End User – Building Type

Application Tips for a variety of applications and uses.

For an overview of all our products by complimentary product visit the HVAC 101 brochure.

Read about Griswold Controls’ work in multiple Industries

 

Business:

First National Bank Tower

First National Bank Tower

Engineering efficiency inside the tallest tower between Denver and Minneapolis.

Location Omaha, Nebraska
Date of Completion 2002
Representative Hydronic Energy
Griswold Controls Products Used Originally built with Ultra Z Packages. Now being retrofitted with approximately 800 CPP-IY kits.

Facility Description

The First National Bank Tower dominates the Omaha skyline, standing thirteen stories taller than the next tallest building in the city. At the time of its construction, it became the tallest building in a six-state region and remains the tallest tower between Denver, Colorado and Minneapolis, Minnesota.

The designers envisioned a landmark building that would embody both urban sophistication and Midwestern character. Rising 43 stories and encompassing approximately 999,100 square feet, the tower blends modern architecture with warm-colored masonry that reflects the region’s traditional aesthetic.

Five parking garages surround the tower and are connected through a network of private and public walkway tunnels, allowing pedestrians to move between buildings while protected from harsh Midwest weather.

Several unique features distinguish the tower:

  • Architectural setbacks around the structure create the visual effect of a flower blooming as the building rises.
  • The building has received four industry awards, including two from the American Council of Engineering Companies — the largest and oldest association of engineering firms.
  • A striking 10,000-square-foot winter garden on the north side of the tower serves as a major architectural focal point.

Project Description

Originally constructed in 2002 with Ultra Z packages, the First National Bank Tower is now undergoing a large-scale retrofit led by Hydronic Energy. The modernization includes the installation of approximately 800 Griswold Controls Isolator Y valve packages.

Isolator Y valves provide a wide range of flow and PSID options and include pressure/temperature test valves, a drain valve, and a choice of union end pieces. Their compact design makes them ideal for installations where space is limited.

A key benefit of the Isolator Y package is the easily accessible flow control cartridge, which can be serviced or replaced without breaking piping connections. This allows system flow adjustments to be made quickly and efficiently as building requirements evolve.

Products Used

CPP-IY Coil Piping Packages

Griswold Controls CPP-IY (Isolator Y) coil piping packages provide integrated flow control solutions for HVAC terminal units. Their compact configuration simplifies installation while maintaining precise system balancing and long-term reliability.

  • Terminal units and VAV box applications
  • Fan coil units and heat pump installations
  • Baseboard and cabinet heater systems
Featured Projects Have a question about this or another Featured Project?

Fill out the form below and someone from Griswold Controls will get back to you shortly.


    Please prove you are human by selecting the house.

    About Hydronic Energy

    Hydronic Energy is a manufacturer’s representative providing HVAC equipment for commercial, residential, and industrial markets across Iowa, Nebraska, Eastern South Dakota, and Western Illinois.

    Founded in 1978, Hydronic Energy focuses on representing leading manufacturers in the industry while delivering exceptional service and technical expertise. Their corporate office is located in Urbandale, Iowa, with a branch office in Omaha, Nebraska.

    We Would Love to See Your Projects!

    Do you have a project that showcases Griswold Controls products?
    We would love to feature you! Submit a contact form with project details so we can feature the project on our website.

    The Erie Insurance Building

    The Erie Insurance Building

    A LEED-certified workspace designed to inspire collaboration and support over 1,200 employees.

    Location Erie, Pennsylvania
    Date of Completion Spring 2019
    Representative F.P. Langley Co
    Griswold Controls Products Used CPP-2IRIS with QuickPress and customer supplied ATCs
    Erie Insurance Building

    Facility Description

    Erie Insurance Headquarters’ new office building is LEED-certified, environmentally friendly and will have four larger floors and three, smaller tower floors. It will be the largest building on ERIE's campus, housing up to 1,200 employees.

    The Erie Insurance Home Office expansion consists of a new seven-story building with impressive amenities. For example, this building features an atrium, presentation venue, employee recognition display area, exercise area and serves as a primary connector-tying the buildings on the west side of campus to the main buildings on the east. Additionally, the new facility will serve the office and common public spaces to facilitate communication and interaction for over 12,000 employees. A library and café are included to enhance the complex.

    The campus complex of approximately 307,158 square feet, includes bridges connecting the 8th Technical Learning Center to the new office building. In addition, the campus will connect to the Perry Square Building. Architect Albert Kahn and Associates, Inc. and General Contractor PJ Dick are working together to oversee the Erie Insurance Home expansion where Griswold Controls installed GCPS-2IRIS with QuickPress and customer supplied ATCs.

    Erie Insurance CEO Timothy G. NeCastro stated "ERIE employees are the heart of this company," continued NeCastro. "It's their dedication and commitment to our customers, agents and one another that has led to our continued success. Their work environment needs to effectively support their day-to-day efforts to deliver exceptional service and their ongoing development to ensure that they have the opportunity to learn and grow with ERIE."

    About F.P. Langley Co

    Frank P. Langley Company is a manufacturers’ representative specializing in fluid handling products. They serve the HVAC, plumbing, industrial, and sprinkler markets with product lines representing premier manufacturers in the industry for nearly 80 years. The Frank P. Langley Company was founded in Buffalo, NY by Frank P. Langley Sr. in 1938. Frank P. Langley Jr. joined the company in 1955 and helped establish it as the premier fluid handling representative in Upstate New York and Northern Pennsylvania.

    Featured Projects Have a question about this or another Featured Project?

    Fill out the form below and someone from Griswold Controls will get back to you shortly.


      Please prove you are human by selecting the star.

      We Would Love to See Your Projects!

      Do you have a project that showcases Griswold Controls products?

      We would love to feature you! Submit a contact form with project details so we can feature the project on our website.

       

      Education:

      No posts found

       

      Entertainment:

      Netflix Sound Stages

      Netflix Sound Stages – Albuquerque, NM

      Expanding U.S. production capacity with FlowCon E-JUST and Griswold Controls QuickSet Valves for precision HVAC flow control.

      Location: Albuquerque, New Mexico
      Completion Date: 2024
      FlowCon International Products Used: FlowCon E-JUST Valves
      Griswold Controls Products Used: Griswold Controls QuickSet Valves

      Photo from Seattle Times

      Project Description

      The Netflix Sound Stages in Albuquerque, New Mexico, are part of a major expansion to support the U.S. production hub. The project includes 10 new sound stages, enhancing Netflix’s production capacity and supporting films and series like Stranger Things and El Camino: A Breaking Bad Movie.

      The goal was to provide high-quality production spaces while ensuring precise HVAC performance for optimal temperature, humidity, and acoustic conditions. The project called for both automatic and manual flow control for the chilled and hot water systems to maintain reliable climate conditions across all sound stages.

      FlowCon E-JUST Valves were used for automatic flow balancing, while Griswold Controls QuickSet Valves enabled precise manual balancing and flow measurement. Together, they ensure the HVAC system delivers consistent, reliable performance across all stages.

      Challenges and Solutions

      • Maintaining Stable Climate for Production Spaces
        Sound stages require consistent temperature and humidity levels to prevent disruptions during filming. The HVAC system needed to handle variable loads and seasonal changes while minimizing noise and vibration.
      • Precise Flow Control Across Multiple Zones
        Balancing chilled and hot water flow throughout the facility was critical. Manual adjustments alone were insufficient; automatic and manual valves were required to achieve precise regulation and maintain performance.

      FlowCon E-JUST Valves automatically regulate flow, absorbing pressure fluctuations, while Griswold Controls QuickSet Valves provide fine-tuned manual adjustments. This combination allowed the HVAC system to deliver consistent climate control efficiently across all sound stages.

      Benefits and Outcomes

      • Consistent Climate Control
        Automatic and manual valves ensure temperature and humidity remain stable across all production spaces, supporting high-quality filming conditions.
      • Energy Efficiency
        Precise flow regulation reduces energy consumption and operational costs while maintaining optimal performance.
      • Enhanced System Reliability
        The combination of FlowCon E-JUST and Griswold Controls QuickSet Valves provides dependable performance with minimal maintenance requirements.

      Products Used

      FlowCon E-JUST Valves

      FlowCon E-JUST Valves provide automatic balancing for HVAC systems. Their flow-limiting cartridge absorbs pressure changes and maintains a constant flow within +/- 5% of the design specification, ensuring reliable climate control across all zones.

      Griswold Controls QuickSet Valves

      QuickSet Valves allow for precise manual balancing and flow measurement. Featuring brass venturi inserts and graduated memory stops, these valves ensure accurate flow regulation, supporting optimal HVAC performance in sensitive production environments.

      Featured Projects Have a question about this or another Featured Project? Fill out the form below and someone from Griswold Controls will get back to you shortly.


        Please prove you are human by selecting the star.

        About Massey Johnson, Associates

        Massey Johnson, Associates was founded in 1974 when Billy Massey merged his company with Herlin Equipment Company. Today, Massey Johnson Associates is a commercial plumbing specification and engineered products representative, with five full-time employees in Albuquerque, ten in El Paso, and two in Colorado. They offer a well-rounded product portfolio including commercial plumbing, pumps, boilers, and other engineered products.

        We Would Love to See Your Projects!

        Do you...

        Peppermill Resort Tower

        Peppermill Resort Spa Casino – HVAC Renovation

        Reno, Nevada | Completed Late 2023

        Location: Reno, Nevada
        Date of Completion: Late 2023

        Photos from Peppermill Resort Reno

        Project Description

        Nestled in the heart of Reno, the Peppermill Resort Spa Casino stands as a symbol of opulence, comfort, and entertainment. Offering 1,621 guest rooms—including the 600-room all-suite Tuscany Tower—this resort delivers an unmatched guest experience across its spa, casino, restaurants, pools, fitness center, and bars.

        Currently, the resort is undergoing a significant renovation of the Peppermill Tower rooms, enhancing guest comfort with modern amenities and contemporary designs.

        Griswold Controls proudly contributed to this project by providing its industry-leading Automizer combination control valves and coil piping packages for the HVAC system. These solutions ensure optimal heating and cooling performance, precise temperature control, and maximum comfort for guests. Additionally, the products streamline installation, reduce labor and energy costs, and simplify long-term maintenance.

        With over 60 years of experience in HVAC valve manufacturing and flow control solutions, Griswold Controls brings precision, reliability, and innovation to every installation.

        Project Implementation

        The renovation focused on delivering a high-performance HVAC system capable of maintaining comfort across all rooms, 24/7. Griswold Controls’ Automizer valves integrate the functions of an actuated ball valve and a flow limiting valve, providing precise flow regulation for each coil in the system.

        Signals from the building automation system (BAS) control the Automizer valves, allowing consistent temperature and comfort levels regardless of pressure fluctuations. This approach ensures every guest experiences the same premium comfort, while optimizing energy use and system efficiency.

        Partnering for Excellence

        Griswold Controls’ contributions allowed the Peppermill Resort Spa Casino to elevate the guest experience while reducing installation complexity and operational costs. By combining innovative HVAC solutions with extensive industry expertise, the project reinforces the resort’s status as a premier destination for luxury, comfort, and entertainment in Reno, Nevada.

        Have a question about this or another Featured Project? Fill out...

        Aquarium of the Pacific – Otter Surrogacy

        Aquarium of the Pacific – Otter Surrogacy

        High-performance HVAC solutions supporting sea otter conservation and aquatic habitats in Long Beach, California.

        Location Long Beach, California
        Date of Completion 2021
        Representative J.D. Sales

        Description

        Over 11,000 animals representing 500 species inhabit the Aquarium of the Pacific, with exhibits ranging from 5,000 to 350,000 gallons. Recognized for sustainability, the aquarium is Platinum LEED-certified and has earned Green Globes certifications, reflecting its commitment to energy efficiency and ecological stewardship.

        The Aquarium of the Pacific is more than a display; it is a center for conservation and education. The facility breeds and rehabilitates endangered species, teaches climate resilience and community science, and ensures sustainable practices across all operations.

        Specifically, the sea otter habitat requires precise environmental control. With energy-efficient and high-performance HVAC, the aquarium ensures the comfort and health of its otters, which consume roughly 25% of their body weight daily and have the thickest fur of any mammal.

        Project Description

        Facility Description:
        The otter surrogacy tanks required reliable temperature control for delicate aquatic life. The Isolator Y valve was installed on the chilled water side of the heat exchanger, providing constant flow to the new tanks and accommodating system pressure fluctuations.

        Technical Benefits:
        The Isolator Y stainless steel cartridge absorbs system pressure changes while maintaining flow within ±5% of the designed flow. Unlike manual valves, automatic flow-limiting valves do not require balancing, reducing labor costs and ensuring stable performance. Isolator R, Isolator Y, and K valves offer a range of flows and PSID ranges, making them ideal for terminal boxes, VAV boxes, fan coil units, heat pumps, and baseboard/cabinet installations.

        All Automatic Flow Limiting Valves simplify installation and maintenance by allowing flow cartridges to be replaced without disturbing piping connections.

        Products Used

        Isolator Y & Combination Valves

        Griswold Controls Isolator Y valves and combination valves provide precise flow control for HVAC systems in aquatic environments. The valves automatically maintain design flow despite pressure fluctuations and do not require manual balancing, saving labor and ensuring consistent comfort.

        With accessible flow control cartridges, these valves are perfect for tight spaces and can be serviced without disrupting piping. They are widely used in terminal boxes, fan coil units, heat pump installations, and other specialized applications.

        Featured Projects Have a question about this or another Featured Project?

        Fill out the form below and someone from Griswold Controls will get back to you shortly.


