    UC Irvine Case Study - Griswold Controls

    A Higher Tech Education for UC Irvine

    Ease of installation and continued product support make the difference at UC Irvine

    Project Overview

    Contractor A.O. Reed
    Mechanical Engineer GEM Engineering & UCI Engineering
    Representative J.D. Sales Company
    Completion September 2005

    UCI Natural Sciences II

    The Challenge

    UC Irvine Natural Science Unit II Building

    In early 2003, GEM Engineering and UC Irvine sought complete coil hookup solutions for the Natural Science Unit II building. Despite competitive pricing from J.D. Sales Company, a competitor initially won the bid with a significantly lower price point.

    However, upon technical review, UC Irvine's engineering team rejected the competitor's product, recognizing the importance of performance and reliability over initial cost savings.

    The Solution

    J.D. Sales Company partnered with Griswold Controls to present an innovative alternative to the traditional approach of using separate components (actuated globe valves, strainers, unions, and isolation ball valves).

    The engineering team was introduced to Griswold's Automizer™ Combination Control Valves and CPP-2A coil piping packages, a streamlined solution that consolidates multiple components into just two valves.

    Key Advantages

    • Superior Flow Performance The Optimizer™ Parabolic Flow Insert delivers globe valve performance at ball valve economics
    • Simplified Installation Complete coil hookup in two valves versus multiple separate components
    • Integrated Design Combines actuation, isolation, and flow control in a single package
    • Long-term Value Reduced installation time and maintenance requirements

    Field Experience

    Site Foreman for A.O. Reed and Company, Kevin Campbell, was worried about installation because he wanted to use his skilled labor most efficiently. Griswold CPP-2A came to the rescue.

    Normally, one man can install 3.5 or maybe 4 coil hookups in one day. "With the Automizer packages," said Kevin, "Our guy was able to install 9 packages per day."

    Automizer™ Combination Control Valve packages not only gave the contractor the entire coil hookup in just two valves, they cut labor at installation. That's because they require only four connections instead of over ten with individual products.

    Remember, low-cost competitors can make sales difficult, but when you take the time to give your customer a higher technology education about Griswold products, they’ll pay back your efforts with orders.

    The Results

    UC Irvine's engineering team recognized the technical superiority and operational advantages of the Griswold solution.

    The project ultimately specified over 200 CPP-2A coil piping packages, demonstrating the value of investing in proven, high-performance technology.

    This success showcases how taking the time to educate customers about superior technology solutions—rather than competing solely on price—results in better outcomes for all stakeholders.

    Griswold Controls Case Studies

    Have a question about this or another Griswold Controls Case Study?

    Fill out the form below and someone from Griswold Controls will get back to you shortly.


      Please prove you are human by selecting the heart.