve   Description: The UT Southwestern has...

        400 Central Residency

        Location: St. Petersburg, Florida Griswold Controls Products Used: Hose Kits with Automatic Flow Limiting K Valves   Description: In the sun-kissed landscape of St. Petersburg, Florida, the soaring...

        Netflix Sound Stages

        Location: Alburquerque, New Mexico Date of Completion: 2024 FlowCon International Products Used: FlowCon E-JUST Valves Griswold Controls Products Used: Griswold Controls Quickset Valves   Description: Vibrant and film-friendly, Albuquerque...

        First Solar

        Location: Lawrence County, Alabama Date of Completion: 2025 Griswold Controls Products Used: 3” to 24” Wafers with Automatic Flow Limiting cartridges and Quickset Brass Valves   Description: Sustainability...

        Arizona Western College – DeAnza Residen...

        Location: Yuma, Arizona Griswold Controls Products Used: CPP-2IRIS and CPP 3IRIS with Unimizer Actuated Valves   Description: Arizona Western College (AWC) is anticipating a proud celebration: the completion...

        University of Michigan – Leinweber B...

        Location: Ann Arbor, Michigan Date of Completion: Summer 2025 Griswold Controls Products Used: QuickSet Coil Piping Packages (CPPs) with Hoses   Description: For those who don’t know: The...

        Celina Elementary School

        Location: Celina, Ohio Date of Completion: Summer 2024 Griswold Controls Products Used: Custom AHU CPPs, CPP-2BIS, and Flanged QuickSet   Description: Welcome to Celina Elementary School, an idyllic,...

        LAX Automated People Mover

        Location: Los Angeles, California Date of Completion: 2023 Griswold Controls Products Used: Coil Piping Packages & Large Flanged QuickSet   Description: Los Angeles International Airport (LAX), a global aviation...

        Lake Land College – Neal Hall

        Location: Mattoon, Illinois Date of Completion: Started Feb. 1st, 2023 Griswold Controls Products Used: CPP-QuickSet & QuickSet Manual Balance Valves   Description: Neal Hall is located on Lake...

        Peppermill Resort Tower

        Location: Reno, Nevada Date of Completion: Late 2023 Griswold Controls Products Used: Almost 2000 Automizer Coil Piping Packages with KMC Actuators Installed by GC   Description: Nestled in...

        West Henderson Hospital Tower

        Location: Las Vegas, Nevada Date of Completion: Late 2024 Representative: Norman S. Wright Griswold Controls Products Used: Approximately 500 CPP-2IRIS packages with customer supplied ATCs Installed by Griswold...

        Aurum Golden Apartments

        Location: Golden, Colorado Date of Completion: 2022 Representative: LONG Building Technologies, Inc. Griswold Controls Products Used: Streamline Control   Description: The Garden of the Gods, the Rocky Mountain Range,...

        Hostess Brands

        Location: Arkansas Date of Completion: August 1st, 2022 Representative: Fluid Solutions Griswold Controls Products Used: Balancing all aspects of their HVAC system leading to balanced flow at all times,...

        Parcel 12

        Location: Boston, Massachusetts Date of Completion: TBD Griswold Controls Products Used: Automatic Flow Limiting valves Grooved End – 4”-12” and K Valves Benefit of Griswold Controls Products: Balanced Hydronic...

        Covenant Health West Tower

        Location: Lubbock, TX Date of Completion: 2021 Representative: Texas AirSystems Griswold Controls Products Used: Manual CPPS - 2QIS   Description: The life expectancy in the US is now...

        L&I/WSDA Safety and Health Lab

        Location: Tumwater, WA Date of Completion: November 2022 Representative: Proctor Sales Griswold Controls Products Used: Automatic & Manual CPPS - 2IRIS and 1QIB   Description: Facility Description: The...

        North Seattle College Library Renovation

        Location: Seattle, Washington Date of Completion: 2021 Representative: Proctor Sales Griswold Controls Products Used: Automatic CPP-2IRIS with Unimizers   Description: Space Needle, national parks, and rain: these are...

        Lowell Elementary School

        Location: Waterloo, Iowa Date of Completion: Estimated - January 2022 Representative: Hydronic Energy Griswold Controls Products Used: CPP-IRIS, Flanged QuickSet, Uni-Flange, and Isolator R valve   Description: 90...

        Aquarium of the Pacific – Otter Surr...

        Video Credit: YouTube

        Location: Long Beach, CA Date of Completion: 2021 Representative: J.D. Sales Griswold Controls Products Used: Isolator Y & Combination valves including automatic flow limiting, isolation,...

        GM Lordstown Electric Battery Plant

        Location: Lordstown, Ohio Date of Completion: June 2021 Representative: R.L. Deppmann Griswold Controls Products Used: QuickSet Manual Balance Valves   Description: Facility Description: What do Grand Central Station,...

        Winthrop Center

        Location: Boston, Massachusetts Date of Completion: July 2021 Representative: Equipment Direct Sales Griswold Controls Products Used: Grooved End Valves 12" and 14"   Description: Facility Description: Massachusetts: even...

        eBay Utah Data Center – Pressure Ind...

        Location: Salt Lake City, Utah Date of Completion: 2013 Griswold Controls Products Used: Pressure Independent MVP Valves   Description: Facility Description: Have you ever been surfing on...

        Educational Learning Center

        Location: Coquitlam, British Columbia Date of Completion: 2021 Representative: Riada Sales Inc Griswold Controls Products Used: CPP-2 PIC-V, CPP 2IRIS w/ Automatic Flow Limiting Valves, CPP-2IRIS w/ 3-way...

        Olympic Regional Development

        Location: Lake Placid, New York Date of Completion: 2021 Representative: FP Langley Company Griswold Controls Products Used: 18" Flanged QuickSet   Description: Facility Description: With so much history...

        Bentall Skyrise

        Location: Vancouver, British Columbia Date of Completion: 2021 Representative: Riada Sales Inc. Griswold Controls Products Used: Custom CPP-6IRIS Coil Piping Packages for installation on 6-way control valves.  ...

        City of Hope Cancer Center – Irvine

        Location: Irvine, California Date of Completion: 2021 Representative: J.D. Sales Griswold Controls Products Used: QuickSet Manual Balance Valves -Brass and Steel Flange versions and other complementary components (Flanged...

        Facebook Data Center – New Mexico

        Location: Los Lunas, New Mexico Date of Completion: 2021 Representative: Massey Johnson Associates Griswold Controls Products Used: Isolator U, Isolator S   Description: Facility Description: $1 billion dollars...

        Wester Middle School

        Location: Frisco, Texas Date of Completion: 2021 Representative: Texas AirSystems Griswold Controls Products Used: CPP-2IRIS Coil Piping Package   Description: Facility Description: Wester Middle School serves not only...