          Please prove you are human by selecting the tree.

          About J.D. Sales

          J.D. Sales Company has partnered with Griswold Controls in Southern California since 1982. Their team exemplifies professionalism and dedication to upholding Griswold’s highest standards of product and service.

          For more information, visit www.jdsalesco.com.

          We Would Love to See Your Projects!

          Do you have a project that showcases Griswold Controls products?

          We would love to feature you! Submit a contact form with project details so we can feature the project on our website.

          Las Vegas’ Wynn Hotel & Casino

          Wynn Las Vegas Resort – Las Vegas

          Utilization of Griswold Controls coil piping packages to save a significant amount of install time for the new Wynn Las Vegas Resort.

          Project Overview

          Application Fan Coils, VAV Boxes
          Contractor Southland Industries & Hansen Mechanical
          Engineer/Consultant JBA Consulting Engineers
          Completion Date May 2006
          Griswold Controls Case Study - Las Vegas Wynn Hotel

          The most recent – and stunning – addition to the southern Nevada skyline is the new Wynn Las Vegas Resort. Built at a cost of $2.7 billion dollars and opened in April 2005, the 50-story bronze tower contains 2,700 luxury hotel rooms with floor-to-ceiling windows, 22 restaurants, the 2,000 seat “Aqua Theater-in-the-Round,” and the “Promenade” with luxury boutique shopping. Built on the site of the former Desert Inn, it also includes an 18-hole golf course. Whereas most high-end hotels have car rental desks, Wynn Las Vegas houses a Ferrari-Maserati car dealership inside the resort. The front entrance and three-acre Lake of Dreams are shielded from the street by a 140-foot tall mountain with 60-foot tall pine trees.

          Steve Wynn, who had previously built the Mirage (1989), Treasure Island (1993) and Bellagio (1998) hotels, conceived and developed Wynn Las Vegas. Several years ago he sold those three properties to MGM Grand in order to develop Wynn Las Vegas. This resort-casino clearly establishes a new threshold for local, high-end properties. JBA Consulting Engineers, Las Vegas, is the mechanical engineering firm responsible for the project. Bid and mechanical construction activity was divided into seven distinct areas, and the specification allowed for either automatic or manual flow controls. Southland Industries, Las Vegas, handled area one and the central plant, and Hansen Mechanical of Las Vegas was awarded responsibility for areas two through seven, which covered the tower.

          Engineered Equipment & Systems Co., the Griswold rep for southern Nevada, successfully convinced Southland Industries and Hansen Mechanical to utilize Griswold coil piping packages. Unimizers® were installed on a majority of the fan coils, VAV boxes, heating coils and heat pumps in the hotel rooms, showrooms, the Aqua Theater and the villas.

          According to Matt Miceli, the Engineered Equipment & Systems Co. sales engineer responsible for the project, the Unimizer packages significantly reduced Hansen’s ATC coordination costs. Matt said, “Hansen has been a Griswold Controls customer for some time. They especially like Griswold’s coil hookup packages and the way we shrink-wrap them. No other vendor provides this packaging concept. This project also offered them the opportunity to add the Unimizer® to the packages, which greatly simplified the coordination with the ATC contractor. The project time frame was extremely aggressive and the Unimizer® packages saved the contractor a significant amount of install time.” James Gomel, Hansen Mechanical project manager, stated, “The Griswold coil-piping packages allow for installation consistency to the systems along with a valuable savings in labor cost. In addition, incorporating the Unimizer® with the package allows for a complete installation of the coil-piping package, thus eliminating the need for additional labor required to install the controller in the field."

          In total, over 2,000 Griswold Controls piping packages are installed on the project along with over 20 air handler packages in area one. In addition to the flow controls and coil piping packages, Engineered Equipment & Systems Co. sold in excess of $100,000 worth of Griswold Filtration separators and separator package filtration systems for the numerous cooling towers on the project.

          Griswold Controls Case Studies

          Have a question about this or another Griswold Controls Case Study?

          Fill out the form below and someone from Griswold Controls will get back to you shortly.


            Please prove you are human by selecting the car.

            Los Angeles Music Center’s Disney Concert Hall

            Los Angeles Music Center’s Disney Concert Hall

            By providing piping packages to help offset installation costs and to take advantage of their space–saving features, Griswold Controls provided a cost-effective solution for the hot and chilled water fan coils and air handlers.

            Project Overview

            Application VAV Boxes, Terminal Boxes, Fan Coils & Air Handling Units
            Griswold Representative J.D. Sales
            Products Used Isolator™ Y Coil Piping Packages, Quickset® Manual Balance Valves, Automatic FCVs
            Mechanical Contractor ACCO Engineered Systems, Glendale, CA
            Case Study - Griswold Controls Los Angeles Music Center Disney Concert Hall

            An Iconic Venue for an Iconic Solution

            Walt Disney Concert Hall, Los Angeles

            The Concert Hall was designed by Frank Gehry, an internationally recognized architect whose many credits include the Guggenheim Museum in Bilbao, Spain and the American Center in Paris. The ceiling of the building features wavy, steel forms which are designed to appear like a ship with billowing sails at full mast.

            Groundbreaking commenced on the project in late 1999, and the Concert Hall was finally dedicated in 2003 at an ultimate cost of $274 million. This ‘monument to music’ became the key to the resurgence of downtown Los Angeles and a beacon for the extensive commercial and condominium housing development which has followed.

            The Griswold Controls Solution

            Griswold Controls’ Los Angeles rep, Mahendra Mistry, owner of JD Sales Co., worked with the project’s mechanical engineering firm, Levine/Seegel Assoc. of Santa Monica, CA, to obtain favorable specifications for Griswold Controls automatic FCVs, calling out individual FCVs for various terminal units per the piping arrangement shown on the drawings.

            ACCO Engineered Systems of Glendale, CA, the principal mechanical contractor, was intent on using piping packages to help offset installation costs as well as take advantage of their space–saving features without compromising the piping arrangement shown on the drawings. Mahendra worked closely with Frank Falcone, Bill Traub and Mike Masterman of ACCO to sell nearly 200 Isolator™ Y coil piping packages for installation on the VAV boxes and another 60+ automatic flow controls on the hot and chilled water fan coils and air handlers.

            Products installed:
            • ~200 Isolator™ Y Coil Piping Packages Installed on VAV boxes throughout the facility.
            • 60+ Automatic Flow Controls Installed on hot and chilled water fan coils and air handlers.
            • Quickset® Manual Balance Valves Installed on pump discharge risers in low-headspace basement conditions.

            Overcoming a Unique Installation Challenge

            Another challenge presented itself regarding the flow measuring devices specified on the pumps. The pumps were installed in the basement with limited headspace below the ceiling. None of the specified devices could be accommodated because of their requirement for normal upstream and downstream pipe diameters on the vertical discharge risers.

            Although not specified for these manual devices, Mahendra worked closely with ACCO through 4 submittals to gain approval of Griswold Controls’ Quickset® manual balance valves, utilizing their disturbed flow technology as the only alternative that would fit in the low headspace and still provide the specified accuracy.

            Griswold Controls and JD Sales are very proud of their involvement in this world–class project.

            Questions about this application? Contact info@GriswoldControls.com or 949.559.6000

            Griswold Controls Case Studies

            Have a question about this or another Griswold Controls Case Study?

            Fill out the form below and someone from Griswold Controls will get back to you shortly.


              Please prove you are human by selecting the car.

              CBS Studios, Manhattan, New York

              CBS Studios – New York City

              Ensuring TV anchors keep their cool using MVP valves and Isolator™ Rs Uni-Flanges on chilled water system.

              Project Overview

              Application Television and sound studios
              Contractor A.D. Winston Corporation, New York, NY
              Engineer/Consultant MDM Consulting Engineers
              Completion Date 2005 (Seven weeks for entire job)

              The Challenge

              CBS Studios Case Study

              CBS Studios faced a daunting challenge controlling cooling capacity in their Manhattan sound and TV studios. Manual balancers struggled due to multiple pumps and partial VFD control, making temperature control unreliable. Griswold Controls was contracted to provide a solution.

              Kristen Ortlinghaus of Griswold Controls and MDM Consulting Engineers collaborated to select the correct valves for the project. MVP™ pressure independent valves, Isolator™ Rs, and Uni-Flanges were chosen. The installation schedule was aggressive: first shipment in four weeks, complete installation in seven weeks.

              After completion, CBS was extremely satisfied, planning to use additional MVP valves and convert all manual-balanced coils to Griswold Controls products in the future.

              CBS Studios mechanical room

              Valve Products

              Isolator™ & “K” Automatic Flow Control Valves

              Isolator and “K” automatic flow control valves are available with a wide range of flows and PSID, and are ideal for tight spaces. These valves offer easily accessible flow control cartridges combined with isolation ball valves, allowing exchange of the flow control cartridge without breaking pipe connections if system flow requirements change. They also simplify maintenance of coils and temperature controls. Perfect for terminal boxes, VAV boxes, fan coil units, heat pump installations, and baseboards/in-cabinet applications.

              Isolator™-S K-Valve

              QuickSet® Manual Balance Valves

              QuickSet manual balance valves make proportional or static balancing simple and fast. Available in standard configurations or with accessory ports, QuickSet valves feature patented Optimizer® parabolic flow inserts for minimal handle movements and smooth flow changes. Full range handle position control ensures precise flow is achieved immediately. Ideal for casinos, hotels, VAV boxes, fan coil units, and heat pump installations.

              QuickSet®

              Unimizer® Actuated Control Valves

              Unimizer 2- and 3-way actuated control valves provide precise temperature control wherever actuated ball or globe valves are needed. They feature high close-off pressure, multiple Cvs for exact pressure drop matching, and equal percentage flow via the patented Optimizer® insert. Ideal for hotels, schools, terminal units, VAV boxes, air handling units, fan coil units, heat pump installations, equipment rooms, and pipelines.

              Unimizer®

              Automizer® Combination Control Valves

              Automizer all-in-one valves combine an actuated temperature control valve with a stainless steel automatic flow limiting cartridge. They integrate the entire return side of the coil in one unit: flow limiting valve, actuated 2-way control valve, and manual isolation ball valve. Patented Optimizer® ensures equal percentage flow characteristics. Ideal for schools, office buildings, VAV boxes, fan coil units, heat pump installations, and terminal boxes.

              Automizer®

              PIC-V® Pressure Independent Control Valves

              PIC-V pressure independent control valves maintain accurate flow regardless of pressure fluctuations, providing stable balancing at all points up to maximum flow rate, eliminating hot and cold spots. They combine balancing and control valve functionality into one compact housing. Perfect for office buildings, prisons, hospitals, laboratories, computer centers, and high-tech manufacturing.

              PIC-V®

              Questions about this application? Contact info@GriswoldControls.com or 949.559.6000

              Griswold Controls Case Studies

              Have a question about this or another Griswold Controls Case Study?

              Fill out the form below and someone from Griswold Controls will get back to you shortly.


                Please prove you are human by selecting the heart.

                 

                Food Industry:

                Hostess Brands

                Hostess Brands Facility

                Precision HVAC balancing supporting large-scale commercial food production in Arkansas.

                Location Arkansas
                Date of Completion August 1st, 2022
                Representative Fluid Solutions
                Griswold Controls Products Used Balancing valves supporting balanced HVAC flow across all zones


                Photos from Hostess Brands

                Description

                Donut, doughnut, or…Gefüllte Krapfen? Sounds like a sneeze, right? Schools teach us a lot of important things, but this might be a history lesson you don’t know: the donut, as we know it today, was originally named by the Germans, thus we have the “Gefüllte Krapfen!” Later, a more modern version was published in an English cookbook as a “dow nut.”

                The donut then made its way across the pond and into the very first instance of the traditional donut we know today. Since then, it has been a staple of American culture. 110 years after the arrival of the donut, Hostess Brands was born.

                For over a hundred years and through 23 avenues, Hostess Brands has been a delightful part of American tables. Today, they are best known for the Twinkie, Ding Dong, and Donette.

                Although Hostess wasn’t around in 1485 with the German donut, they chose the modern route — and not only with their donuts. They wanted a fantastic and modern way to do HVAC, much like the donut itself. Not only that, but making sweet treats is a precise art. Just ask grandma!

                Project Description

                If the oven was off a few degrees, would she be happy? If the bakers were too hot or too cold would their baked goods be as tasty? The correct answer is no.

                That is why Hostess Brands needed a balanced HVAC system that provides the right flow in every zone of the building.

                Valves provided in this project ranged anywhere from ½” pipe size to 10” pipe size, balancing all aspects of their HVAC system and ensuring precise heating and cooling throughout the facility.

                This means that the building maintains the correct amount of heating and cooling — 24 hours a day, 7 days a week.

                Products Used

                Griswold Balancing Valves

                Griswold Controls balancing valves ensure accurate flow control throughout large HVAC systems. In projects like the Hostess facility, balancing valves help maintain precise environmental conditions required for consistent food production.

                With pipe sizes ranging from ½” to 10”, the valves installed on this project ensured balanced flow across all HVAC zones, allowing production environments to maintain stable temperatures and airflow conditions.

                Balanced systems improve energy efficiency, increase system reliability, and ensure consistent comfort and operational performance across the entire facility.

                Featured Projects Have a question about this or another Featured Project? Fill out the form below and someone from Griswold Controls will get back to you shortly.


                  Please prove you are human by selecting the house.

                  About Fluid Solutions

                  Fluid Solutions Inc. is a company with a history spanning over 60 years. They partner with leading manufacturers to provide reliable HVAC equipment and solutions for commercial and industrial projects.

