End User – Building Type

Application Tips for a variety of applications and uses.

For an overview of all our products by complimentary product visit the HVAC 101 brochure.

Read about Griswold Controls’ work in multiple Industries

 

Business:

First National Bank Tower

Location: Omaha, Nebraska Date of Completion: 2002 Representative: Hydronic Energy Griswold Controls Products Used: Originally built with Ultra Z Packages. Now being retrofitted with approximately 800 CPP-IY kits....

The Erie Insurance Building

Location: Erie, Pennsylvania Date of Completion: Spring 2019 Representative: F.P. Langley Co Griswold Controls Products Used: CPP-2IRIS with QuickPress and customer supplied ATCs   Description: Erie Insurance Headquarters’ new...

 

Education:

No posts found

 

Entertainment:

Netflix Sound Stages

Location: Alburquerque, New Mexico Date of Completion: 2024 FlowCon International Products Used: FlowCon E-JUST Valves Griswold Controls Products Used: Griswold Controls Quickset Valves   Description: Vibrant and film-friendly, Albuquerque...

Peppermill Resort Tower

Location: Reno, Nevada Date of Completion: Late 2023 Griswold Controls Products Used: Almost 2000 Automizer Coil Piping Packages with KMC Actuators Installed by GC   Description: Nestled in...

Aquarium of the Pacific – Otter Surrogacy

Video Credit: YouTube

Location: Long Beach, CA Date of Completion: 2021 Representative: J.D. Sales Griswold Controls Products Used: Isolator Y & Combination valves including automatic flow limiting, isolation,...

Las Vegas’ Wynn Hotel & Casino

Wynn Las Vegas Resort – Las Vegas

Utilization of Griswold Controls coil piping packages to save a significant amount of install time for the new Wynn Las Vegas Resort.

Project Overview

Application Fan Coils, VAV Boxes
Contractor Southland Industries & Hansen Mechanical
Engineer/Consultant JBA Consulting Engineers
Completion Date May 2006
Griswold Controls Case Study - Las Vegas Wynn Hotel

The most recent – and stunning – addition to the southern Nevada skyline is the new Wynn Las Vegas Resort. Built at a cost of $2.7 billion dollars and opened in April 2005, the 50-story bronze tower contains 2,700 luxury hotel rooms with floor-to-ceiling windows, 22 restaurants, the 2,000 seat “Aqua Theater-in-the-Round,” and the “Promenade” with luxury boutique shopping. Built on the site of the former Desert Inn, it also includes an 18-hole golf course. Whereas most high-end hotels have car rental desks, Wynn Las Vegas houses a Ferrari-Maserati car dealership inside the resort. The front entrance and three-acre Lake of Dreams are shielded from the street by a 140-foot tall mountain with 60-foot tall pine trees.

Steve Wynn, who had previously built the Mirage (1989), Treasure Island (1993) and Bellagio (1998) hotels, conceived and developed Wynn Las Vegas. Several years ago he sold those three properties to MGM Grand in order to develop Wynn Las Vegas. This resort-casino clearly establishes a new threshold for local, high-end properties. JBA Consulting Engineers, Las Vegas, is the mechanical engineering firm responsible for the project. Bid and mechanical construction activity was divided into seven distinct areas, and the specification allowed for either automatic or manual flow controls. Southland Industries, Las Vegas, handled area one and the central plant, and Hansen Mechanical of Las Vegas was awarded responsibility for areas two through seven, which covered the tower.

Engineered Equipment & Systems Co., the Griswold rep for southern Nevada, successfully convinced Southland Industries and Hansen Mechanical to utilize Griswold coil piping packages. Unimizers® were installed on a majority of the fan coils, VAV boxes, heating coils and heat pumps in the hotel rooms, showrooms, the Aqua Theater and the villas.