        First National Bank Tower

        Location: Omaha, Nebraska Date of Completion: 2002 Representative: Hydronic Energy Griswold Controls Products Used: Originally built with Ultra Z Packages. Now being retrofitted with approximately 800 CPP-IY kits....

        Arizona State University- Interdisciplinar...

        Location: Tempe, Arizona Date of Completion: To be completed in 2022 Representative: Varitec Solutions Griswold Controls Products Used: 2000 CPP’s IR’s IS’s and IB’s – ½” and ¾”...

        320 York Street- Yale’s Hall of Grad...

        Location: 320 York St, New Haven Connecticut Date of Completion: Fall 2020 Representative: Mechanical Solutions Griswold Controls Products Used: CPP-2IRIS Packages with QuickPress and customer supplied ATCs Description: Facility...

        We Would Love to See Your Projects!

        Do you have a project that showcases Griswold Controls products?

        We would love to feature you! Submit a contact form with project details so we can feature the project on our website.

        Homestead Wakefield Elementary School HVAC Upgrade

        Location: Bel Air, Maryland

        Completion Date: Fall of 2025

        Sales Rep: Hydro Tec Sales and Service

        Griswold Controls Products Used: Coil Piping Package including QuickSet Manual Balance Valve

         

        Description:

        The community of Bel Air, Maryland has been planning this exciting project for over 30 years: Homestead Wakefield Elementary School. Since 1958, this school has served it’s community by helping students reach their full potential. Now, the town of Bel Air and the school agree: an update is long deserved.  

         

        Challenges and Solutions:

        One of the primary challenges was retrofitting the school buildings with a modern HVAC solution that could meet the school’s needs without disrupting the educational process. Hydro Tec Sales and Service, leveraging their extensive HVAC expertise, recommended Griswold Controls Coil Piping Packages and QuickSet Manual Balance Valves for their proven performance in educational settings.

        Modular design was selected to meet the school’s needs and site conditions while providing flexibility and scalability. The new modular design, which includes a modular complex with classrooms, a cafeteria, and a multipurpose room. The design of these modular classrooms aims to replicate the environment of permanent structures, ensuring that temporary facilities maintain the same high-quality standards. 

        The Coil Piping Packages from Griswold Controls were chosen for their ability to reduce labor costs and minimize potential leak points. These pre-assembled systems are ideal for a school setting, where streamlined product distribution and simplified purchase order processes are paramount. For more information on applications in schools and universities, please refer to Griswold Controls’ application tips. These Coil Piping Packages were outfitted with QuickSet Manual Balance Valves. These were selected for their user-friendliness and precise flow control, crucial for maintaining a balanced and efficient HVAC system. 

        Benefits and Outcomes:

        The integration of Griswold Controls’ products led to a streamlined installation process, significantly reducing both the time and cost associated with the upgrade. The QuickSet Manual Balance Valves provided precise flow control, essential for the optimal functioning of the HVAC system, while the Coil Piping Packages ensured a hassle-free installation with minimal risk of leaks. These benefits are perfect for the modular design and an educational application. 

        The upgraded HVAC system will also enhance indoor air quality, creating a healthier environment for students and staff, which can lead to better concentration and overall improved academic performance. 

        Products Used:

        The Homestead Wakefield Elementary School project incorporated Griswold Controls Coil Piping Packages, designed to simplify the installation process and ensure system integrity. See why education institutions trust our products.

        These packages include all necessary components for a complete coil connection, simplifying on-site assembly which was an important factor in this project. Additionally, the QuickSet Manual Balance Valves were chosen because they are specifically known for their precision and reliability, which include brass venturi inserts for flow measurement and graduated memory stops for flow setting.

        Photos from Banta Campbell

        About Hydro Tec Sales and Service

        Hydro Tec Sales and Service is a leading provider of sustainable and efficient HVAC solutions. The company has a 25-year heritage in its local markets and over 60 years of combined sales experienceWith offices in Central Virginia, Metro Washington, D.C. and Baltimore, MD, Hydro Tec covers the marketing territories of Virginia, Maryland, and D.C.  Specializing in flow measurement and control, Hydro Tec offers multiple product lines from manual balancing valves and flow meters, to automatic flow and temperature control hook ups as a prefabricated package. 

        Featured Projects
        Have a question about this or another Featured Project? Fill out the form below and someone from Griswold Controls will get back to you shortly.


          Please prove you are human by selecting the truck.

          RUTGERS UNIVERSITY: RWJUH CENTER FOR INNOVATION

          RUTGERS UNIVERSITY: RWJUH CENTER FOR INNOVATION  Location: New Brunswick, New Jersey Completion Date: September 2023 Sales Representative: Wales Darby Griswold Products Used: Pre-assembled Coil Piping Packages...

          PRINCETON UNIVERSITY CBE BUILDING

          Location: Princeton, New Jersey  Completion Date: 2025  Sales Rep: Wales Darby  Griswold Products Used: Pre-Assembled Coil Hookups (CPP-IRIS) with Isolator R Valves  Project Description  At the forefront...

          ANAZAO HEALTH

          Location: Tampa, Florida  Completion Date: Late 2024  Sales Rep: Florida Hydronics  Griswold Products Used: QuickSet Packages and Large Flanged QuickSet Manual Valves   Our thoughts are with the...

          JOAQUIN MURRIETA PARK

          Location: Tucson, Arizona  Completion Date: Late 2024  Sales Rep: SiteOne Landscape Supply  Griswold Products Used: DWS Series Dirty Water Irrigation Valves  Project Description:  The City of Tucson...

          Wesleyan University Science Building

          Location: Middletown, Connecticut Completion Date: 2026 Sales Rep: Mechanical Solutions, Inc. Griswold Controls Products Used: Isolator B Valve, Isolator S Valve, and Union   Description: For a...

          Yale New Haven Hospital Adams Neuroscience Center

          Location: New Haven, Connecticut Completion Date: 2026 Sales Rep: Mechanical Solutions, Inc. Griswold Controls Products Used: Coil Piping Package including Isolator R Valve   Description: What started...

          Zoetis Vivarium

          Location: Lincoln, Nebraska Completion Date: August 2023 Sales Rep: Hydronic Energy, Inc. Griswold Controls Products Used: Coil Piping Package including QuickSet Manual Balance Valve   Description: A global...

          Homestead Wakefield Elementary School HVAC Upgrade

          Location: Bel Air, Maryland Completion Date: Fall of 2025 Sales Rep: Hydro Tec Sales and Service Griswold Controls Products Used: Coil Piping Package including QuickSet Manual Balance Valve...