                  At Fluid Solutions, the focus is on providing effortless connections to the equipment customers need. By building strong relationships with trusted manufacturers, they ensure customers receive high-quality products supported by knowledgeable experts.

                  This approach provides peace of mind that every project is equipped with dependable equipment made by quality people.

                  We Would Love to See Your Projects!

                  Do you have a project that showcases Griswold Controls products?

                  We would love to feature you! Submit a contact form with project details so we can feature the project on our website.

                   

                  Health Care:

                  RUTGERS UNIVERSITY: RWJUH CENTER FOR INNOVATION

                  RUTGERS UNIVERSITY: RWJUH CENTER FOR INNOVATION

                  HVAC Flow Control Solutions for Advanced Healthcare Innovation

                  Location New Brunswick, New Jersey
                  Completion Date September 2023
                  Sales Representative Wales Darby
                  Griswold Products Used Pre-assembled Coil Piping Packages with QuickSet Manual Balance Valves

                  Project Description

                  We are proud to contribute to projects that push the boundaries of healthcare innovation and efficiency. Supporting the Center for Innovation at Robert Wood Johnson University Hospital with products designed to enhance comfort and precision in HVAC performance is an important part of Griswold Controls’ mission.

                  The Center for Innovation at Robert Wood Johnson University Hospital, part of Rutgers University, represents a forward-thinking approach to healthcare that merges cutting-edge technology with compassionate patient care. The facility provides an optimized environment for advanced medical research, training, and patient treatment.

                  To meet the specialized HVAC needs of this facility, Griswold Controls’ Pre-assembled Coil Piping Packages (CPP-Q) with QuickSet Manual Balance Valves were selected for installation. These packages provide precise flow control critical to maintaining optimal temperatures and air quality throughout the hospital’s spaces.

                  Challenges and Solutions

                  • Versatile Climate Control Across Specialized Areas
                    From research laboratories to patient care rooms, each area within the facility requires unique temperature and air quality control to meet regulatory standards and maintain patient comfort.
                  • Accurate Flow Regulation for High-Efficiency HVAC
                    The facility required precise flow control to maintain HVAC efficiency while preventing temperature fluctuations.

                  CPP-Q packages provide stable and regulated water flow to HVAC coils. The venturi design within the QuickSet balance valves enables fine adjustment of water flow rates, allowing each space to maintain its required climate conditions with minimal energy waste.

                  Benefits and Outcomes

                  • Customizable Temperature Control Across Multiple Spaces
                    Each package can be easily adjusted to match the specific environmental demands of different facility areas.
                  • Improved System Reliability
                    Griswold components are engineered for durability, allowing HVAC systems to operate continuously with minimal maintenance.

                  Product Overview

                  Coil Piping Packages (CPP-Q)

                  Griswold Controls’ Coil Piping Packages provide a compact and efficient design tailored for precise water flow regulation. They ensure consistent climate control across complex environments such as hospitals and research facilities.

                  QuickSet Manual Balance Valves

                  QuickSet Manual Balance Valves allow precise adjustment of water flow throughout HVAC systems. This enables facilities to maintain stable environmental conditions across multiple zones.

                  About Wales Darby

                  Family-owned and operated since 1974, Wales Darby facilitates the design, distribution, and technical support of energy-efficient systems for residential and commercial buildings. The company represents many of the world’s top HVAC, hydronic, and plumbing equipment manufacturers and serves building owners, developers, engineers, wholesalers, and contractors throughout New York, New Jersey, and Eastern Pennsylvania.

                  We Would Love to See Your Projects!

                  Do you have a project...

                  PRINCETON UNIVERSITY CBE BUILDING

                  Princeton University Chemical and Biological Engineering Building

                  Precision HVAC Flow Control for Advanced Research Environments

                  Location Princeton, New Jersey
                  Completion Date 2025
                  Sales Representative Wales Darby

                  Project Description

                  At the forefront of research and education, Princeton University’s Chemical and Biological Engineering Building represents more than a century of scientific innovation. The facility supports cutting-edge research while providing an advanced learning environment for students and faculty.

                  With state-of-the-art laboratories and research facilities, the building requires a sophisticated HVAC system capable of maintaining precise climate control across multiple zones while supporting the comfort of occupants.

                  To meet these requirements, Princeton’s facilities team selected Griswold Controls’ CPP-IRIS Pre-Assembled Coil Hookups with Isolator R Valves.

                  The coil piping packages were installed on radiant panels throughout the building, delivering consistent water flow necessary to maintain optimal temperatures across different spaces. This setup allows the HVAC system to provide both efficiency and comfort within one of Princeton’s most advanced research environments.

                  Challenges and Solutions

                  • Maintaining Consistent Temperature in Sensitive Research Spaces
                    Research laboratories require stable and precise temperature control to ensure experiments are conducted in optimal conditions. With a wide variety of lab spaces and classrooms, the HVAC system needed to maintain reliable climate control across multiple zones.
                  • Energy Efficiency in a High-Demand Environment
                    Radiant panels throughout the facility require carefully controlled water flow. Without proper regulation, energy could be wasted and temperature fluctuations could impact both research conditions and occupant comfort.

                  Griswold Controls’ CPP-IRIS Coil Hookups provided a streamlined solution by delivering consistent water flow through the radiant panels. The Isolator R Valves incorporate automatic flow-limiting technology, allowing the HVAC system to maintain stable temperatures with minimal manual adjustment.

                  This configuration ensures each room receives the appropriate water flow required for optimal comfort and performance while minimizing energy waste.

                  Benefits and Outcomes

                  • Precise Climate Control
                    CPP-IRIS Coil Hookups provide accurate flow control, enabling the facility to maintain stable temperatures across laboratory and shared spaces.
                  • Improved Energy Efficiency
                    Automatic flow-limiting in the Isolator R Valves ensures each zone receives only the water flow required, reducing unnecessary energy consumption.
                  • Reliable System Performance
                    Griswold Controls products are engineered for durability and minimal maintenance, helping facility staff maintain consistent HVAC performance.

                  Products Used

                  CPP-IRIS Pre-Assembled Coil Hookups

                  CPP-IRIS Coil Hookups provide a compact and efficient solution that simplifies installation while delivering precise water flow regulation. Ideal for radiant panel systems, they support consistent climate control in sensitive environments such as research laboratories.

                  Isolator R Valves

                  Isolator R Valves feature automatic flow-limiting technology that maintains steady water flow even when system pressures fluctuate. Their durable design supports reliable HVAC performance and long-term energy efficiency.

                  Have a question about this or another Featured Project? Fill out the form...

                  ANAZAO HEALTH

                  Anazao Health Facility Expansion – Tampa, Florida

                  Precision HVAC Flow Control for Pharmaceutical Clean Rooms and Labs

                  Location Tampa, Florida
                  Completion Date Late 2024
                  Sales Representative Florida Hydronics

                  Our thoughts are with the resilient people of Tampa as they recover from the effects of Hurricane Milton. Griswold Controls has many close relationships in Central Florida and wishes them well as they repair from such devastating events.

                  Photo from Anazoa Health

                  Project Description

                  Anazao Health, a leading compound pharmacy and healthcare solutions provider in Tampa, Florida, recently expanded its manufacturing and warehouse facilities to meet growing industry demands.

                  The project focused on enhancing the HVAC systems within Anazao Health’s clean rooms and laboratory areas. Stringent air quality and climate control requirements were essential to maintaining contaminant-free conditions and regulatory compliance.

                  Florida Hydronics, a trusted HVAC distributor, supplied Griswold Controls’ equipment for this critical project. The selected products—QuickSet Packages and Large Flanged QuickSet Manual Valves—were ideal for controlling the cooling system water flow for the facility’s air handling units (AHUs).

                  These high-quality components allowed Anazao Health to create a finely tuned HVAC environment necessary for sensitive manufacturing and warehousing processes.

                  Challenges and Solutions

                  Anazao Health’s facility expansion presented a unique set of challenges in ensuring precise climate control in its clean rooms and laboratory areas. Compound pharmacies must maintain a stable and controlled environment to minimize contamination risks and ensure product quality.

                  • Maintaining Precise Conditions in Clean Rooms
                    Clean rooms require exact temperature and humidity control. Steady, reliable water flow to the AHUs ensures the air circulated within the spaces meets strict environmental standards.
                  • Continuous Operation Without Disruption
                    Any interruption or inconsistency in water flow could compromise temperature control, leading to contamination risks and operational delays.

                  Griswold Controls’ QuickSet Packages regulate water flow with exceptional accuracy, while the Large Flanged QuickSet Manual Valves allow fine-tuned control over flow rates, ensuring optimal cooling and environmental stability.

                  Benefits and Outcomes

                  • Precise Temperature and Humidity Control
                    QuickSet Packages and manual valves enable highly regulated conditions required for pharmaceutical production, minimizing contamination risks.
                  • Increased System Reliability
                    High-quality QuickSet valves function reliably under continuous use, ensuring critical manufacturing and storage areas remain operational with minimal maintenance.
                  • Enhanced Productivity
                    Consistent environmental conditions allow Anazao Health to streamline production processes and maintain product integrity.

                  Products Used

                  QuickSet Packages

                  QuickSet Packages provide adjustable water flow capabilities ideal for precise temperature and humidity regulation. Designed to work seamlessly with AHUs, they ensure controlled water distribution to support the cooling system.

                  Large Flanged QuickSet Manual Valves

                  These valves allow fine-tuned adjustments of water flow to match the specific cooling requirements of the facility, providing reliable control for complex HVAC environments.

                  Have a question about this or another Featured Project? Fill out the form below and someone from Griswold...

                  UT Southwestern Medical Center

                  UT Southwestern Medical Center – Dallas, TX

                  Transforming behavioral health care through innovative HVAC solutions with Griswold Controls Coil Piping Packages and Automatic Flow Limiting IR Valves.

                  Location: Dallas, Texas
                  Completion Date: 2023
                  Sales Rep: Texas Air Systems
                  Griswold Controls Products Used: Coil Piping Packages including Automatic Flow Limiting IR Valve

                  Photo from UT Southwestern

                  Project Description

                  The UT Southwestern has undertaken a transformative endeavor with the construction of its cutting-edge medical center. Set to emerge as a cornerstone of mental health care, this facility is poised to offer compassionate and comprehensive services to patients. The facility's design prioritizes the unique needs of behavioral health care, crafting an environment that is both nurturing and secure for patients and staff alike.

                  This project set out with a goal: excellence in patient care and exemplifying how strategic integration of technology can elevate the health and well-being of patients and staff. As the facility finished in 2023, it now stands poised to serve as a model for future healthcare construction endeavors, offering a beacon of hope and healing for the community it serves.

                  Challenges and Solutions

                  Designing an HVAC system for a healthcare facility, particularly one dedicated to behavioral health, presents a distinctive set of challenges. The system must not only ensure comfort but also adhere to stringent health and safety standards. Drawing on their expertise, Texas Air Systems recommended Griswold Controls Coil Piping Packages and Automatic Flow Limiting IR Valves for their reliability and performance in healthcare applications. These products were specifically selected for their ability to deliver precise temperature control and maintain air quality, both critical considerations in healthcare environments where patient well-being is very important.

                  Benefits and Outcomes

                  The use of Griswold Controls' products yielded a highly efficient and dependable HVAC system. The Automatic Flow Limiting IR Valves upheld consistent comfort levels throughout the facility, essential for the welfare of patients and staff. With the new and improved HVAC system in place, the staff now enjoys more comfort alongside improved energy efficiency, translating to reduced operational costs and a greener environmental footprint.

                  This project establishes a new benchmark for healthcare facilities across the industry.

                  Products Used

                  Griswold Controls Coil Piping Packages were designed to simplify installation processes while ensuring system integrity. These packages come equipped with all necessary components for a complete coil connection, streamlining on-site assembly. This project also utilized Automatic Flow Limiting IR Valves, instrumental in maintaining HVAC system balance. These valves employ stainless steel flow-limiting cartridges to dynamically absorb pressure fluctuations, regulating flow within a narrow +/- 5% range.

                  Featured Projects Have a question about this or another Featured Project? Fill out the form below and someone from Griswold Controls will get back to you shortly.


                    Please prove you are human by selecting the house.

                    About Texas Air Systems

                    Texas Air Systems provides specialized hydronic solutions for healthcare facilities, ensuring HVAC systems meet strict safety, comfort, and reliability standards.

                    We Would Love to See Your Projects!

                    Do...

                    West Henderson Hospital Tower

                    West Henderson Hospital

                    Advanced HVAC coil piping solutions supporting critical healthcare infrastructure in Las Vegas, Nevada.

                    Location Las Vegas, Nevada
                    Date of Completion Late 2024
                    Representative Norman S. Wright
                    Griswold Controls Products Used CPP-2IRIS Coil Piping Packages

                    Photos from Vegas Business Digest

                    Description

                    Is there a more popular saying than “What happens in Vegas, stays in Vegas?” For those who have been to Las Vegas, they know how popular it is. The people at West Henderson Hospital are trying to make sure that you leave Vegas in good enough shape to keep the tales a secret.

                    At $9,625,000 per acre, this new hospital is set to leave hardly any medical need unmet. A 37-bay emergency department, heart and hybrid suites, and interventional radiology will all be supported by imaging, pharmacy, and laboratory departments.

                    All of these expertly assembled and staffed medical suites need precision in every part of their environment. Hospital HVAC systems work harder than HVAC systems in most buildings because they run 24/7/365. Furthermore, they contribute to the health of patients in the room by improving air quality and mitigating airborne disease transmission.