According to Matt Miceli, the Engineered Equipment & Systems Co. sales engineer responsible for the project, the Unimizer packages significantly reduced Hansen’s ATC coordination costs. Matt said, “Hansen has been a Griswold Controls customer for some time. They especially like Griswold’s coil hookup packages and the way we shrink-wrap them. No other vendor provides this packaging concept. This project also offered them the opportunity to add the Unimizer® to the packages, which greatly simplified the coordination with the ATC contractor. The project time frame was extremely aggressive and the Unimizer® packages saved the contractor a significant amount of install time.” James Gomel, Hansen Mechanical project manager, stated, “The Griswold coil-piping packages allow for installation consistency to the systems along with a valuable savings in labor cost. In addition, incorporating the Unimizer® with the package allows for a complete installation of the coil-piping package, thus eliminating the need for additional labor required to install the controller in the field."

In total, over 2,000 Griswold Controls piping packages are installed on the project along with over 20 air handler packages in area one. In addition to the flow controls and coil piping packages, Engineered Equipment & Systems Co. sold in excess of $100,000 worth of Griswold Filtration separators and separator package filtration systems for the numerous cooling towers on the project.

Griswold Controls Case Studies

Have a question about this or another Griswold Controls Case Study?

Fill out the form below and someone from Griswold Controls will get back to you shortly.


    Please prove you are human by selecting the flag.

    Los Angeles Music Center’s Disney Concert Hall

    Los Angeles Music Center’s Disney Concert Hall

    By providing piping packages to help offset installation costs and to take advantage of their space–saving features, Griswold Controls provided a cost-effective solution for the hot and chilled water fan coils and air handlers.

    Project Overview

    Application VAV Boxes, Terminal Boxes, Fan Coils & Air Handling Units
    Griswold Representative J.D. Sales
    Products Used Isolator™ Y Coil Piping Packages, Quickset® Manual Balance Valves, Automatic FCVs
    Mechanical Contractor ACCO Engineered Systems, Glendale, CA
    Case Study - Griswold Controls Los Angeles Music Center Disney Concert Hall

    An Iconic Venue for an Iconic Solution

    Walt Disney Concert Hall, Los Angeles

    The Concert Hall was designed by Frank Gehry, an internationally recognized architect whose many credits include the Guggenheim Museum in Bilbao, Spain and the American Center in Paris. The ceiling of the building features wavy, steel forms which are designed to appear like a ship with billowing sails at full mast.

    Groundbreaking commenced on the project in late 1999, and the Concert Hall was finally dedicated in 2003 at an ultimate cost of $274 million. This ‘monument to music’ became the key to the resurgence of downtown Los Angeles and a beacon for the extensive commercial and condominium housing development which has followed.

    The Griswold Controls Solution

    Griswold Controls’ Los Angeles rep, Mahendra Mistry, owner of JD Sales Co., worked with the project’s mechanical engineering firm, Levine/Seegel Assoc. of Santa Monica, CA, to obtain favorable specifications for Griswold Controls automatic FCVs, calling out individual FCVs for various terminal units per the piping arrangement shown on the drawings.

    ACCO Engineered Systems of Glendale, CA, the principal mechanical contractor, was intent on using piping packages to help offset installation costs as well as take advantage of their space–saving features without compromising the piping arrangement shown on the drawings. Mahendra worked closely with Frank Falcone, Bill Traub and Mike Masterman of ACCO to sell nearly 200 Isolator™ Y coil piping packages for installation on the VAV boxes and another 60+ automatic flow controls on the hot and chilled water fan coils and air handlers.

    Products installed:
    • ~200 Isolator™ Y Coil Piping Packages Installed on VAV boxes throughout the facility.
    • 60+ Automatic Flow Controls Installed on hot and chilled water fan coils and air handlers.
    • Quickset® Manual Balance Valves Installed on pump discharge risers in low-headspace basement conditions.

    Overcoming a Unique Installation Challenge

    Another challenge presented itself regarding the flow measuring devices specified on the pumps. The pumps were installed in the basement with limited headspace below the ceiling. None of the specified devices could be accommodated because of their requirement for normal upstream and downstream pipe diameters on the vertical discharge risers.