          Spelman College

          Location: Atlanta, Georgia Completion Date: N/A Sales Rep: Hoffman Hydronics Griswold Controls Products Used: Coil Piping Package & QuickSet Manual Balance Valves and Strainers   Description: Nestled in the...

          UT Southwestern Medical Center

          Location: Dallas, Texas Completion Date: 2023 Sales Rep: Texas Air Systems Griswold Controls Products Used: Coil Piping Piping Packages including Automatic Flow Limiting IR Valve   Description: The UT Southwestern has...

          400 Central Residency

          Location: St. Petersburg, Florida Griswold Controls Products Used: Hose Kits with Automatic Flow Limiting K Valves   Description: In the sun-kissed landscape of St. Petersburg, Florida, the soaring...

          Netflix Sound Stages

          Location: Alburquerque, New Mexico Date of Completion: 2024 FlowCon International Products Used: FlowCon E-JUST Valves Griswold Controls Products Used: Griswold Controls Quickset Valves   Description: Vibrant and film-friendly, Albuquerque...

          First Solar

          Location: Lawrence County, Alabama Date of Completion: 2025 Griswold Controls Products Used: 3” to 24” Wafers with Automatic Flow Limiting cartridges and Quickset Brass Valves   Description: Sustainability...

          Arizona Western College – DeAnza Residence Hall

          Location: Yuma, Arizona Griswold Controls Products Used: CPP-2IRIS and CPP 3IRIS with Unimizer Actuated Valves   Description: Arizona Western College (AWC) is anticipating a proud celebration: the completion...

          University of Michigan – Leinweber Building

          Location: Ann Arbor, Michigan Date of Completion: Summer 2025 Griswold Controls Products Used: QuickSet Coil Piping Packages (CPPs) with Hoses   Description: For those who don’t know: The...

          Celina Elementary School

          Location: Celina, Ohio Date of Completion: Summer 2024 Griswold Controls Products Used: Custom AHU CPPs, CPP-2BIS, and Flanged QuickSet   Description: Welcome to Celina Elementary School, an idyllic,...

          LAX Automated People Mover

          Location: Los Angeles, California Date of Completion: 2023 Griswold Controls Products Used: Coil Piping Packages & Large Flanged QuickSet   Description: Los Angeles International Airport (LAX), a global aviation...

          Lake Land College – Neal Hall

          Location: Mattoon, Illinois Date of Completion: Started Feb. 1st, 2023 Griswold Controls Products Used: CPP-QuickSet & QuickSet Manual Balance Valves   Description: Neal Hall is located on Lake...

          Peppermill Resort Tower

          Location: Reno, Nevada Date of Completion: Late 2023 Griswold Controls Products Used: Almost 2000 Automizer Coil Piping Packages with KMC Actuators Installed by GC   Description: Nestled in...

          West Henderson Hospital Tower

          Location: Las Vegas, Nevada Date of Completion: Late 2024 Representative: Norman S. Wright Griswold Controls Products Used: Approximately 500 CPP-2IRIS packages with customer supplied ATCs Installed by Griswold...

          Aurum Golden Apartments

          Location: Golden, Colorado Date of Completion: 2022 Representative: LONG Building Technologies, Inc. Griswold Controls Products Used: Streamline Control   Description: The Garden of the Gods, the Rocky Mountain Range,...

          Hostess Brands

          Location: Arkansas Date of Completion: August 1st, 2022 Representative: Fluid Solutions Griswold Controls Products Used: Balancing all aspects of their HVAC system leading to balanced flow at all times,...

          Parcel 12

          Location: Boston, Massachusetts Date of Completion: TBD Griswold Controls Products Used: Automatic Flow Limiting valves Grooved End – 4”-12” and K Valves Benefit of Griswold Controls Products: Balanced Hydronic...

          Covenant Health West Tower

          Location: Lubbock, TX Date of Completion: 2021 Representative: Texas AirSystems Griswold Controls Products Used: Manual CPPS - 2QIS   Description: The life expectancy in the US is now...

          L&I/WSDA Safety and Health Lab

          Location: Tumwater, WA Date of Completion: November 2022 Representative: Proctor Sales Griswold Controls Products Used: Automatic & Manual CPPS - 2IRIS and 1QIB   Description: Facility Description: The...

          North Seattle College Library Renovation

          Location: Seattle, Washington Date of Completion: 2021 Representative: Proctor Sales Griswold Controls Products Used: Automatic CPP-2IRIS with Unimizers   Description: Space Needle, national parks, and rain: these are...

          Lowell Elementary School

          Location: Waterloo, Iowa Date of Completion: Estimated - January 2022 Representative: Hydronic Energy Griswold Controls Products Used: CPP-IRIS, Flanged QuickSet, Uni-Flange, and Isolator R valve   Description: 90...

          Aquarium of the Pacific – Otter Surrogacy

          Video Credit: YouTube

          Location: Long Beach, CA Date of Completion: 2021 Representative: J.D. Sales Griswold Controls Products Used: Isolator Y & Combination valves including automatic flow limiting, isolation,...

          GM Lordstown Electric Battery Plant

          Location: Lordstown, Ohio Date of Completion: June 2021 Representative: R.L. Deppmann Griswold Controls Products Used: QuickSet Manual Balance Valves   Description: Facility Description: What do Grand Central Station,...

          Winthrop Center

          Location: Boston, Massachusetts Date of Completion: July 2021 Representative: Equipment Direct Sales Griswold Controls Products Used: Grooved End Valves 12" and 14"   Description: Facility Description: Massachusetts: even...

          eBay Utah Data Center – Pressure Independent MVP Valves

          Location: Salt Lake City, Utah Date of Completion: 2013 Griswold Controls Products Used: Pressure Independent MVP Valves   Description: Facility Description: Have you ever been surfing on...

          Educational Learning Center

          Location: Coquitlam, British Columbia Date of Completion: 2021 Representative: Riada Sales Inc Griswold Controls Products Used: CPP-2 PIC-V, CPP 2IRIS w/ Automatic Flow Limiting Valves, CPP-2IRIS w/ 3-way...

          Olympic Regional Development

          Location: Lake Placid, New York Date of Completion: 2021 Representative: FP Langley Company Griswold Controls Products Used: 18" Flanged QuickSet   Description: Facility Description: With so much history...

          Bentall Skyrise

          Location: Vancouver, British Columbia Date of Completion: 2021 Representative: Riada Sales Inc. Griswold Controls Products Used: Custom CPP-6IRIS Coil Piping Packages for installation on 6-way control valves.  ...

          City of Hope Cancer Center – Irvine

          Location: Irvine, California Date of Completion: 2021 Representative: J.D. Sales Griswold Controls Products Used: QuickSet Manual Balance Valves -Brass and Steel Flange versions and other complementary components (Flanged...