                    Project Description

                    In this project, Griswold Controls installed approximately 500 CPP-2IRIS packages with customer supplied ATCs. To find in-depth details on our hospital applications and why we have been trusted and installed in thousands of hospitals around the country, click here.

                    All of the Coil Piping Packages in this project included hoses, automatic flow limiting Isolator R valves, strainers, and unions.

                    At $9,625,000 per acre, this project appears to be on the expensive side, but it could have included a higher HVAC bill if not for our CPPs. Coil Piping Packages are pre-assembled piping systems that save time and reduce cost.

                    We offer fully assembled coil hook ups that can be readily connected to your system with as little as four connections. No more field assembled components — we do it all for you.

                    Griswold Controls offers over 900 standard configurations that can be shipped in as little as 48 hours from order receipt from your Griswold Controls Representative.

                    Griswold Coil Piping Packages (CPPs) may include flow control valves, isolators, ball valves, unions, Y-strainers, temperature control valves, stainless steel hoses, insulated hoses, air vents, pressure/temperature test valves, and drain valves. Find your perfect CPP or learn more here.

                    We’d be remiss to not mention casinos when talking about Las Vegas. Let us let you in on a trade secret of casinos: the reason why it is so easy to get lost in them is because the air has been conditioned to perfection. Our valves have been a central part of this for decades.

                    Products Used

                    CPP-2IRIS Coil Piping Packages

                    Griswold Controls Coil Piping Packages (CPPs) are pre-assembled piping solutions designed to simplify HVAC installation while ensuring reliable performance.

                    These packages integrate multiple HVAC components into a single factory-assembled unit, reducing installation time, minimizing field labor, and improving system consistency across the building.

                    Each package may include automatic flow limiting valves, isolators, ball valves, unions, Y-strainers, stainless steel hoses, air vents, and pressure/temperature test valves — all pre-configured and ready to install with minimal system connections.

                    Featured Projects Have a question about this or another Featured Project? Fill out the form below and someone from Griswold Controls will get back to you shortly.


                      Please prove you are human by selecting the plane.

                      About Norman S. Wright

                      For more than 100 years, Norman S. Wright has built a reputation for selecting and supporting high-performing product lines while relentlessly delivering customer satisfaction. Today, their organization is known worldwide for expertise in streamlining and optimizing complex HVAC projects at every stage.

                      Their team of experts collaborates across disciplines to view projects from all angles and craft the most effective solutions in the industry. The core values of Sustainability, Innovation, and Excellence drive their actions every day and form the foundation of their business.

                      We Would Love to See Your Projects!

                      Do you have a project that showcases Griswold Controls products?

                      We would love to feature you! Submit a contact form with project details so we can feature the project on our website.

                      Covenant Health West Tower

                      Covenant Health West Tower

                      Advanced HVAC balancing solutions ensuring comfort and efficiency in a modern healthcare tower in Lubbock, Texas.

                      Location Lubbock, Texas
                      Date of Completion 2021
                      Representative Texas AirSystems
                      Griswold Controls Products Used Manual CPPS – 2QIS

                      Photo from MyPlainview

                      Description

                      The Covenant Health West Tower is a 6-story, 200,000-square-foot facility in Lubbock, Texas, replacing the original building on the same site. This $140 million renovation added 89 beds with capacity for an additional 60, along with 200 new parking spaces and state-of-the-art inpatient facilities.

                      Designed for patient and staff comfort, the building features approximately 300 manual CPPS – 2QIS coil piping packages to ensure balanced HVAC performance throughout all zones.

                      Feedback from patients and staff was incorporated into the design, including adjustments to the parking garage to improve accessibility and overall experience.

                      Project Description

                      To achieve consistent comfort in this modern healthcare facility, the Covenant Health West Tower installed ~300 manual CPP-2QIS coil piping packages. These packages include venturi for flow measurement and setting, two pressure/temperature test valves, and a memory stop.

                      End piece connection options are available for 2-way and 3-way packages with Isolator Union and manual air vent. The Isolator S features a strainer, pressure/temperature test valve, drain valve, and ball valve, providing reliable protection and control for the HVAC system.

                      For more detailed information, read here.

                      Products Used

                      Manual CPPS – 2QIS

                      Griswold Controls CPPS – 2QIS packages provide precise manual balancing for large-scale HVAC systems. They allow accurate flow measurement and setting, ensuring patient and staff comfort across all zones of the facility.

                      Designed with user-friendly features like memory stops, venturis, and test valves, these packages reduce field labor while maintaining consistent system performance.

                      Featured Projects Have a question about this or another Featured Project?

                      Fill out the form below and someone from Griswold Controls will get back to you shortly.


                        Please prove you are human by selecting the car.

                        About Texas AirSystems

                        Texas AirSystems is the largest independent HVAC representative in Texas. With over 40 years of experience, they specialize in commercial HVAC solutions, offering innovative and collaborative approaches to support clients and projects.

                        Their mission, “the unwavering pursuit of BUILDING PARTNERSHIPS®,” ensures that each project receives the expertise, high-quality products, and service required to maintain reliable and efficient HVAC systems.

                        We Would Love to See Your Projects!

                        Do you have a project that showcases Griswold Controls products?

                        We would love to feature you! Submit a contact form with project details so we can feature the project on our website.

                        City of Hope Cancer Center – Irvine

                        City of Hope Cancer Center – Irvine

                        Patient-focused, LEED-certified cancer care and research hub in Orange County.

                        Location Irvine, California
                        Date of Completion 2021
                        Representative J.D. Sales
                        Griswold Controls Products Used QuickSet Manual Balance Valves - Brass and Steel Flange versions, Flanged Strainers, Isolator S, and complementary components
                        City of Hope Hospital

                        Facility Description

                        The City of Hope Cancer Center will be a 190,000 square-foot, LEED-certified cancer center of the future in Irvine, California, and one of our personal favorite projects since it is a few miles from our factory. It is to be located on 11 acres of the master-planned FivePoint Gateway community. The center will become a regional cancer care hub in the heart of Irvine for years to come.

                        This patient-focused location offers highly specialized cancer care, clinical research with access to Phase 1-3 clinical trials, precision medicine, and early detection and prevention programs. It will be the home of leading cancer researchers and care professionals and be a center for innovation and compassionate care.

                        Every step of the way, they have been working with patients, caregivers, and the community. In fact, they began planning for the building by inviting hundreds of people to a design session. They asked participants to walk through mock-ups and provide feedback on everything from patient rooms to corridors to meeting areas. The result will be a facility that is tailor-made to Orange County.

                        Project Description

                        However, not only the design work is tailor-made. The HVAC is as well and it needs to be for such an important building. This project is using brass and steel flanged QuickSet valves along with some complimentary equipment in the form of Isolator S and Flanged strainers. For those that don’t know a lot about QuickSet, here is why our clients choose it.

                        When a Contractor’s Manual Balance Valve readings are anything less than ±1% accurate, the engineer’s system design is costing someone money. In many installations, contractors may sacrifice accuracy for space considerations since traditional Manual Balance Valves require straight pipe length upstream and downstream. Straight pipe length is not required with Griswold’s Disturbed Flow Measurement used exclusively in the QuickSet Manual Balance Valves. When the engineer specifies a QuickSet, they can count on the balancing contractor getting a ±1% test accuracy no matter what space the contractor has to install the valve. The engineer’s QuickSet specification guarantees the energy efficiency and lower operating cost desired by the owner (Read more here).

                        We are so excited to be working with the City of Hope and we can't wait to see the City of Hope Cancer Center help an immeasurable amount of lives!

                        Featured Projects Have a question about this or another Featured Project?

                        Fill out the form below and someone from Griswold Controls will get back to you shortly.


                          Please prove you are human by selecting the star.

                          About J.D. Sales

                          J. D. Sales Company has been a key partner with Griswold Controls in Southern California since 1982. Throughout the many years, this passionate team exemplifies professionalism and dedication to upholding Griswold’s highest standards of product and service to the communities we serve.

                          To learn more about J. D. Sales, check out their website – www.jdsalesco.com.

                          We Would Love to See Your Projects!

                          Do you have a project that showcases Griswold Controls products?
                          We would love to feature you! Submit a contact form with project details so we can feature the project on our website.

                          MFSH NICU – Postpartum

                          MFSH NICU – Postpartum

                          Reliable HVAC performance supporting newborn care and family-centered recovery spaces.

                          Location Williamsville, New York
                          Date of Completion Spring 2019
                          Representative F.P. Langley Co
                          Griswold Controls Products Used CPP-PICV with customer supplied Actuators
                          MFSH Hospital MFSH Hospital Desk

                          Facility Description

                          MFSH

                          MFSH (Millard Fillmore Suburban Hospital) NICU is a 265-bed community hospital, 10-bed and level II Neonatal Intensive Care Unit. Generally speaking, they deliver over 2500 babies annually and support their health care needs. With the addition of adding 4 North to MFSH's footprint, this will allow for additional resources to care for the infants.

                          Moreover, the addition of a neonatal intensive care unit (NICU) adjacent to the original structure of Millard Fillmore Suburban Hospital supports the hospital's current labor/delivery and mother/baby units and enables the hospital to provide comprehensive newborn care for medically unstable or critically ill newborns.

                          Millard Fillmore Suburban Hospital NICU projects consist of brand new eight-bed inpatient unit (4 North), it offers spacious flex units, outfitted to accommodate new moms and infants. Each private room offers patients hotel-like amenities that provide both privacy and comfort including floor to ceiling windows, a bathroom with shower, refrigerator and a sleeper sofa for family members staying overnight. The open layout also features a centralized nurse’s station with a nursery, a kitchen area, an expanded suite and a large family room for visitors.

                          This State-of-the-art facility used Griswold Controls CPP-PICV valves with customer supplied ACTs.

                          Products Used

                          CPP-PICV Coil Piping Packages

                          Griswold Controls CPP-PICV coil piping packages integrate pressure independent control valves with pre-engineered piping assemblies to provide accurate flow control and simplified installation. These packages are designed for high-performance HVAC systems where maintaining consistent flow regardless of pressure fluctuations is critical.

                          • Healthcare and hospital HVAC applications
                          • Fan coil units and terminal equipment requiring pressure independent flow control
                          • Buildings requiring energy-efficient hydronic balancing
                          Featured Projects Have a question about this or another Featured Project?

                          Fill out the form below and someone from Griswold Controls will get back to you shortly.


                            Please prove you are human by selecting the tree.

                            About F.P. Langley Co

                            Frank P. Langley Company is a manufacturers’ representative specializing in fluid handling products. They serve the HVAC, plumbing, industrial, and sprinkler markets with product lines representing premier manufacturers in the industry for nearly 80 years.

                            The Frank P. Langley Company was founded in Buffalo, NY by Frank P. Langley Sr. in 1938. Frank P. Langley Jr. joined the company in 1955 and helped establish it as the premier fluid handling representative in Upstate New York and Northern Pennsylvania.

                            We Would Love to See Your Projects!

                            Do you have a project that showcases Griswold Controls products?

                            We would love to feature you! Submit a contact form with project details so we can feature the project on our website.

                            The OU Medical Center Adult Patient Tower

                            OU Medical Center Adult Patient Tower

                            State-of-the-art tower expansion enhancing patient care, capacity, and medical technology.

                            Location Oklahoma City, Oklahoma
                            Date of Completion Fall 2019
                            Representative Reintjes & Hiter
                            Griswold Controls Products Used CPP-2IRIS Packages with customer supplied ATCs
                            OU Medical Center Hero OU Medical Center OU Medical Center OU Medical Center Interior

                            Facility Description

                            The OU Medical Center Adult Patient Tower is a state-of-the-art medical tower at OU Medical Center to meet the increasing demand for the highest level of care. The sparkling façade will reflect OU Medicine’s commitment to leading health care. The new facility boasts ample space for 144 additional inpatients and their families. Additionally, it will include modern amenities, cutting-edge medical technology, and offer resources to ensure a satisfying patient experience. The project is broken into 3 phases, first being the enabling phase, second being the construction of the new OU Medical Center patient tower, and last being the renovation of the existing adult patient bed tower.

                            Phase 1: Enabling

                            In March 2018, the enabling phase was complete. All work is related to maintaining service to the gamma knife procedure room and the existing PET/CT procedure room during construction of the new OU Medical Center patient tower. This project consists of 8,834 square-feet in demolition and 3,384 square-feet in renovation to prepare for the development of the new OU Medical Center patient tower. As a result, the sequencing of this work was strategic to minimize impacts to the existing operations.

                            Phase 2: New Construction

                            Secondly, in the new tower build-out, the foundation work consisted of reconfiguring the current emergency department parking lot to allow for the construction of the new OU Medical Center patient tower. The tower includes new foundation expansion work, and earth retention, concluding in 69,582 square feet of new foundation. The additional core and shell work will consist of a high-rise height of a 147-foot tall concrete building and an overall 401,900 square feet of interior build-out.

                            Phase 3: Renovation

                            Lastly, the construction of the OU Medical Center patient tower, the interior renovation of the existing patient bed tower will begin, which will consist of 96,900 square feet of a major renovation. The construction of the new patient tower will open in October 2020. In conclusion, the new OU Medical Center Patient Tower Hospital Expansion will be 456,000-square feet of additional space, 152-feet tall, and eight new floors with room to grow. It will offer 144 beds, 32 new operating rooms, intensive care unit, medical/surgical floor, a stepdown unit, and large patient rooms with extra space for the family. In the construction of OU Medical Center, Griswold Controls provided CPP-2IRIS Packages with customer supplied ATCs.

                            Products Used

                            CPP-2IRIS Packages

                            Griswold Controls CPP-2IRIS packages include pre-engineered coil piping assemblies with control valves and housings, designed to provide accurate flow control, reliability, and simplified installation for high-performance HVAC systems.

