Maintaining optimal heating and cooling in an educational facility isn’t just about student and teacher comfort. While studies show that students learn better in comfortable temperatures, students of this generation care more about sustainable living than any prior generation and base many decisions, including their educational choices, on green living. Therefore, reducing your campus’ carbon footprint, while saving money on HVAC energy costs and maintaining student comfort, helps your campus’s HVAC System score an A+ for efficiency. Griswold Controls - Application Tips Schools Reduce Energy to Heat and Cool Buildings For over 55 years, Griswold Controls has improved the efficiency of hydronic HVAC equipment (coils, AHU, terminal units, etc) in HVAC Systems by controlling the flow rate of hot or cold water to the coils. Griswold Controls designed the first balance valve on the market, our automatic flow limiting cartridge controls the flow regardless of pressure changes in the system; which guarantees the coil performs at the engineer’s design Delta T at all times. Controlling the flow also eliminates distracting water noise that occurs when a system pumps too much conditioned water. In the early 2000s, Griswold Controls launched pressure independent valves for Universities and School campuses. Controlling the climate is a precise job. With a pressure independent valve you can control the flow at all times, even in reduced load conditions. Griswold Controls’ latest product line, the EPIC System, directly controls the Delta T of the coil, reducing energy from over-pumping while maintaining adequate cooling. Application Tips - Education Guaranteed Heating and Cooling Automatic flow limiting valves, pressure independent valves, and the EPIC System are all automatic and don’t require any balancing at the job site, so the flow rate or Delta T at the coil meets the engineer’s design specifications from the moment the system is started up. They continue to provide design flow or design Delta T even as the building is occupied and the loads change, guaranteeing the correct heating or cooling at all times and helping your campus facilities “make the grade!”

Questions about this application?

Contact info@GriswoldControls.com, call 949.559.6000 or fill out the contact form on this page.

Griswold Controls Application Tips Do you have a question on this Application Tip or any of the Griswold Controls products? Fill out the form below and someone from Griswold Controls will get back to you shortly.


    Please prove you are human by selecting the plane.

    Read about Griswold Controls’ work in Education below:

    Wesleyan University Science Building

    Location: Middletown, Connecticut Completion Date: 2026 Sales Rep: Mechanical Solutions, Inc. Griswold Controls Products Used: Isolator B Valve, Isolator S Valve, and Union   Description: For a...

    Yale New Haven Hospital Adams Neuroscience Center

    Location: New Haven, Connecticut Completion Date: 2026 Sales Rep: Mechanical Solutions, Inc. Griswold Controls Products Used: Coil Piping Package including Isolator R Valve   Description: What started...

    Zoetis Vivarium

    Location: Lincoln, Nebraska Completion Date: August 2023 Sales Rep: Hydronic Energy, Inc. Griswold Controls Products Used: Coil Piping Package including QuickSet Manual Balance Valve   Description: A global...

    Homestead Wakefield Elementary School HVAC Upgrade

    Location: Bel Air, Maryland Completion Date: Fall of 2025 Sales Rep: Hydro Tec Sales and Service Griswold Controls Products Used: Coil Piping Package including QuickSet Manual Balance Valve...

    Spelman College

    Location: Atlanta, Georgia Completion Date: N/A Sales Rep: Hoffman Hydronics Griswold Controls Products Used: Coil Piping Package & QuickSet Manual Balance Valves and Strainers   Description: Nestled in the...

    Arizona Western College – DeAnza Residence Hall

    Location: Yuma, Arizona Griswold Controls Products Used: CPP-2IRIS and CPP 3IRIS with Unimizer Actuated Valves   Description: Arizona Western College (AWC) is anticipating a proud celebration: the completion...

    University of Michigan – Leinweber Building

    Location: Ann Arbor, Michigan Date of Completion: Summer 2025 Griswold Controls Products Used: QuickSet Coil Piping Packages (CPPs) with Hoses   Description: For those who don’t know: The...

    Celina Elementary School

    Location: Celina, Ohio Date of Completion: Summer 2024 Griswold Controls Products Used: Custom AHU CPPs, CPP-2BIS, and Flanged QuickSet   Description: Welcome to Celina Elementary School, an idyllic,...