          Facebook Data Center – New Mexico

          Location: Los Lunas, New Mexico Date of Completion: 2021 Representative: Massey Johnson Associates Griswold Controls Products Used: Isolator U, Isolator S   Description: Facility Description: $1 billion dollars...

          Wester Middle School

          Location: Frisco, Texas Date of Completion: 2021 Representative: Texas AirSystems Griswold Controls Products Used: CPP-2IRIS Coil Piping Package   Description: Facility Description: Wester Middle School serves not only...

          First National Bank Tower

          Location: Omaha, Nebraska Date of Completion: 2002 Representative: Hydronic Energy Griswold Controls Products Used: Originally built with Ultra Z Packages. Now being retrofitted with approximately 800 CPP-IY kits....

          Arizona State University- Interdisciplinary Science and Technology Building VII

          Location: Tempe, Arizona Date of Completion: To be completed in 2022 Representative: Varitec Solutions Griswold Controls Products Used: 2000 CPP’s IR’s IS’s and IB’s – ½” and ¾”...

          320 York Street- Yale’s Hall of Graduate Studies

          Location: 320 York St, New Haven Connecticut Date of Completion: Fall 2020 Representative: Mechanical Solutions Griswold Controls Products Used: CPP-2IRIS Packages with QuickPress and customer supplied ATCs Description: Facility...

          North City Campus Modernization

          Location: Shoreline, WA Date of Completion: Fall 2019 Representative: Proctor Sales Griswold Controls Products Used: CPP-2IRISU, CPP-3IRISU with customer supplied Actuators Description: North City Campus Modernization includes the...

          MFSH NICU – Postpartum

          Location: Williamsville, New York Date of Completion: Spring 2019 Representative: F.P. Langley Co Griswold Controls Products Used: CPP-PICV with customer supplied Actuators Description: MFSH (Millard Fillmore Suburban Hospital)...

          The DMAFB General Instruction Building

          Location: Tucson, AZ Date of Completion: September 2019 Representative: Varitec Solutions  Griswold Controls Products Used: CPP-2IRIS Packages with customer supplied ATCs Facility Description: The U.S. Air Force, in conjunction with the...

          Monteleone Hotel Update, New Orleans

          Griswold Controls helps to preserve a New Orleans landmark via a retrofit of the HVAC system using control valves & coil piping packages. Application: Hotel Griswold Controls Solution:...

          University of California, Irvine

          A Higher Tech Education - Ease of installation and continued product support make the difference at UC Irvine Griswold Controls Solution: Automizer® Coil Piping Packages Contractor: A.O. Reed...

          Las Vegas’ Wynn Hotel & Casino

          Utilization of Griswold Controls coil piping packages to save a significant amount of install time for the new the new Wynn Las Vegas Resort. Application: Fan Coils, VAV...

          W Hotel & Victory Park, Dallas

          Griswold Controls helps to re-shape the downtown Dallas skyline, providing space saver packages to maximize floor space in the hotel. Application: Terminal Units, Vertical Heat Pumps & Horizontal...

          Southern Indiana Career and Technical Center

          Griswold Controls works with Indiana high school to operate the HVAC system as efficiently as possible using MVP Valves. Application: Air Handling Units Griswold Controls Solution: MVP Valves...

          Los Angeles Music Center’s Disney Concert Hall

          By providing piping packages to help offset installation costs and to take advantage of their space–saving features, Griswold Controls provided a cost-effective solution for the hot and chilled...

          University of California Merced

          Griswold Controls helps UC Merced meet it's "green" campus mission through the use of the 2000 series valves to operate the irrigation systems. Application: Irrigation Project Griswold Controls...

          David Braley Athletic Centre, McMaster University

          Replacing the conventional control and balancing valves with Griswold Controls pressure independent control valves to reduce energy consumption. Griswold Controls Has the Inside Track at McMaster University The...

          Hotel Intercontinental, Chicago, Illinois

          Griswold Controls products help improve room comfort for hotel guests by improving the limited control over heating and cooling for the individual rooms. Providing a Good Night's Rest...

          CBS Studios, Manhattan, New York

          Ensuring TV anchors keep their cool using MVP valves and Isolator™ Rs Uni-Flanges on chilled water system. CBS Studios building lights up Manhattan sky...

          Griswold Controls NEXT GENERATION products

          Griswold Controls launched their Next Generation product help to solve long unmet and unanswered issue in the HVAC industry. Controlling Industry Changes Director of...

          Vancouver International Airport Domestic Terminal

          Vancouver International Airport uses Griswold Controls MVP&trade valves to improve heating and cooling comfort issues and reduce energy consumption. Application: Airport Solution: MVP™ Valves Engineer/Consultant: MCW Engineering Controlling...

          Perdue School of Business Chilled Water

          Improved efficiency of the chilled water system at the new Perdue School of Business at Salisbury University through the use of PIC-V and MVP valves. Project: Salisbury University...

          Douthit Hills Dormitory

          Location: Clemson University Date of Completion: Unknown Representative: Heat Transfer Sales Griswold Controls Products Used: Isolator R CPPs Description: Located at the entrance to Clemson University along SC...

          Boston University Center for Integrated Science & Engineering

          Location: Boston, MA Date of Completion: Spring 2016 Representative: Conservation Solutions Corp Griswold Controls Products Used: FlowCon SM PICV and Green PICV Description: A Boston University $140 million,...

          Southern Tier Hi-Tech Incubator

          Location: Binghamton, New York Date of Completion: Unknown Representative: FP Langley QuikSet CPP Description: Binghamton University, SUNY Broome and the regional economic development community are building an incubator...

          The Van Ness Campus at Cathedral Hill Hospital

          Location: San Francisco, California Date of Completion: Unknown Representative: California Hydronics Corporation (CHC) Griswold Controls Products Used: Lead Free K-Valves Description:  Located in San Francisco, The Van Ness...

          Mount Carmel East, New Ned Tower

          Location: Columbus, Ohio Date of Completion: Unknown Representative: Kevin McGovern Associates Griswold Controls Products Used: 3/4" – 1-1/2", 2QIS & 3QIS Sweat CPPs Description: Mount Carmel Health is...

          New Trier High School

          Location: Chicago, Illinois Date of Completion: Unknown Representative: Imbert Corporation Griswold Controls Products Used: 3/4" – 2", 2QIS Sweat CPPs Description: New Trier serves about 4,200 students from...

          Delray Medical Center

          Location: Delray Beach, Florida Date of Completion: Early 2017 Representative: Diversified Fluid Controls Griswold Controls Products Used: 1/2" – 1-1/2" L, 2IRIS Female cpps w/SS Ball&Stem, Exts &...