                            • High-rise hospital HVAC applications
                            • Fan coil units and terminal units with customer supplied actuators
                            • Durable, serviceable brass construction for demanding environments
                            Featured Projects Have a question about this or another Featured Project?

                            Fill out the form below and someone from Griswold Controls will get back to you shortly.


                              Please prove you are human by selecting the star.

                              About Reintjes & Hiter

                              Reintjes & Hiter is a family-owned and operated business. Thus, we provide products and services designed to help our customers be successful, we fulfill the changing needs of the marketplace. Headquartered in Kansas City, KS. with a 25,000 sq. ft. warehouse and sales office, we have an additional sales office in Wichita, KS. Of course, Reintjes & Hiter supplies products that deliver high quality at optimum cost. Furthermore, we meet our customers' expectations by complying with or exceeding applicable standards and specifications. We emphasize fitness for use, performance, safety, and reliability. Without a doubt, an important consideration is the calculation and evaluation of costs associated with all quality elements and objectives. Above all, our extensive inventory and in-house fabricating capabilities provide timely and efficient service for all your needs. Utilizing our expertise in engineered products allows us to provide solutions to our customers' application challenges.

                              We Would Love to See Your Projects!

                              Do you have a project that showcases Griswold Controls products?

                              We would love to feature you! Submit a contact form with project details so we can feature the project on our website.

                              The University of Texas Southwestern Medical Center

                              Location: Dallas, TX Date of Completion: Winter 2019 Representative: Neal and Associates Griswold Controls Products Used: CPP-2IRIS Packages with hoses installed and customer supplied ATCs Description: The University of...

                              Mason General Hospital MOB Medical Office Building

                              Mason General Hospital MOB Medical Office Building

                              Expanding access to quality healthcare with a modern, patient-focused medical office building.

                              Location Shelton, WA
                              Date of Completion Summer 2019
                              Representative Proctor Sales
                              Griswold Controls Products Used CPP-2IRIS Packages with hoses installed and customer supplied ATCs
                              Mason General Hospital

                              Facility Description

                              At the Mason General Hospital, a two-story 60,000 square foot medical office building will consolidate services from local practices. This expansion will increase exam rooms from 71 to 104. The MGH Hoodsport Family Clinic will remain in its current location. Griswold Controls was excited to be a part of this project that provides easier access to health care services for patients and their families. Griswold Coil Piping Packages used on this project are pre-assembled piping systems that save time and reduce cost.

                              The initial phase of the project began this summer with the relocation of the Health Information Management Department, Human Resources Department, MGH Foundation/Development Offices and the Volunteer Services Department. Consequently, these series of office and department moves accommodated the staging of construction. The next phase of the Medical Office Building construction will include the clearing of the north parking lot area, demolition of the Human Resources building, relocation of the South Main Entrance driveway, completion of the north parking lot, the completion of the medical office building throughout 2019. As a result, these efforts will culminate in a grand opening after the project is completed.

                              A Word on the Project

                              Eric Moll, chief executive officer, said, “Medical services have changed dramatically in the past few years and innovative processes are making patient care better every day. Furthermore, it is our dream that this new building will inspire and empower the members of our community to achieve their best health.”

                              Featured Projects
                              Have a question about this or another Featured Project?

                              Fill out the form below and someone from Griswold Controls will get back to you shortly.


                                Please prove you are human by selecting the tree.

                                We Would Love to See Your Projects!

                                Do you have a project that showcases Griswold Controls products?

                                We would love to feature you! Submit a contact form with project details so we can feature the project on our website.

                                The Van Ness Campus at Cathedral Hill Hospital

                                Location: San Francisco, California Date of Completion: Unknown Representative: California Hydronics Corporation (CHC) Griswold Controls Products Used: Lead Free K-Valves Description:  Located in San Francisco, The Van Ness...

                                Mount Carmel East, New Ned Tower

                                Location: Columbus, Ohio Date of Completion: Unknown Representative: Kevin McGovern Associates Griswold Controls Products Used: 3/4" – 1-1/2", 2QIS & 3QIS Sweat CPPs Description: Mount Carmel Health is...

                                Delray Medical Center

                                Location: Delray Beach, Florida Date of Completion: Early 2017 Representative: Diversified Fluid Controls Griswold Controls Products Used: 1/2" – 1-1/2" L, 2IRIS Female cpps w/SS Ball&Stem, Exts &...

                                Tukh Cambridge North Tower

                                Location: Kansas City, Kansas Date of Completion: 2018 Representative: Diversified Fluid Controls Griswold Controls Products Used: 1/2" – 1-1/2", 2QIS & 3QIS Sweat CPPs Description: The University of...

                                 

                                Hospitality:

                                400 Central Residency

                                400 Central Residences

                                Delivering efficient HVAC performance for a luxury 46-story residential tower in St. Petersburg, Florida using Griswold Controls Hose Kits and Automatic Flow Limiting K Valves.

                                Location St. Petersburg, Florida

                                Project Description

                                In the sun-kissed landscape of St. Petersburg, Florida, the soaring silhouette of the 46-story 400 Central Residences stands as a new pinnacle of luxury living. With panoramic views stretching from Tampa Bay to the Gulf of Mexico, the development features more than 300 designer homes that highlight modern city living, convenience, and efficiency.

                                Beyond the private residences, the project introduces a vibrant ground-level destination with retail and dining, a resort-style pool, an innovative fitness center, and a sky lounge observatory. Designed by internationally recognized architects at Arquitectonica and developed by Vincent Celano, the building was envisioned to become a defining landmark on Florida’s Gulf Coast skyline.

                                Challenges and Solutions

                                High-rise construction introduces complex HVAC challenges, including fluctuating loads, elevated system pressures, and limited mechanical space. Griswold Controls' Hose Kits simplified installation while reducing the risk of leaks and providing vibration isolation, noise reduction, and compensation for thermal expansion.

                                Complementing the system, Automatic Flow Limiting K Valves deliver self-balancing performance by maintaining a constant flow rate even when system pressure fluctuates. This eliminated the need for manual balancing while saving time and labor during installation. The valves ensured precise flow control and enhanced the overall efficiency of the building’s HVAC infrastructure.

                                Benefits and Outcomes

                                The integration of Griswold Controls’ Hose Kits and Automatic Flow Limiting K Valves resulted in a reliable, cost-effective HVAC system that exceeded performance expectations. Residents benefit from improved comfort and consistent temperature control, while the building gains long-term energy efficiency and dependable operation.

                                Products Used

                                To create an HVAC system that balances comfort, reliability, and energy efficiency, the project incorporated Griswold Controls' Hose Kits and Automatic Flow Limiting K Valves. Represented by trusted partner Jascko Corp., these products played a key role in delivering high-performance heating and cooling throughout the tower.

                                Featured Projects Have a question about this or another Featured Project? Fill out the form below and someone from Griswold Controls will get back to you shortly.


                                  Please prove you are human by selecting the key.

                                  About Jascko Corp.

                                  Jascko Corp., a stalwart in HVAC representation since 2005, provided invaluable support throughout the project. Their technical expertise, product selection guidance, and unwavering customer service underscore their commitment to excellence. Clients benefit from their comprehensive knowledge of industry standards and system solutions.

                                  Jascko Corp. assists owners and consulting engineers with the design of HVAC systems for commercial, institutional, and industrial applications, while also supporting contractors with project coordination from bid day through completion and beyond.

                                  Proudly representing Griswold Controls, Jascko Corp. played a key role in bringing efficiency and innovation to the forefront of the HVAC market, marking another successful collaboration in Southeast Florida.

                                  We Would Love to See Your Projects!

                                  Do you have...

                                  Peppermill Resort Tower

                                  Peppermill Resort Spa Casino – HVAC Renovation

                                  Reno, Nevada | Completed Late 2023

                                  Location: Reno, Nevada
                                  Date of Completion: Late 2023

                                  Photos from Peppermill Resort Reno

                                  Project Description

                                  Nestled in the heart of Reno, the Peppermill Resort Spa Casino stands as a symbol of opulence, comfort, and entertainment. Offering 1,621 guest rooms—including the 600-room all-suite Tuscany Tower—this resort delivers an unmatched guest experience across its spa, casino, restaurants, pools, fitness center, and bars.

                                  Currently, the resort is undergoing a significant renovation of the Peppermill Tower rooms, enhancing guest comfort with modern amenities and contemporary designs.

                                  Griswold Controls proudly contributed to this project by providing its industry-leading Automizer combination control valves and coil piping packages for the HVAC system. These solutions ensure optimal heating and cooling performance, precise temperature control, and maximum comfort for guests. Additionally, the products streamline installation, reduce labor and energy costs, and simplify long-term maintenance.

                                  With over 60 years of experience in HVAC valve manufacturing and flow control solutions, Griswold Controls brings precision, reliability, and innovation to every installation.

                                  Project Implementation

                                  The renovation focused on delivering a high-performance HVAC system capable of maintaining comfort across all rooms, 24/7. Griswold Controls’ Automizer valves integrate the functions of an actuated ball valve and a flow limiting valve, providing precise flow regulation for each coil in the system.

                                  Signals from the building automation system (BAS) control the Automizer valves, allowing consistent temperature and comfort levels regardless of pressure fluctuations. This approach ensures every guest experiences the same premium comfort, while optimizing energy use and system efficiency.

                                  Partnering for Excellence

                                  Griswold Controls’ contributions allowed the Peppermill Resort Spa Casino to elevate the guest experience while reducing installation complexity and operational costs. By combining innovative HVAC solutions with extensive industry expertise, the project reinforces the resort’s status as a premier destination for luxury, comfort, and entertainment in Reno, Nevada.

                                  Have a question about this or another Featured Project? Fill out...

                                  Aurum Golden Apartments

                                  Aurum Golden Apartments

                                  Innovative HVAC flow control solutions supporting modern, high-amenity apartment living in Golden, Colorado.

                                  Location Golden, Colorado
                                  Date of Completion 2022
                                  Griswold Controls Products Used Streamline Control

                                  Project Description

                                  Golden, Colorado is home to the world’s largest single-site brewery, the iconic Red Rocks Amphitheater, and now, the Aurum Golden Apartments – a modern apartment community designed to “Live Exceptionally™.” The development emphasizes collective living with high-quality amenities, a sense of community, and innovative housing solutions that blend work, life, and recreation.

                                  For a project with such high standards, the HVAC system could not compromise resident comfort. Griswold Controls’ Streamline Control valves were selected for their compact design, durability, and precise flow control.

                                  Installed with internal actuators and automatic flow-limiting cartridges, the Streamline valves save installation time and reduce space requirements. Lead-free construction allows safe use on domestic hot water coils, while the ceramic disc technology ensures reliable modulation and zero leak-by, even under high pressures.

                                  According to LONG Building Technologies, “350 Griswold no-lead brass Streamline Control valves with automatic flow limiting cartridges were installed on fan coil units using domestic hot water coils. The configuration reduced installation time and simplified balancing, impressing the contractor with ease of installation and performance.”

                                  The result is an HVAC system capable of delivering exceptional comfort and efficiency for residents throughout the community.

                                  For more information, click here.

                                  Products Used

                                  Griswold Streamline Control Valves

                                  Streamline Control

                                  Griswold Controls Streamline Control valves are compact, lead-free actuated valves with internal automatic flow-limiting cartridges. Designed for fan coil units and domestic hot water HVAC applications, they provide precise flow modulation using durable ceramic discs. The design simplifies installation, reduces space requirements, and ensures reliable performance throughout the building.

                                  Gold standard this, Denver Broncos that, let’s get down to brass tacks. The valves are Lead-Free for potable water – domestic systems even though they are installed on the HVAC system. Compact design and very simple installation – the actuator can be wired remotely which saves space. The Streamline valve is the first actuated valve in the industry to use a ceramic disc to modulate the flow. Ceramic discs have been used for decades in plumbing fixtures because they are durable, very low torque, and shut off against high pressures with zero leak-by.

                                  Featured Projects Have a question about this or another Featured Project? Fill out the form below and someone from Griswold Controls will get back to you shortly.


                                    Please prove you are human by selecting the star.

                                    We reached out to our rep and they had this to say about the project:

                                    “LONG sold 350 Qty. Griswold no-lead brass Streamline Control valves with automatic flow limiting cartridges for the Aurum Gateway Apartment project. These were used in an application with fan coil units that use domestic hot water coils to heat the space. The Streamline valves are the perfect solution for these applications because they are smaller than conventional control valves. The Streamline valves are smaller because the actuator is internal to the valve. Also, this Streamline valve configuration reduces installation time because the balance cartridge is internal to the valve also, giving the contractor less fittings that they must install. The contractor was impressed with the ease of installation and the performance of the Griswold Streamline Control Valves.”
                                    — Project Representative

                                    About LONG Building Technologies, Inc.

                                    LONG Building Technologies, Inc. is one of the largest building integrators in the Western U.S., providing expertise in Building Automation, HVAC Equipment, Mechanical Service, Security Solutions, and Parts. With hundreds of employees across eight states — Alaska, Colorado, Montana, Nevada, Oregon, Utah, Washington, and Wyoming — they are best defined by the way they treat their customers: “the heart of our business.”

                                    Guided by their core values: Company, Customer, Co-Worker, Safety & Community, LONG aims to gain customer trust, attract and retain talented employees, and deliver superior service. Their mission is to provide innovative building solutions that positively impact every person their business touches, creating long-term value and exceptional experiences for clients.

                                    We Would Love to See Your Projects!

                                    Do you have a project...