    Lake Land College – Neal Hall

    Location: Mattoon, Illinois Date of Completion: Started Feb. 1st, 2023 Griswold Controls Products Used: CPP-QuickSet & QuickSet Manual Balance Valves   Description: Neal Hall is located on Lake...

    L&I/WSDA Safety and Health Lab

    Location: Tumwater, WA Date of Completion: November 2022 Representative: Proctor Sales Griswold Controls Products Used: Automatic & Manual CPPS - 2IRIS and 1QIB   Description: Facility Description: The...

    North Seattle College Library Renovation

    Location: Seattle, Washington Date of Completion: 2021 Representative: Proctor Sales Griswold Controls Products Used: Automatic CPP-2IRIS with Unimizers   Description: Space Needle, national parks, and rain: these are...

    Lowell Elementary School

    Location: Waterloo, Iowa Date of Completion: Estimated - January 2022 Representative: Hydronic Energy Griswold Controls Products Used: CPP-IRIS, Flanged QuickSet, Uni-Flange, and Isolator R valve   Description: 90...

    Educational Learning Center

    Location: Coquitlam, British Columbia Date of Completion: 2021 Representative: Riada Sales Inc Griswold Controls Products Used: CPP-2 PIC-V, CPP 2IRIS w/ Automatic Flow Limiting Valves, CPP-2IRIS w/ 3-way...

    Wester Middle School

    Location: Frisco, Texas Date of Completion: 2021 Representative: Texas AirSystems Griswold Controls Products Used: CPP-2IRIS Coil Piping Package   Description: Facility Description: Wester Middle School serves not only...

    Arizona State University- Interdisciplinary Science and Technology Building VII

    Location: Tempe, Arizona Date of Completion: To be completed in 2022 Representative: Varitec Solutions Griswold Controls Products Used: 2000 CPP’s IR’s IS’s and IB’s – ½” and ¾”...

    320 York Street- Yale’s Hall of Graduate Studies

    Location: 320 York St, New Haven Connecticut Date of Completion: Fall 2020 Representative: Mechanical Solutions Griswold Controls Products Used: CPP-2IRIS Packages with QuickPress and customer supplied ATCs Description: Facility...

    North City Campus Modernization

    Location: Shoreline, WA Date of Completion: Fall 2019 Representative: Proctor Sales Griswold Controls Products Used: CPP-2IRISU, CPP-3IRISU with customer supplied Actuators Description: North City Campus Modernization includes the...

    University of California, Irvine

    A Higher Tech Education - Ease of installation and continued product support make the difference at UC Irvine Griswold Controls Solution: Automizer® Coil Piping Packages Contractor: A.O. Reed...

    Southern Indiana Career and Technical Center

    Griswold Controls works with Indiana high school to operate the HVAC system as efficiently as possible using MVP Valves. Application: Air Handling Units Griswold Controls Solution: MVP Valves...

    University of California Merced

    Griswold Controls helps UC Merced meet it's "green" campus mission through the use of the 2000 series valves to operate the irrigation systems. Application: Irrigation Project Griswold Controls...

    David Braley Athletic Centre, McMaster University

    Replacing the conventional control and balancing valves with Griswold Controls pressure independent control valves to reduce energy consumption. Griswold Controls Has the Inside Track at McMaster University The...

    Perdue School of Business Chilled Water

    Improved efficiency of the chilled water system at the new Perdue School of Business at Salisbury University through the use of PIC-V and MVP valves. Project: Salisbury University...

    Douthit Hills Dormitory

    Location: Clemson University Date of Completion: Unknown Representative: Heat Transfer Sales Griswold Controls Products Used: Isolator R CPPs Description: Located at the entrance to Clemson University along SC...

    Boston University Center for Integrated Science & Engineering

    Location: Boston, MA Date of Completion: Spring 2016 Representative: Conservation Solutions Corp Griswold Controls Products Used: FlowCon SM PICV and Green PICV Description: A Boston University $140 million,...

    Southern Tier Hi-Tech Incubator

    Location: Binghamton, New York Date of Completion: Unknown Representative: FP Langley QuikSet CPP Description: Binghamton University, SUNY Broome and the regional economic development community are building an incubator...

    New Trier High School

    Location: Chicago, Illinois Date of Completion: Unknown Representative: Imbert Corporation Griswold Controls Products Used: 3/4" – 2", 2QIS Sweat CPPs Description: New Trier serves about 4,200 students from...