          Tukh Cambridge North Tower

          Location: Kansas City, Kansas Date of Completion: 2018 Representative: Diversified Fluid Controls Griswold Controls Products Used: 1/2" – 1-1/2", 2QIS & 3QIS Sweat CPPs Description: The University of...

          We Would Love to See Your Projects!

          Do you have a project that showcases Griswold Controls products?

          We would love to feature you! Submit a contact form with project details so we can feature the project on our website.

          Spelman College

          Location: Atlanta, Georgia

          Completion Date: N/A

          Sales Rep: Hoffman Hydronics

          Griswold Controls Products Used: Coil Piping Package & QuickSet Manual Balance Valves and Strainers

           

          Description:

          Nestled in the vibrant heart of Atlanta, Georgia, Spelman College stands as an emblem of academic excellence and historic significance. As a beacon of higher learning, Spelman College has continually upheld its commitment to innovation and sustainability. As an important part to the heart of Georgia and as America’s oldest private historically black liberal arts college for women, Spelman has been a cradle of leadership and academic excellence since its inception in 1881. With a legacy full of tradition, Spelman college is a testament to the enduring power of education: to transform lives and communities. As Spelman continues to evolve, it remains true to its mission of providing an exceptional education to women who will make a difference in the world. The college’s illustrious alumni and their laundry list of contributions to society are a testament to the impact of Spelman College.

          As Spelman continues to evolve, it remains true to its mission of providing an exceptional education to women who will make a difference in the world. The college’s illustrious alumni and their myriad contributions to society are a testament to the transformative impact of a Spelman education.

          In pursuit of this ethos, the college embarked on a transformative journey to upgrade its HVAC systems, setting a new standard for energy efficiency and comfort across its esteemed campus.

          The cornerstone of Spelman College’s HVAC upgrade project lies in the integration of Griswold Controls Coil Piping Packages, meticulously curated to ensure reliability and ease of installation. Spearheaded by Hoffman Hydronics – Georgia, this project aims to retrofit the existing infrastructure with cutting-edge HVAC solutions, aligning with the college’s vision for sustainability and operational excellence.

          Challenges and Solutions:

          The challenge was clear—to seamlessly retrofit the existing infrastructure with a modern HVAC solution that could meet the college’s stringent requirements for performance and sustainability. Hoffman Hydronics, leveraging their profound expertise in hydronic solutions, recommended Griswold Controls’ Coil Piping Packages, equipped with QuickSet Manual Balance Valves and strainers, for their unparalleled reliability and efficiency.

          Benefits and Outcomes:

          The implementation of Griswold Controls’ products proved instrumental in streamlining the upgrade process, significantly reducing both time and costs. If this project is completed on schedule, the Coil Piping Packages will have played a large role in saving time and minimal disruption to college operations. Overall, the project heralded improved environmental conditions and substantial energy savings.

          Products Used:

          For the HVAC system enhancement at Spelman College, a comprehensive solution meticulously designed to uphold system integrity and streamline the installation process was needed. Enter the Griswold Controls Coil Piping Package. These packages encompass all essential components required for a complete coil connection, simplifying on-site assembly to ensure a hassle-free installation experience.

          In addition, QuickSet Manual Balance Valves were chosen and it’s easy to see why. Renowned for their precision, these valves facilitate easy and accurate manual flow settings. This ensures the HVAC system operates at peak efficiency, meeting Spelman College’s exacting standards.

          Finally, strainers were employed to safeguard the system from particulate matter, thus maintaining clean water flow and extending the lifespan of HVAC components while reducing maintenance needs.

          Together, these products played a pivotal role in achieving a successful system upgrade, furnishing Spelman College with an enhanced HVAC infrastructure that aligns seamlessly with their commitment to performance and sustainability.

          Photo from WABE

          About Hoffman Hydronics

          Hoffman Hydronics – Georgia stands as a pillar of excellence providing sustainable and efficient hydronic solutions. Their unwavering commitment to excellence and customer satisfaction made them the ideal partner for Spelman College’s HVAC upgrade project, ensuring that the college’s facilities were upgraded to the highest standards of efficiency and performance.

          We Would Love to See Your Projects!

          Do you have a project that showcases Griswold Controls products?

          We would love to feature you! Submit a contact form with project details so we can feature the project on our website.

          Featured Projects
          Have a question about this or another Featured Project? Fill out the form below and someone from Griswold Controls will get back to you shortly.


            Please prove you are human by selecting the key.

            Arizona Western College – DeAnza Residence Hall

            Location: Yuma, Arizona
            Griswold Controls Products Used: CPP-2IRIS and CPP 3IRIS with Unimizer Actuated Valves

             

            Description:

            Arizona Western College (AWC) is anticipating a proud celebration: the completion of its latest marvel – the DeAnza Residence Hall. This cutting-edge establishment will keep the DeAnza building name but will set the stage for a remarkable student-centric living experience on campus. As part of a grand $35 million capital building initiative, this state-of-the-art residence is poised to transform the campus atmosphere and enrich the overall student experience at AWC.

            For over 60 years, AWC has had student life as a priority. The DeAnza Residence Hall will be a testament to this fact and stand tall as a three-story architectural wonder, offering 216 double-occupancy rooms equipped with private bathrooms and mini-fridges. It doesn’t stop there; the hall will boast an array of amenities, from a theater room and fitness center to a rooftop patio, group study areas, laundry facilities, and convenient mail delivery. Designed to cultivate a strong sense of community and support academic excellence and personal growth, this residence will be a holistic haven for student life.

            Beyond its grandeur, the DeAnza Residence Hall champions eco-friendliness. With features like LED lighting, low-flow plumbing fixtures, and top-notch insulation, it will be an environmentally conscious establishment. Linked to the campus-wide geothermal system, it will harness the earth’s resources to ensure sustainable heating and cooling, reducing both the carbon footprint and utility expenses.

            Project Description:

            The realization of the DeAnza Residence Hall is made possible through comprehensive solutions from Griswold Controls. Specifically, the integration of CPP-2IRIS and CPP-3IRIS with Unimizer actuated valves. These will provide efficient flow control and precise temperature regulation within the hall’s HVAC systems.

            What sets this collaboration apart is the commitment to seamless solutions via one-stop shopping. Griswold Controls prides itself on providing a comprehensive and all inclusive package, encompassing both the Custom Packaged Pumping (CPP) system and the Unimizer actuated valve. This approach not only streamlines the procurement process but also ensures perfect compatibility and ease of installation.

            In opting for a singular source, AWC eliminates the logistical complexities of sourcing individual components separately. The synergy between the CPP and the Unimizer actuated valves harmonizes functionality, guaranteeing optimal performance, energy efficiency, and hassle-free operation within the DeAnza Residence Hall.