                                    Parcel 12

                                    Parcel 12 Development – Boston

                                    Balanced hydronic HVAC systems supporting mixed-use office, retail, and hospitality spaces in Boston, Massachusetts.

                                    Location Boston, Massachusetts
                                    Date of Completion TBD

                                    Description

                                    Arguably the most legendary stage on which the great American spectacle has been played is the world-renowned Fenway Park. Even during the darkest times in America’s past, one thing that has always helped Americans get through those times was the beloved sport of baseball.

                                    Baseball, otherwise known as the great American spectacle, has been a huge part of Boston and American history. This is why connecting the historic Fenway neighborhood and replacing the barren Boylston Street area with storefront retail, a hotel, and world-class office space is such an important part of Boston’s plans.

                                    Improvements don’t stop there with Parcel 12. The experience for pedestrians, bicyclists, and motorists, as well as those using nearby public transit, have been taken into consideration via repairs to bus stops, adding bike lanes, and connecting two of Boston’s most walkable districts.

                                    Parcel 12 has been in the works for nearly five years and for good reason. They have a task that stands to revolutionize Boston, and with a project so important, they only trust the best.

                                    Project Description

                                    Enter the Balanced Hydronic System. Hydronic system balancing is an essential part of HVAC design. Without proper balancing, some coils in a system have too much flow and others don’t have enough, leaving the building unbalanced.

                                    An unbalanced system can lead to excessive complaints as occupants experience spaces that are too hot or too cold. While manual valves may have lower initial costs, accounting for labor to balance them increases total cost. Automatic valves, on the other hand, maintain the design flow even as system pressures fluctuate.

                                    Using Griswold Controls Automatic Flow Limiting Valves ensures the building maintains the correct flow in all zones at all times, providing consistent comfort, improved efficiency, and reliable performance.

                                    Products Used

                                    Automatic Flow Limiting Valves – Grooved End and K Valves

                                    Griswold Controls Automatic Flow Limiting Valves are designed to maintain constant design flow regardless of system pressure variations. These valves are ideal for hydronic systems in mixed-use buildings, delivering accurate and reliable flow control across all zones.

                                    Available in grooved end sizes 4”-12” and K Valves, these products reduce labor for system balancing, enhance occupant comfort, and ensure the building operates efficiently throughout the year.

                                    Featured Projects Have a question about this or another Featured Project?

                                    Fill out the form below and someone from Griswold Controls will get back to you shortly.


                                      Please prove you are human by selecting the car.

                                      About Griswold Controls Products

                                      Griswold Controls has been providing high-quality automatic flow limiting valves for decades. Our products are engineered to maintain precise system flow, reduce labor for system balancing, and deliver reliable performance in commercial and mixed-use buildings.

                                      By using automatic flow limiting valves, building owners can ensure balanced, energy-efficient HVAC operation while reducing the potential for occupant comfort complaints.

                                      We Would Love to See Your Projects!

                                      Do you have a project that showcases Griswold Controls products?

                                      We would love to feature you! Submit a contact form with project details so we can feature the project on our website.

                                      Winthrop Center

                                      Winthrop Center

                                      Energy-efficient HVAC flow control supporting one of Boston’s most innovative and sustainable high-rise developments.

                                      Location Boston, Massachusetts
                                      Date of Completion July 2021
                                      Representative Equipment Direct Sales
                                      Griswold Controls Products Used Grooved End Valves 12" and 14"

                                      Photos from Fast Company

                                      Facility Description

                                      Massachusetts is home to world-class institutions and historic landmarks such as MIT, Fenway Park, and the site of the Boston Tea Party. Winthrop Center now joins that list as one of the city’s most impressive modern developments, standing as the 4th tallest building in Boston.

                                      Designed in collaboration with MIT professors, the building incorporates innovative sustainability strategies that significantly reduce both energy and water usage compared to buildings of similar size. The project places a strong emphasis on diversity, wellness, and equity while pushing the boundaries of high-performance building design.

                                      Winthrop Center is also set to become the world’s first Passive-House certified office building, demonstrating how cutting-edge engineering and thoughtful design can dramatically improve environmental performance while creating an exceptional space for occupants.

                                      Project Description

                                      With a project budget of approximately $1.3 billion, every aspect of Winthrop Center was designed to reflect modern aesthetics, functionality, and exceptional quality. The HVAC system needed to support this vision while delivering reliable performance and efficiency.

                                      The building features triple-glazed floor-to-floor curtain walls that are prefabricated to create a tight, custom fit, helping maintain comfortable interior conditions even during extreme weather.

                                      The ventilation system pulls fresh air into each floor while recovering energy from conditioned air leaving the building. This allows the offices to use approximately 65% less energy than the average building in Boston while providing 30–50% more fresh air for occupants.

                                      Products Used

                                      Grooved End Automatic Flow Limiting Valves

                                      The system utilizes 12” and 14” Grooved End Automatic Flow Limiting Valves. The stainless-steel flow limiting cartridge includes a spring-loaded cup that dynamically absorbs pressure fluctuations caused by changing heating and cooling loads.

                                      These pressure fluctuations occur within a defined pressure differential control range and do not alter the flow through the valve. As a result, the system maintains flow within ±5% of the engineered design flow rate.

                                      This consistent control helps ensure reliable HVAC system performance while supporting the building’s overall energy-efficiency goals.

                                      Featured Projects Have a question about this or another Featured Project?

                                      Fill out the form below and someone from Griswold Controls will get back to you shortly.


                                        Please prove you are human by selecting the truck.

                                        About Equipment Direct Sales, Inc.

                                        Equipment Direct Sales employs a diverse team of sales, engineering, and administrative professionals with over 150 years of combined experience.

                                        Their collective expertise allows them to serve customers quickly and accurately while providing innovative HVAC solutions tailored to each project.

                                        We Would Love to See Your Projects!

                                        Do you have a project that showcases Griswold Controls products?

                                        We would love to feature you! Submit a contact form with project details so we can feature the project on our website.

                                        Bentall Skyrise

                                        Bentall Skyrise

                                        Custom HVAC and coil piping solutions for a 33-story landmark building in Vancouver, British Columbia.

                                        Location Vancouver, British Columbia
                                        Date of Completion 2021
                                        Representative Riada Sales Inc.
                                        Griswold Controls Products Used Custom CPP-6IRIS Coil Piping Packages for installation on 6-way control valves

                                        Photos from Skyrise Vancouver

                                        Facility Description

                                        33 stories, 403ft (122.83m), and a terrace that would even make the 1% blush. The renderings alone are astonishing. The Bentall Skyrise will occupy 14th place for the tallest building in Vancouver.

                                        The HVAC system is designed to match the grand vision, featuring triple glazing for efficiency and noise reduction, and glass solar shading to maximize natural light while minimizing glare.

                                        Project Description

                                        Custom CPP-6IRIS Coil Piping Packages were required for the 6-way control valves. One 6-way valve can replace four 2-way valves while using fewer parts. Benefits include bubble-tight close-off, 270-degree control angle, automatic balancing to reduce underflow/overflow at coils, and pre-plumbed packages to save time, labor, and money.

                                        The intuitive design makes installation and operation easier, ensuring engineers, contractors, and owners all benefit from reduced labor and maintenance costs.

                                        You can find the Coil Piping Packages here.
                                        Featured Projects Have a question about this or another Featured Project?

                                        Fill out the form below and someone from Griswold Controls will get back to you shortly.


                                          Please prove you are human by selecting the tree.

                                          About Riada Sales Inc.

                                          Since 1995, Riada Sales Inc. has been assisting in selecting, specifying, and engineering the right products for commercial, institutional, and multi-family residential projects. They stand behind the products they supply and are proud of their association with the manufacturers they represent. Everyone at Riada strives to provide the best service possible to engineers, contractors, architects, and owners.

                                          We Would Love to See Your Projects!

                                          Do you have a project that showcases Griswold Controls products?
                                          We would love to feature you! Submit a contact form with project details so we can feature the project on our website.

                                          Monteleone Hotel Update, New Orleans

                                          Hotel Monteleone – New Orleans

                                          Griswold Controls helps preserve a historic French Quarter landmark through a phased HVAC retrofit using Automizer® coil piping packages.

                                          Project Overview

                                          Solution Automizer® Coil Piping Packages & Unimizer® Valves
                                          Application Hotel / Historic Landmark Renovation
                                          Mechanical Engineer Wink Engineering
                                          Representative Schully Strawn & Associates
                                          Facilities Engineer A.J. Mattern
                                          Phases Completed Phase 1: 2002 | Phase 2: 2004

                                          The Challenge

                                          Hotel Monteleone New Orleans

                                          Located in the heart of the French Quarter, the 15-story Beaux-Arts landmark Hotel Monteleone required a major HVAC retrofit while remaining fully operational. The property includes over 600 guest rooms and had to maintain comfort, aesthetics, and revenue during renovation.

                                          • Minimal Guest Disruption Rooms could only be taken offline in small groups. The hotel had to remain fully operational during renovation.
                                          • Historic Preservation Tight mechanical spaces required a compact, small-footprint solution.
                                          • System Compatibility The four-pipe fan coil configuration required a unified, single-source solution.
                                          • Phased Execution The retrofit needed to be efficient across multiple renovation phases.

                                          The Solution

                                          Working closely with Wink Engineering and the hotel’s facilities team, Griswold Controls recommended installing Automizer® combination control valve coil piping packages on the four-pipe fan coils.

                                          Key Advantages

                                          • Single Source for Coil Components Eliminates coordination issues and ensures system compatibility.
                                          • Multi-Function Valve Combines actuated temperature control and flow limiting in one compact package.
                                          • Small Footprint Ideal for historic buildings with tight mechanical space.
                                          • Equal Percent Control Mirrors coil heat transfer curves for superior temperature regulation.
                                          • Pre-Assembled & Ready to Install Reduces labor, installation time, and jobsite handling.

                                          I told Gary to get the Griswold Control valves on order and let my purchasing department know how much the bill would be.

                                          — A.J. Mattern, Chief Facilities Engineer, Hotel Monteleone

                                          Because the Automizer features automatic flow control, the retrofit could be accomplished a few rooms at a time without affecting the rest of the hotel's circuits — making it the ideal product for hotel renovation. In a manual balance application, the entire system would have had to be rebalanced every time a room was taken offline. By installing the Automizer, the hotel minimized room downtime, substantially reducing the potential for lost revenue.

                                          The Results

                                          Phase 1 (2002): The Monteleone Hotel renovated guest rooms with 288 Automizer CPP2A packages on horizontal units, plus a number of 3-way Unimizer® actuated control valves on vertical units.

                                          Phase 2 (2004): The hotel ordered an additional 112 Automizer coil piping packages. The re-order decision was automatic — a direct result of satisfaction with Phase 1 performance.

                                          Because the Automizer features automatic flow control, rooms could be renovated individually without requiring a system-wide rebalance — protecting guest comfort and preventing revenue loss.

                                          The success at the Monteleone Hotel demonstrates how a technically superior product can simplify phased renovation in occupied, operating buildings — protecting revenue while delivering measurable long-term performance gains.

                                          It's nice when you are selling a quality product like Griswold Controls. You put your time and effort into getting that first order, and then getting the next order just takes a few minutes on the phone.

                                          — Gary Lewis, Schully Strawn & Associates

                                          They work great! I'm very satisfied and look forward to buying Griswold Controls for every new FCU in the hotel as we continue to renovate additional rooms.

                                          — A.J. Mattern, Chief Facilities Engineer, Hotel Monteleone

                                          Automizer® Combination Control Valves

                                          Automizer® Next Generation valves combine an actuated 2-way control valve with a stainless steel automatic flow limiting cartridge and manual isolation ball valve — all within one compact body.

                                          • Globe Valve Performance Ball valve pricing with equal-percent control.
                                          • Patented Optimizer® Inserts 30–50% greater rotation response.
                                          • Automatic Flow Limiting Eliminates overflow and underflow.
                                          • Field Repairable Stem Resistant to chemical treatments and temperature swings.

                                          Coil Piping Packages & Hose Kits

                                          Griswold Controls offers over 900 standard pre-plumbed coil piping packages that simplify engineering design and speed installation.

                                          • Pre-Assembled & Shrink-Wrapped Ships ready to install.
                                          • 48-Hour Shipping Standard packages up to 2″.
                                          • Automatic or Manual Flow Options Works for any balancing application.
                                          • Single Source Supply Eliminates compatibility concerns.
                                          Griswold Controls Case Studies

                                          Have a question about this or another Griswold Controls Case Study?

                                          Fill out the form below and someone from Griswold Controls will get back to you shortly.


                                            Please prove you are human by selecting the cup.

                                            Las Vegas’ Wynn Hotel & Casino

                                            Wynn Las Vegas Resort – Las Vegas

                                            Utilization of Griswold Controls coil piping packages to save a significant amount of install time for the new Wynn Las Vegas Resort.

                                            Project Overview

                                            Application Fan Coils, VAV Boxes
                                            Contractor Southland Industries & Hansen Mechanical
                                            Engineer/Consultant JBA Consulting Engineers
                                            Completion Date May 2006
                                            Griswold Controls Case Study - Las Vegas Wynn Hotel

                                            The most recent – and stunning – addition to the southern Nevada skyline is the new Wynn Las Vegas Resort. Built at a cost of $2.7 billion dollars and opened in April 2005, the 50-story bronze tower contains 2,700 luxury hotel rooms with floor-to-ceiling windows, 22 restaurants, the 2,000 seat “Aqua Theater-in-the-Round,” and the “Promenade” with luxury boutique shopping. Built on the site of the former Desert Inn, it also includes an 18-hole golf course. Whereas most high-end hotels have car rental desks, Wynn Las Vegas houses a Ferrari-Maserati car dealership inside the resort. The front entrance and three-acre Lake of Dreams are shielded from the street by a 140-foot tall mountain with 60-foot tall pine trees.