            This commitment to a unified, comprehensive solution underscores Griswold Controls’ dedication to simplifying the construction process, offering not just products, but a stress-free, efficient experience for their clients.

            About Varitec Solutions

            Varitec Solutions is a leader in the engineering, development, and installation of large-scale, energy-efficient HVAC systems for commercial buildings. Whether the objective of a customer is to start from scratch, upgrade an existing system, or set up an ongoing service and maintenance plan, we pride ourselves on being a single source for mechanical contractors, engineers, building owners, and general contractors alike. We attribute the sustained success of Varitec to our exemplary employees and dedication to providing world-class products and services.

            We Would Love to See Your Projects!

            Do you have a project that showcases Griswold Controls products?

            We would love to feature you! Submit a contact form with project details so we can feature the project on our website.

            Featured Projects
            Have a question about this or another Featured Project? Fill out the form below and someone from Griswold Controls will get back to you shortly.


              Please prove you are human by selecting the flag.

              University of Michigan – Leinweber Building

              Location: Ann Arbor, Michigan
              Date of Completion: Summer 2025
              Griswold Controls Products Used: QuickSet Coil Piping Packages (CPPs) with Hoses

               

              Description:

              For those who don’t know: The University of Michigan is renowned for its leadership in public research, particularly in computer science and information studies. In the spirit of keeping that reputation, the U of M is on the verge of a groundbreaking development. Take this quote from their website:

              “Computer, data, and information science are quickly becoming the backbone of systems that connect society. Creating a space where top scholars in computing and information can come together to help solve some of the greatest challenges in modern medicine, transportation, smart infrastructure, and more, will help the University of Michigan remain at the forefront of advances in computer science and information.”

              The university is crafting the Leinweber Computer Science and Information Building, a cutting-edge facility spanning 163,000 square feet. This architectural marvel will house the School of Information and offer expansion room for the Computer Science and Engineering Division of Michigan Engineering, uniting these two entities under one roof for the first time. The structure is set to boast active learning classrooms, adaptable research labs, student services areas, offices, and an array of collaborative spaces. Anticipated completion is set for Summer 2025.

              Project Description:

              At the heart of this contribution lies the enhancement of heating and cooling systems in the Leinweber Computer Science and Information Building.

              Key Product: Griswold Controls QuickSet Coil Piping Packages (CPPs) with Hoses

              The university chose RL Deppmann, a distinguished representative in HVAC and plumbing systems across Michigan and Ohio. A cornerstone of RL Deppmann’s contribution is the

              incorporation of Griswold Controls’ QuickSet Coil Piping Packages (CPPs) with hoses. These pre-assembled piping systems are comprehensive, including flow control valves, isolators, ball valves, unions, Y-strainers, temperature control valves, stainless steel hoses, insulated hoses, air vents, pressure/temperature test valves, and drain valves. The advantages are manifold, from streamlining installation to eliminating field assembly errors, reducing labor costs, saving energy, and minimizing maintenance expenses.

              What sets QuickSet CPPs with hoses apart is the use of the QuickSet manual balance valve, featuring a brass venturi insert and graduated memory stop. This valve allows precise flow adjustment and measurement, offering low-pressure drop, exceptional accuracy, and impeccable sealing. The QuickSet valve, with a union end connection, facilitates easy installation and removal, available in various end styles and sizes ranging from 2.5″ to 20.” Tailored for air handling units, chillers, towers, and pumps, these valves epitomize reliability and efficiency.

              Through the University of Michigan’s unwavering dedication to excellence, the Leinweber Computer Science and Information Building now guarantees peak performance and efficiency in its heating and cooling systems. This translates into a commitment to comfort and convenience for the faculty, staff, and students who will inhabit this pioneering facility. Griswold Controls takes immense pride in contributing to this historic investment, fortifying Michigan’s education and research infrastructure.

              Photos from Leinweber Building

              About R.L. Deppmann

              R.L. Deppmann is a stocking manufacturer representative. They are 100% owned by employees who broadly demonstrate 3 core values which are: Knowledge, Responsiveness, and Empowerment. They exist to help people make better decisions and their customers experience that every day through interactions with their customer service and inside sales teams, as well as their outside staff. They sell Boilers, Water Heaters, Heat Exchangers, Pumps, Steam Products, Valves, and specialties for HVAC & Plumbing systems in buildings as well as many industrial processes. They have warehouse facilities near ClevelandDetroitGrand Rapids, and Saginaw. Their facilities have a combined total of 32,000+ square feet of warehouse space to serve customers and as backup inventory for their stocking wholesalers.

              We Would Love to See Your Projects!

              Do you have a project that showcases Griswold Controls products?

              We would love to feature you! Submit a contact form with project details so we can feature the project on our website.

              Featured Projects
              Have a question about this or another Featured Project? Fill out the form below and someone from Griswold Controls will get back to you shortly.


                Please prove you are human by selecting the star.

                Celina Elementary School

                Location: Celina, Ohio
                Date of Completion: Summer 2024
                Griswold Controls Products Used: Custom AHU CPPs, CPP-2BIS, and Flanged QuickSet

                 

                Description:

                Welcome to Celina Elementary School, an idyllic, lake-side elementary school nestled in Celina, Ohio. With an enthusiastic community of 600 students and an array of programs and activities, this school champions academic brilliance, artistic flair, athletic prowess, and social connectivity.

                A relentless pursuit of creating the most conducive learning environment for both students and staff pays off (read more here). That is why the Celina school district decided to completely renovate existing PK-6 building & add an all-new grade 7-12 junior high. In this, the school decided to modernize its HVAC system by partnering with Griswold Controls.

                Their new lineup includes the Custom AHU CPPs, CPP-2BIS, and Flanged QuickSet, each a testament to precision and performance. These solutions are the top of the proverbial class in coil piping and manual balancing for air handling units, ensuring impeccable indoor air quality and comfort.

                But the advantages extend beyond these promises. Griswold Controls’ products are not just about quality; they are about time-saving and cost-efficiency. They simplify installation processes, slash labor costs, and significantly boost overall system efficiency. The result is an educational environment that’s not only comfortable but also environmentally conscious.

                With over six decades of profound expertise and innovation within the industry, Griswold Controls stands tall as an HVAC teacher’s favorite for HVAC solutions for educational institutions.

                Project Description:

                Celina Elementary School has undertaken an exciting $127 million dollar venture. Their existing building has undergone an exciting transformation – one that places the utmost importance on the HVAC system. Not only that, but they have added an 81,000 sq. ft. in educational space that will serve as the home of PK-3 students. The goal? To create a learning haven that’s comfortable, conducive, and healthy for students and staff alike.

                In the spirit of this vision, Griswold Controls has been chosen to play a pivotal role. Their Custom AHU CPPs, CPP-2BIS, and Flanged QuickSet have been selected to enhance the air handling units. These products exemplify the apex of coil piping and manual balancing solutions, ensuring flawless heat transfer and meticulous flow control.

                These components, each meticulously calibrated, align water flow in response to signals from the Building Automation System (BAS), resulting in consistent comfort levels regardless of external pressure fluctuations. The outcome? An HVAC system that delivers stellar performance, economizes time and finances during installation and upkeep, and concurrently promotes energy efficiency.

                With a remarkable legacy spanning over six decades in the industry, Griswold Controls stands side by side with Celina Elementary School. Together, they work towards a common goal – to provide quality education within a nurturing and responsive learning environment.

                About Kevin McGovern Associates

                Founded in 1930, Kevin Mcgovern Associates has operated in Central Ohio as Manufacturers’ Representatives for leading manufacturers of equipment used in Boiler Rooms, Commercial HVAC, Plumbing and Industrial Processes. Their product lines are geared primarily to major construction projects providing the consulting engineer with the “TOP OF THE LINE” manufacturers on major components for HVAC systems.  All of their personnel are active with the major mechanical contractors, commercial and industrial users on a day-to-day basis.  Parts and products are stocked in their warehouse for the product lines which require service.

                We Would Love to See Your Projects!

                Do you have a project that showcases Griswold Controls products?

                We would love to feature you! Submit a contact form with project details so we can feature the project on our website.

                Featured Projects
                Have a question about this or another Featured Project? Fill out the form below and someone from Griswold Controls will get back to you shortly.


                  Please prove you are human by selecting the key.

                  Lake Land College – Neal Hall

                  Location: Mattoon, Illinois
                  Date of Completion: Started Feb. 1st, 2023
                  Griswold Controls Products Used: CPP-QuickSet & QuickSet Manual Balance Valves

                   

                  Description:

                  Neal Hall is located on Lake Land Junior College Campus in Mattoon, Illinois. It houses a nursing lab, 2-D and 3-D art labs, a music classroom, a biology lab, a greenhouse, an earth science lab and general education classroom. This building is integral to helping the school serve a wide range of educational needs.  

                  The nursing lab in Neal Hall is a particularly noteworthy feature of the building. The lab provides students with hands-on experience in a simulated clinical setting, allowing them to practice their skills and gain confidence before entering the workforce. The lab is equipped with state-of-the-art technology and resources to support student learning.  

                  All of that was put on hold as a fire broke out in the building in 2020. The fire did most of its damage to the roof of the building but common areas, music, and art classrooms were also damaged. Interestingly, the fire itself was not the culprit for most of the damage. Smoke and water were deemed the main factors in the damage to the building. 

                  Overall, Neal Hall is an important part of Lake Land College’s mission to provide high-quality education to students in the east-central Illinois region. The building’s facilities and resources support student learning across many different disciplines, helping students achieve their academic and career goals. Getting Neal Hall back to 100% operating capacity is of utmost importance. 

                  Project Description:

                  The art labs in Neal Hall are also noteworthy. The 2-D art lab provides students with access to a wide range of materials and tools for drawing, painting, printmaking, and other forms of artistic expression. The 3-D art lab provides students with access to equipment for sculpture, ceramics, and other forms of three-dimensional art. 

                  Could you imagine a 3-D art lab or a nursing lab without proper heating, ventilation, and air conditioning? 

                  The QuickSet CPP forged brass manual balance valve with brass venturi insert and graduated memory stop wouldn’t be as good as it is without a valve housing that includes a field repairable dual Teflon and EPDM o-ring seal stem. The QuickSet manual balance valves are set to design flowrate in the field by the balancing contractor. The valves help control the heating and cooling flowrate to each zone in the building optimizing the customer’s comfort.

                  Photos from Lake Land College & JGTC

                  About Imbert Corporation

                  Their company and its team members have been striving to provide their customers with solutions to their HVAC needs. With their engineered products (such as BAC cooling towers, plate and frame heat exchangers, computer room air conditioning, and more) designed to meet or exceed the requirements of any application. With their wide range of products, they can offer you quality resolutions to today’s industry requirements.  https://www.imbertcorp.com/ 

                  We Would Love to See Your Projects!

                  Do you have a project that showcases Griswold Controls products?

                  We would love to feature you! Submit a contact form with project details so we can feature the project on our website.

                  Featured Projects
                  Have a question about this or another Featured Project? Fill out the form below and someone from Griswold Controls will get back to you shortly.


                    Please prove you are human by selecting the house.

                    L&I/WSDA Safety and Health Lab

                    Location: Tumwater, WA
                    Date of Completion: November 2022
                    Representative: Proctor Sales
                    Griswold Controls Products Used: Automatic & Manual CPPS – 2IRIS and 1QIB

                     

                    Description:

                    Facility Description:

                    The L&I/WSDA Safety and Health Lab Training Center is a state-of-the-art facility and here is proof that it absolutely fits that description. Term: State-of-the-art. Definition: the level of development (as of a device, procedure, process, technique, or science) reached at any particular time usually as a result of modern methods. The 53,154 square foot facility will provide a state-of-the-art environment for: food safety, hazardous chemical testing, offices, and conference rooms. They are living up to the term state-of-the-art by planning to include electric vehicle charging stations, high efficiency water fixtures, nighttime light pollution reduction system, and a low-energy LED interior lighting system. Furthermore, the lab area will be equipped with temperature control rooms, workspaces, and analytical instruments for staff. A larger training center will allow for more students to attend lessons at once, and a designated outdoor area will be available to demonstrate heavy earthmoving equipment, cranes, scaffolding, and more.

                    WSDA, currently has five labs squeezed into a former warehouse in Olympia, including a lab that conducts analysis important for food safety, a plant pathology lab, and a entomology lab

                    Project Description:

                    With the state’s efforts to decarbonize and transition to 100 percent clean energy over the next two decades, this project will showcase sustainable green building strategies that set the bar high for all new state buildings. Washington state is known to be one of the greenest states in US, so the choice of energy efficient automatic balancing valves fits in with the goal to reduce the city’s energy usage as the valves limit overflow of water and reduce pump energy.

                     

                    If you visit the L&I/WSDA Safety and Health Lab Training Center, you will find approximately 250 packages including automatic and manual CPPS, 2IRIS and 1QIB with customer supplied actuators. This Coil Piping Packing (CPP-2IRIS) has an automatic control flow limiting valve, a union with CPTA (Optional CPTA and Coin-Op Air vent or CPTA and Drain Valve). Isolator S has a combination Y-Strainer and Ball Valve with CPTA & Drain Valve (Optional 2nd CPTA).