                                            Steve Wynn, who had previously built the Mirage (1989), Treasure Island (1993) and Bellagio (1998) hotels, conceived and developed Wynn Las Vegas. Several years ago he sold those three properties to MGM Grand in order to develop Wynn Las Vegas. This resort-casino clearly establishes a new threshold for local, high-end properties. JBA Consulting Engineers, Las Vegas, is the mechanical engineering firm responsible for the project. Bid and mechanical construction activity was divided into seven distinct areas, and the specification allowed for either automatic or manual flow controls. Southland Industries, Las Vegas, handled area one and the central plant, and Hansen Mechanical of Las Vegas was awarded responsibility for areas two through seven, which covered the tower.

                                            Engineered Equipment & Systems Co., the Griswold rep for southern Nevada, successfully convinced Southland Industries and Hansen Mechanical to utilize Griswold coil piping packages. Unimizers® were installed on a majority of the fan coils, VAV boxes, heating coils and heat pumps in the hotel rooms, showrooms, the Aqua Theater and the villas.

                                            According to Matt Miceli, the Engineered Equipment & Systems Co. sales engineer responsible for the project, the Unimizer packages significantly reduced Hansen’s ATC coordination costs. Matt said, “Hansen has been a Griswold Controls customer for some time. They especially like Griswold’s coil hookup packages and the way we shrink-wrap them. No other vendor provides this packaging concept. This project also offered them the opportunity to add the Unimizer® to the packages, which greatly simplified the coordination with the ATC contractor. The project time frame was extremely aggressive and the Unimizer® packages saved the contractor a significant amount of install time.” James Gomel, Hansen Mechanical project manager, stated, “The Griswold coil-piping packages allow for installation consistency to the systems along with a valuable savings in labor cost. In addition, incorporating the Unimizer® with the package allows for a complete installation of the coil-piping package, thus eliminating the need for additional labor required to install the controller in the field."

                                            In total, over 2,000 Griswold Controls piping packages are installed on the project along with over 20 air handler packages in area one. In addition to the flow controls and coil piping packages, Engineered Equipment & Systems Co. sold in excess of $100,000 worth of Griswold Filtration separators and separator package filtration systems for the numerous cooling towers on the project.

                                            Griswold Controls Case Studies

                                            Have a question about this or another Griswold Controls Case Study?

                                            Fill out the form below and someone from Griswold Controls will get back to you shortly.


                                              Please prove you are human by selecting the car.

                                              W Hotel & Victory Park, Dallas

                                              W Hotel & Victory Park – Dallas

                                              Griswold Controls helps to re-shape the downtown Dallas skyline, providing space saver packages to maximize floor space in the hotel.

                                              Project Overview

                                              Application Terminal Units, Vertical Heat Pumps & Horizontal Heat Pumps
                                              Contractor Brandt Engineering
                                              Engineer/Consultant James Johnston & Associates
                                              Completion Date May 2006
                                              Griswold Controls Case Study - Dallas’ W Hotel & Victory Park

                                              Located in the heart of Dallas, just north of the downtown business district in a formerly unusable inner city site, Victory Park is one of the country’s most significant master planned urban developments. The project began with the construction of the American Airlines Center Arena in late 2000, home of the Dallas Mavericks basketball team and the Dallas Stars hockey team. A acre urban center, when complete Victory Park will offer retail establishments, dining, modern office space, residential units, entertainment venues, and a cutting-edge hotel. Part of the development will include Victory Plaza, an area reminiscent of Times Square in New York City.

                                              In 2005, immediately across the street from the American Airlines Center, McCarthy General Contractors broke ground on what is now the W Hotel. The W Hotel, owned by Starwood Properties, is a 33 story luxury condo–hotel offering unique and exciting interiors, classic W amenities including terry/pique robes, an infinity edge swimming pool on the 16th floor, and top–notch restaurants and lounges. W Benton Wofford of James Johnston & Associates, the Consulting Engineer, designed the building to include hotel facilities up to the 15th floor, and luxury condo units from the 16th to 30th floors. Ross Perot Jr. has his own private penthouse suite complete with his own personal heliport on the roof.

                                              Griswold Controls IRIS automatic packages with hoses were purchased for the terminal units; vertical stack heat pumps in the hotel rooms; and to maximize floor space, horizontal heat pumps for the condo units. Griswold Controls space saver packages were selected on the vertical stack units because space limitations required that the packages fit inside the heat pump cabinets.

                                              Matt Summerville of Brandt Engineering, project manager for the mechanical contractor and long-time Griswold Controls customer, was pleased to provide Griswold Controls with project details. As a matter of fact, Brandt employee Mike Clark, the piping superintendent, told Griswold Controls that he had no problems whatsoever with any of the 382 Griswold Controls packages on the W Hotel and would not only use Griswold Controls products again, but would highly recommend them.

                                              The W Hotel opened in June, 2006.

                                              Griswold Controls Case Studies

                                              Have a question about this or another Griswold Controls Case Study?

                                              Fill out the form below and someone from Griswold Controls will get back to you shortly.


                                                Please prove you are human by selecting the cup.

                                                Hotel Intercontinental, Chicago, Illinois

                                                Hotel InterContinental Case Study

                                                Improving room comfort with Griswold Controls' Automizer® combination control valves and Coil Piping Packages

                                                Project Overview

                                                Application: Hotel
                                                Griswold Controls Solution: Automizer® combination control valves, Coil piping packages
                                                Contractor: Bovis Lend Lease, Inc. Tobin Stanley
                                                Engineer/Consultant: Edwards Engineering Marc Crampton
                                                Completion Date: 2000
                                                Hotel InterContinental - North Tower renovation

                                                The Hotel Inter-Continental was built in 1929 as the Medinah Athletic Club. The contemporary North Tower was added later.

                                                Cramped Spaces Prompt Ingenuity

                                                During the renovation, more than 500 fan coils were replaced in North Tower guest rooms. Units were installed above the ceiling in the entry vestibule of the rooms, leaving only 12" of vertical space for the manual balancing system. Tobin Stanley of Bovis Lend Lease contacted Griswold Controls to provide pre-assembled coil piping packages with Automizer® combination control valves, saving space and labor during installation.

                                                "This gave the client the opportunity to purchase prefab equipment and just put (it) in. This also meant that installers would spend minimal time on the site, so only two floors would have to be closed at a time."

                                                — Bill Toth, Griswold Controls Sales Representative

                                                Coil Piping Packages Provide Numerous Benefits

                                                The balancing cartridge in the Automizer is factory preset to automatically limit the flow for each room or zone, eliminating the need for startup balancing and any subsequent rebalancing. The automatic balancing packages saved the hotel approximately $35,000 in start-up labor alone.

                                                For this project, the standard coil package included the flow limiting cartridge of the Automizer combined with a low-torque, equal-percentage actuated ball valve and factory mounted Siemens actuators. The entire piping package takes up roughly one-fourth the space of a typical manual piping configuration.

                                                Trouble-Free Balancing, Increased Comfort

                                                With the renovation complete and the North Tower in full operation, Kees Guijt, regional director of engineering, reports there has been a significant drop in guest complaints regarding room comfort.

                                                Automizer® & Coil Piping Packages

                                                Automizer® Next Generation combination control valves
                                                Automizer® combination control valves

                                                Automizer® Next Generation valves feature Griswold Controls' field repairable stem design and allow for field servicing without removal. These all-in-one valves combine an actuated temperature control valve with an automatic flow limiting cartridge, making them ideal for schools, office buildings, VAV boxes, fan coil units, heat pumps, and terminal boxes.

                                                Coil Piping Packages & Hose Kits

                                                Griswold Controls offers over 900 standard packages, pre-assembled for easy installation and timely delivery. Options like hoses and extension kits are also available.

                                                • Wide selection of pre-assembled, easy-to-order configurations
                                                • Easy ordering: order by specific part numbers
                                                • Timely delivery of standard packages
                                                • Variety of options: downsized automatic temperature control, extra ports, inclusion of Automizer or Unimizer valves
                                                Griswold Controls Case Studies

                                                Have a question about this or another Griswold Controls Case Study?

                                                Fill out the form below and someone from Griswold Controls will get back to you shortly.


                                                  Please prove you are human by selecting the flag.

                                                   

                                                  Infrastructure:

                                                  JOAQUIN MURRIETA PARK

                                                  Joaquin Murrieta Park

                                                  Renovation and State-of-the-Art Irrigation System Installation to Sustain Tucson’s Iconic Green Space

                                                  Location Tucson, Arizona
                                                  Completion Date Late 2024
                                                  Sales Rep SiteOne Landscape Supply

                                                  Photo from City of Tucson

                                                  Project Description

                                                  The City of Tucson has embarked on an ambitious renovation project for Joaquin Murrieta Park, an iconic green space on the city’s westside. A community hub for decades, the park has served as a recreational destination for families, sports enthusiasts, and residents alike.

                                                  Infrastructure wear and tear necessitated a complete overhaul. Now closed for extensive renovations, the park is expected to reopen in late 2024 with an impressive array of new features.

                                                  The renovation, spearheaded by Tucson Mayor Regina Romero and the City Council, is transforming the park into a modern recreation facility. The project includes a new four-field baseball and softball complex, a splash pad, two playgrounds, new walking paths, and parking improvements.

                                                  A key aspect of the renovation is the installation of a state-of-the-art irrigation system to ensure the park remains green and inviting, even during Tucson’s arid summers. This includes Griswold DWS Series Dirty Water Irrigation Valves, chosen for their ability to handle reclaimed and dirty water, a vital feature for sustainable water management in public parks.

                                                  Challenges and Solutions

                                                  One of the project’s main challenges was updating the park's irrigation system to meet modern sustainability standards while minimizing downtime and maintenance costs. Tucson’s water conservation efforts rely heavily on reclaimed or “dirty” water, which requires specialized equipment to handle potential contaminants.

                                                  Griswold DWS Series Dirty Water Valves solved this challenge. They feature a self-cleaning mechanism that eliminates the need for filters or screens, along with durable bronze construction for a longer lifespan and reduced maintenance. The valves also include a “slow to open – slow to shut” design, preventing water hammer and ensuring reliable irrigation flow across the park.

                                                  Benefits and Outcomes

                                                  The inclusion of Griswold’s DWS Series Dirty Water Valves provides multiple benefits for Joaquin Murrieta Park:

                                                  • Reduced Water Waste & Improved Plant Health: Slow-closing valves prevent pipe damage, lower long-term maintenance needs, and ensure the park remains lush and healthy year-round.
                                                  • Reliable Operation with Reclaimed Water: Valves are engineered to handle dirty or reclaimed water efficiently, supporting Tucson’s sustainability goals.
                                                  • Lower Maintenance Costs: Self-cleaning design minimizes service time, reduces operational downtime, and ensures consistent irrigation performance.
                                                  • Enhanced Community Experience: These improvements ensure Joaquin Murrieta Park remains a vibrant, functional space for families, athletes, and residents, even during Tucson’s driest months.

                                                  Products Used

                                                  DWS Series Dirty Water Valves: These valves were selected for their ability to handle reclaimed water, durable bronze construction, self-cleaning mechanism, and a five-year warranty, making them ideal for municipal irrigation projects like Joaquin Murrieta Park.

                                                  Featured Projects Have a question about this or another Featured Project? Fill out the form below and someone from Griswold Controls will get back to you shortly.


                                                    Please prove you are human by selecting the tree.

                                                    About SiteOne Landscape Supply

                                                    With unmatched product breadth, and locations within reach of virtually any job, SiteOne Landscape Supply is the nation’s largest supplier of wholesale goods for green industry professionals in the United States and Canada. Their local experts know your community, and what it takes to succeed there, because it’s their hometown, too.

                                                    We Would Love to See Your Projects!

                                                    Do you have...

                                                    First Solar

                                                    First Solar Manufacturing Facility

                                                    Transforming renewable energy manufacturing with advanced HVAC flow control solutions.

                                                    Location Lawrence County, Alabama
                                                    Date of Completion 2025

                                                    Project Description

                                                    Sustainability has become a driving force for governments, businesses, and consumers around the world. As the importance of sustainable practices continues to rise, companies across industries are making strategic investments to support a cleaner and more resilient future.

                                                    Recognizing this global momentum, First Solar embarked on a transformative initiative to expand renewable energy manufacturing in the United States. The company is investing an unprecedented $1.1 billion to establish a state-of-the-art photovoltaic (PV) solar module manufacturing facility in Lawrence County, Alabama. Scheduled to begin operations in 2025, this facility represents a major milestone in advancing domestic renewable energy technology and production.

                                                    The new manufacturing complex will serve as a hub of innovation and technological advancement, with anticipated domestic manufacturing capacity exceeding 10 gigawatts (GW) by 2025. This investment reinforces First Solar’s commitment to strengthening the nation's renewable energy infrastructure while expanding high-tech manufacturing capabilities within the United States.

                                                    Beyond technological progress, the project will also deliver substantial economic benefits. The new facility will create jobs, stimulate the regional economy, and support the growth of the renewable energy sector while reducing reliance on imported solar technologies.

                                                    Challenges and Solutions

                                                    A project of this scale required an HVAC system capable of supporting a massive manufacturing environment while maintaining precise thermal control and energy efficiency. The chilled water infrastructure needed reliable flow regulation to ensure consistent performance across the facility's extensive heating and cooling systems.