                    Photos provided by DJC

                    About Proctor Sales

                    Proctor Sales (PSi) was founded in Seattle by John Proctor in 1957. The venture started as a small manufacturing company which produced natural gas to propane conversion plants and evolved into a sales rep business as more HVAC manufacturers sought representation in the growing Pacific Northwest. PSi still represents Weil-McLain which named the fledgling company its representative on April 3, 1957. Today, Proctor Sales is dedicated to carrying the strong history of John Proctor and Dick Newkirk into the future. At each of their offices an owner stands ready to make sure that PSi meets the obligations to their customers, manufacturer partners, and employee.

                    We Would Love to See Your Projects!

                    Do you have a project that showcases Griswold Controls products?

                    We would love to feature you! Submit a contact form with project details so we can feature the project on our website.

                    Featured Projects
                    Have a question about this or another Featured Project? Fill out the form below and someone from Griswold Controls will get back to you shortly.


                      Please prove you are human by selecting the heart.

                      North Seattle College Library Renovation

                      Location: Seattle, Washington
                      Date of Completion: 2021
                      Representative: Proctor Sales
                      Griswold Controls Products Used: Automatic CPP-2IRIS with Unimizers

                       

                      Description:

                      Space Needle, national parks, and rain: these are all things that students at North Seattle College are familiar with. Located north of one of the biggest cities in the US it is the suitably named North Seattle College.

                      When compared to all of the colleges in Washington state, North Seattle College ranks very high. According to this source, North Seattle ranks in the top 20% for highest post-graduation earnings. If that’s not impressive enough, the student to teacher ratio has dropped from 38:1 to 19:1 over the last 5 years.

                      The school is clearly making strides to improve as any good organization would, and one of those ways is through the quality of their HVAC systems. Seattle is known as one of the greenest cities in US, so the university’s choice of energy efficient balancing valves fits in with the goal to reduce the city’s energy usage.

                      Project Description:

                      For many people who went to college, we know that the library is the heartbeat of a school. Across the country there are plenty of libraries and all of them have hosted hours upon hours of study and helped millions of people achieve academic, professional, and personal goals. Studies show that being too-hot or too-cold isn’t conducive to learning so comfort is vital in a library and school. Read more here.

                      The forged brass automatic flow control valve assembly of the coil piping package includes an integrated isolation ball valve and stainless-steel flow control cartridge to maintain constant flow in spite of pressure changes. This cartridge can be removed for inspection or conveniently replaced without disturbing piping connections. Continuing that thread of convenience, the valve housing includes field repairable dual

                      Teflon and EPDM O-ring seal stem, with a nickel plated ball. Valves includes one fixed end connection and one union connection including a union nut and EPDM O-ring. Finally, the valve body has two ports with (1) Pressure/Temperature Test Valves, and (1) combination Pressure/Temperature Test Valves and manual air vent.

                      Photos from North Seattle College

                      About Proctor Sales

                      Proctor Sales Inc. is dedicated to carrying the strong history of John Proctor and Dick Newkirk into the future. At each of their offices an owner stands ready to make sure that PSi meets the obligations to their customers, manufacturer partners, and employees. They are extremely grateful to have the opportunity to be of service.

                      We Would Love to See Your Projects!

                      Do you have a project that showcases Griswold Controls products?

                      We would love to feature you! Submit a contact form with project details so we can feature the project on our website.

                      Featured Projects
                      Have a question about this or another Featured Project? Fill out the form below and someone from Griswold Controls will get back to you shortly.


                        Please prove you are human by selecting the plane.

                        Lowell Elementary School

                        Location: Waterloo, Iowa
                        Date of Completion: Estimated – January 2022
                        Representative: Hydronic Energy
                        Griswold Controls Products Used: CPP-IRIS, Flanged QuickSet, Uni-Flange, and Isolator R valve

                         

                        Description:

                        90 years ago, the world back then is almost unrecognizable today. Speakeasies and homelessness were rife in America due to prohibition and the Great Depression respectively, Pluto was just discovered, the Chrysler building opened, and gas was about 10 cents. Focus on the heart of Waterloo, IA, and you’ll find that Lowell Elementary was established. Located right off Highway 218 and Williston Ave, Lowell Elementary School had 352 enrolled students in 2015.

                        After more than 90 years of service to the community and a partially collapsed roof, it was time for an update. Fast forward to today, and Lowell Elementary is near completion after almost 2 years. With a total cost estimated at $24.21 million dollars, one should expect a wonderfully designed and constructed building.

                        Project Description:

                        Built on the same site as the original, the new building will be bigger and support more students while still finding ways to incorporate the old building, like keeping the unique triangular layout. Because of this, the designers had a huge dilemma when taking this project on. They wanted this building to be the best that it could be, even though the site is smaller and oddly shaped when compared to other schools built at a similar time. Furthermore, they wanted to incorporate the latest and greatest so that Lowell Elementary would not resemble any of the schools built in the last 20 years. This applies not only to the architecture but the HVAC as well.

                        The engineers took these requests and chose 4 efficient, durable, and cost-effective HVAC equipment from the top drawer: CPP-IRIS, Flanged QuickSet, Uni-Flange, and Isolator R valves. All of this equipment works well for different reasons.

                        1. Griswold Coil Piping Packages are pre-assembled piping systems that save time and reduce cost. We offer fully assembled coil hookups that can be readily connected to your system with as little as 4 connections. No more field assembled components.
                        2. Manual Balance Valves include brass venturi inserts for flow measurement and graduated memory stops for flow setting. Valves are available with multiple end connection options including a union end connections.
                        3. Automatic Flow Limiting Valves are found in many different applications. Specifically, Isolator R valves are available with a wide range of flows and PSID ranges and are the perfect choice for tight spaces. The stainless steel flow limiting cartridge has a spring-loaded cup that dynamically absorbs pressure fluctuations resulting from changing system conditions due to varying heating/cooling loads. These fluctuations in pressure, within a given pressure differential control range, do not change the flow through the valve, therefore the flow is controlled to within +/- 5% of the designed flow.

                        Photos from KWWL

                        About Hydronic Energy

                        Hydronic Energy is a manufactures representative that sells HVAC equipment in commercial, residential, and industrial markets in Iowa, Nebraska, Eastern South Dakota, and Western Illinois. They represent the best manufactures in the industry and their goal is to bring integrity and the highest level of service possible to their customers.

                        We Would Love to See Your Projects!

                        Do you have a project that showcases Griswold Controls products?

                        We would love to feature you! Submit a contact form with project details so we can feature the project on our website.

                        Featured Projects
                        Have a question about this or another Featured Project? Fill out the form below and someone from Griswold Controls will get back to you shortly.


                          Please prove you are human by selecting the flag.