                                                    To address these requirements, the system integrated two key Griswold Controls products: QuickSet Brass Valves and 3” to 24” Wafers with Automatic Flow Limiting cartridges.

                                                    These components provide precise flow management, allowing engineers to maintain system balance while simplifying installation and long-term maintenance across the large-scale HVAC network.

                                                    Benefits and Outcomes

                                                    The integration of Griswold Controls products helped ensure the facility’s HVAC infrastructure operates efficiently despite the significant scale of the manufacturing complex. With accurate flow control and dynamic pressure compensation, the system maintains optimal operating conditions throughout the facility.

                                                    By reducing installation complexity and ensuring consistent water flow, the project achieved improved system reliability, enhanced energy efficiency, and reduced operational costs. The solution also supports the facility’s sustainability objectives by optimizing HVAC performance while minimizing energy waste.

                                                    Ultimately, these improvements contribute to a more efficient manufacturing environment capable of supporting one of the most advanced solar module production facilities in the world.

                                                    Products Used

                                                    Integral to the success of this large-scale project were two specialized Griswold Controls solutions designed for precision flow control and reliable HVAC performance.

                                                    QuickSet Brass Valves

                                                    QuickSet Brass Valves are manual balance valves designed to provide precise and accurate flow control. Featuring a durable brass body and stainless steel stem, these valves include a memory stop that allows the system to return to a preset flow rate after shutdown.

                                                    3” to 24” Wafers with Automatic Flow Limiting Cartridges

                                                    3” to 24” Wafers with Automatic Flow Limiting cartridges maintain system balance regardless of pressure fluctuations by dynamically controlling flow within ±5% of the design specification.

                                                    The scale of this project is notable—Griswold Controls rarely supplies valves as large as 24 inches, yet ten of these large valves were required for this facility.

                                                    Driving Renewable Energy Innovation

                                                    First Solar’s Alabama manufacturing facility represents a major investment in renewable energy infrastructure within the United States.

                                                    The facility will strengthen the nation’s solar manufacturing capacity while supporting job creation and expanding clean energy production.

                                                    Have a question about this or another Featured Project? Fill out the form below and someone...

                                                    LAX Automated People Mover

                                                    LAX Automated People Mover – HVAC Upgrade

                                                    Los Angeles, California | Completed 2023

                                                    Location: Los Angeles, California
                                                    Date of Completion: 2023
                                                    Griswold Controls Products Used: Coil Piping Packages & Large Flanged QuickSet

                                                    Photos from Railway Technology

                                                    Project Description

                                                    Los Angeles International Airport (LAX), a global aviation hub serving a staggering 88 million passengers in 2019, is in the midst of a groundbreaking transformation. A colossal $15 billion modernization endeavor is underway, with one of its central components being the implementation of an innovative Automated People Mover (APM) system.

                                                    The APM is a state-of-the-art electric train network, gliding along a 2.25-mile elevated guideway with six strategically positioned stations. Three stations are within the Central Terminal Area (CTA), while the other three stand outside. This system connects passengers to rental car facilities, parking garages, and public transportation, significantly reducing traffic congestion while improving the passenger experience. The APM operates 24/7, with trains every 2–3 minutes during peak hours, completing the journey in just 10 minutes.

                                                    Griswold Controls was entrusted with providing its industry-leading HVAC solutions for this project, supporting heating and cooling systems in both stations and trains. This collaboration continues Griswold Controls' long-standing involvement with LAX International Airport.

                                                    Products Used

                                                    Griswold Controls' Coil Piping Packages (CPPs) are pre-assembled piping systems that streamline installation while reducing field assembly errors. Each package includes flow control valves, isolators, ball valves, unions, Y-strainers, temperature control valves, stainless steel hoses, insulated hoses, air vents, pressure/temperature test valves, and drain valves. This integrated solution saves time, reduces labor, conserves energy, and lowers maintenance costs.

                                                    Large Flanged QuickSet valves were also used to provide precise manual flow control. These valves feature brass venturi inserts for accurate flow measurement, graduated memory stops for flow adjustment, low-pressure drop, exceptional sealing, and are suitable for air handling units, chillers, cooling towers, and pumps. Sizes range from 2.5" to 20" in various end styles.

                                                    Project Impact

                                                    Through Griswold Controls’ expertise, the LAX Automated People Mover now benefits from highly efficient and reliable HVAC systems, ensuring consistent comfort for millions of travelers each year. The collaboration demonstrates Griswold Controls’ commitment to delivering high-performance solutions for large-scale, complex infrastructure projects.

                                                    Featured Projects Have a question about this or another Featured Project? Fill out the form below and someone from Griswold Controls will get back to you shortly.


                                                      Please prove you are human by selecting the house.

                                                      About J.D. Sales Company

                                                      Founded in 1972, J.D. Sales Company has built a reputation for excellence by focusing on learning, continuous improvement, and empowering their team to deliver the best solutions for customers. Guided by core values of integrity, long-term investment, and relationship building, the company consistently strives to provide outstanding service and dependable results.

                                                      Each day, J.D. Sales Company works diligently to make a positive impact for their clients, earning trust and respect through professionalism and commitment. Their dedication ensures that customers experience not only reliable HVAC and plumbing solutions but also a partnership they can count on. As they proudly state, “We genuinely hope you love doing business with us!”

                                                      We Would Love to See Your Projects!

                                                      Do you...

                                                      Metro Wastewater

                                                      Location: Denver, Colorado Date of Completion: Unknown Representative: Long Building Tech CPP-2QIS & CPP3QIS Description: The Metro Wastewater Reclamation District is the wastewater treatment authority for much of...

                                                       

                                                      Manufacturing:

                                                      GM Lordstown Electric Battery Plant

                                                      GM Lordstown Electric Battery Plant

                                                      High-performance HVAC flow balancing supporting one of the largest electric vehicle battery manufacturing facilities in the United States.

                                                      Location Lordstown, Ohio
                                                      Date of Completion June 2021
                                                      Representative R.L. Deppmann
                                                      Griswold Controls Products Used QuickSet Manual Balance Valves

                                                      Photos from Gresham Smith

                                                      Facility Description

                                                      What do Grand Central Station, Ellis Island, and the grounds of the U.S. Capitol all have in common? They are each smaller than the massive 2.8-million-square-foot GM Electric Battery Plant built in Lordstown, Ohio.

                                                      General Motors partnered with LG to construct this extraordinary facility. With a $2.3 billion investment, over 1,100 new jobs created, and more than 14,000 hours of development work, the plant is designed to produce batteries for GM’s expanding electric vehicle lineup.

                                                      The facility is capable of producing approximately 30 GWh (gigawatt hours) of battery capacity annually, with the potential for future expansion. For comparison, the fictional DeLorean from Back to the Future required 1.21 gigawatts of power—about 1,622,637 horsepower.

                                                      As electric vehicles become increasingly common, facilities like this will play a critical role in shaping the future of transportation. GM’s Ultium lithium-ion battery technology uses 70% less cobalt and replaces it with recyclable aluminum, helping ensure long-term sustainability and scalability.

                                                      Project Description

                                                      With millions of square feet of manufacturing space and highly advanced production technology, the facility requires a dependable HVAC system capable of maintaining stable conditions across the entire building.

                                                      To support this need, Griswold Controls QuickSet manual balance valves were implemented to provide precise system flow balancing and reliable long-term performance.

                                                      Products Used

                                                      QuickSet Manual Balance Valves

                                                      QuickSet manual balance valves feature brass venturi inserts for accurate flow measurement and graduated memory stops for precise flow adjustment. Multiple end connection options are available, including union connections, allowing for flexible installation.

                                                      No straight pipe runs are required for normal operation. When paired with a butterfly valve for shutoff, the 2-1/2″ to 20″ Metering Station becomes a fully functional QuickSet Manual Balance Valve with memory stop for accurate system balancing.

                                                      Valves with accessory ports are also available to accommodate additional monitoring and system accessories.

                                                      Recommended Applications

                                                      • Where a simple solution is needed for proportional or static balanced systems with constant speed pumping.
                                                      • Where flow balancing, flow metering, and shut-off are desirable in a single valve.
                                                      • Where optimum system flow balance is required while using minimum horsepower.
                                                      Featured Projects Have a question about this or another Featured Project?

                                                      Fill out the form below and someone from Griswold Controls will get back to you shortly.


                                                        Please prove you are human by selecting the heart.

                                                        About R.L. Deppmann

                                                        R.L. Deppmann is a stocking manufacturer representative that is 100% employee-owned. Their organization is guided by three core values: Knowledge, Responsiveness, and Empowerment.

                                                        They provide expertise and solutions for boilers, water heaters, heat exchangers, pumps, steam products, valves, and HVAC and plumbing specialties used in both building systems and industrial processes.

                                                        R.L. Deppmann operates warehouse facilities near Cleveland, Detroit, Grand Rapids, and Saginaw, with more than 32,000 square feet of combined warehouse space to support customers and maintain backup inventory for their wholesale partners.

                                                        We Would Love to See Your Projects!

                                                        Do you have a project that showcases Griswold Controls products?

                                                        We would love to feature you! Submit a contact form with project details so we can feature the project on our website.

                                                         

                                                        Military:

                                                        The DMAFB General Instruction Building

                                                        Location: Tucson, AZ Date of Completion: September 2019 Representative: Varitec Solutions  Griswold Controls Products Used: CPP-2IRIS Packages with customer supplied ATCs Facility Description: The U.S. Air Force, in conjunction with the...

                                                         

                                                        Technology:

                                                        eBay Utah Data Center – Pressure Independent MVP Valves

                                                        eBay Utah Data Center

                                                        Innovative energy-efficient design and pressure independent control solutions for a cutting-edge data center in Salt Lake City, Utah.

                                                        Location Salt Lake City, Utah
                                                        Date of Completion 2013
                                                        Griswold Controls Products Used Pressure Independent MVP Valves

                                                        Photos by Roy Pena, Digital Forge Media

                                                        Facility Description

                                                        Have you ever been surfing on eBay, looking for something interesting? How about sending or receiving money using PayPal? Bought tickets using StubHub? These are all functions that the eBay Utah Data Center server is performing today.

                                                        This data center is the world’s first to use Bloom Energy Savers™ as its main power source instead of relying on the grid. The facility cools IT equipment with plate heat exchangers mounted directly to the racks and uses outside air with evaporative cooling towers instead of industrial chillers.

                                                        The facility is supplied by Griswold Controls’ Pressure Independent MVP valves, available in sizes 2-1/2″ to 10″ and flows from 40 GPM to 1220 GPM, providing precise pressure-independent flow control.

                                                        Project Description

                                                        Pressure Independent MVP valves reduce energy costs and improve occupant comfort by precisely controlling the flow to each coil. This reduces over- and under-flow, minimizes actuator cycling, increases available plant capacity, and simplifies system design.

                                                        By accurately controlling water flow, the valves also reduce the need for additional pumping, minimize capital expenditures, and maximize energy efficiency.

                                                        Learn more about other data centers with Griswold Controls products here.

                                                        Featured Projects Have a question about this or another Featured Project?

                                                        Fill out the form below and someone from Griswold Controls will get back to you shortly.


                                                          Please prove you are human by selecting the key.

                                                          We Would Love to See Your Projects!

                                                          Do you have a project that showcases Griswold Controls products?
                                                          We would love to feature you! Submit a contact form with project details so we can feature the project on our website.

                                                          Facebook Data Center – New Mexico

                                                          Facebook Data Center – New Mexico

                                                          Liquid Cooling for the Future of AI

                                                          Location Los Lunas, New Mexico
                                                          Date of Completion 2021
                                                          Representative Massey Johnson Associates
                                                          Griswold Controls Products Used Isolator U, Isolator S

                                                          Facility Description

                                                          $1 billion dollars and 4 years later, the 510,000 sq ft (47,000 sq m) Facebook data center in Los Lunas, New Mexico has been completed. The campus has been fitted with the latest OCP compute, storage, and networking technologies which translates to a very quick data center.

                                                          Powered mostly by renewable energy, this data center created more than 300 construction jobs and 50 permanent jobs. Even the governor of New Mexico had something to say:

                                                          “Facebook is a stellar, cutting-edge, high-tech company, and it’s an honor to welcome them to New Mexico. Making our state more competitive for jobs and new investment is critical to growing our private sector and diversifying our economy.”

                                                          Who knows, maybe your profile is stored there…

                                                          Project Description

                                                          If your profile is stored there, just know it is in capable, air-conditioned hands. This project has been fitted with a custom coil piping package including Isolator U and Isolator S valves installed all over the building. Griswold Controls has expanded our offering of these components to include larger accessories components like flanges, flange adapters, and tees to build larger air handling unit packages so that in the future, Facebook can decide to expand and further custom tailor the valves to suit their HVAC needs. Griswold Controls also offers accessories like combination air vent and pressure-temperature test valves, automatic air vents, pressure-temperature test valves, hoses, and drain valves.

                                                          Featured ProjectsHave a question about this or another Featured Project?

                                                          Fill out the form below and someone from Griswold Controls will get back to you shortly.


                                                            Please prove you are human by selecting the tree.

                                                            About Massey Johnson Associates

                                                            For over 50 years, Massey Johnson Associates is a professional Manufacturers' Representative agency that specializes in Specification Products, Commercial Plumbing Products, and Mechanical Equipment for Residential and Commercial Applications. They value business ethics, experience, relationships, product knowledge, and are dedicated to being fully educated in the products they represent.

                                                            We Would Love to See Your Projects!

                                                            Do you have a project that showcases Griswold Controls products?
                                                            We would love to feature you! Submit a contact form with project details so we can feature the project on our website.