    Although not specified for these manual devices, Mahendra worked closely with ACCO through 4 submittals to gain approval of Griswold Controls’ Quickset® manual balance valves, utilizing their disturbed flow technology as the only alternative that would fit in the low headspace and still provide the specified accuracy.

    Griswold Controls and JD Sales are very proud of their involvement in this world–class project.

    Questions about this application? Contact info@GriswoldControls.com or 949.559.6000

    Griswold Controls Case Studies

    Have a question about this or another Griswold Controls Case Study?

    Fill out the form below and someone from Griswold Controls will get back to you shortly.


      Please prove you are human by selecting the heart.

      CBS Studios, Manhattan, New York

      CBS Studios – New York City

      Ensuring TV anchors keep their cool using MVP valves and Isolator™ Rs Uni-Flanges on chilled water system.

      Project Overview

      Application Television and sound studios
      Contractor A.D. Winston Corporation, New York, NY
      Engineer/Consultant MDM Consulting Engineers
      Completion Date 2005 (Seven weeks for entire job)

      The Challenge

      CBS Studios Case Study

      CBS Studios faced a daunting challenge controlling cooling capacity in their Manhattan sound and TV studios. Manual balancers struggled due to multiple pumps and partial VFD control, making temperature control unreliable. Griswold Controls was contracted to provide a solution.

      Kristen Ortlinghaus of Griswold Controls and MDM Consulting Engineers collaborated to select the correct valves for the project. MVP™ pressure independent valves, Isolator™ Rs, and Uni-Flanges were chosen. The installation schedule was aggressive: first shipment in four weeks, complete installation in seven weeks.

      After completion, CBS was extremely satisfied, planning to use additional MVP valves and convert all manual-balanced coils to Griswold Controls products in the future.

      CBS Studios mechanical room

      Valve Products

      Isolator™ & “K” Automatic Flow Control Valves

      Isolator and “K” automatic flow control valves are available with a wide range of flows and PSID, and are ideal for tight spaces. These valves offer easily accessible flow control cartridges combined with isolation ball valves, allowing exchange of the flow control cartridge without breaking pipe connections if system flow requirements change. They also simplify maintenance of coils and temperature controls. Perfect for terminal boxes, VAV boxes, fan coil units, heat pump installations, and baseboards/in-cabinet applications.

      Isolator™-S K-Valve

      QuickSet® Manual Balance Valves

      QuickSet manual balance valves make proportional or static balancing simple and fast. Available in standard configurations or with accessory ports, QuickSet valves feature patented Optimizer® parabolic flow inserts for minimal handle movements and smooth flow changes. Full range handle position control ensures precise flow is achieved immediately. Ideal for casinos, hotels, VAV boxes, fan coil units, and heat pump installations.

      QuickSet®

      Unimizer® Actuated Control Valves

      Unimizer 2- and 3-way actuated control valves provide precise temperature control wherever actuated ball or globe valves are needed. They feature high close-off pressure, multiple Cvs for exact pressure drop matching, and equal percentage flow via the patented Optimizer® insert. Ideal for hotels, schools, terminal units, VAV boxes, air handling units, fan coil units, heat pump installations, equipment rooms, and pipelines.

      Unimizer®

      Automizer® Combination Control Valves

      Automizer all-in-one valves combine an actuated temperature control valve with a stainless steel automatic flow limiting cartridge. They integrate the entire return side of the coil in one unit: flow limiting valve, actuated 2-way control valve, and manual isolation ball valve. Patented Optimizer® ensures equal percentage flow characteristics. Ideal for schools, office buildings, VAV boxes, fan coil units, heat pump installations, and terminal boxes.

      Automizer®

      PIC-V® Pressure Independent Control Valves

      PIC-V pressure independent control valves maintain accurate flow regardless of pressure fluctuations, providing stable balancing at all points up to maximum flow rate, eliminating hot and cold spots. They combine balancing and control valve functionality into one compact housing. Perfect for office buildings, prisons, hospitals, laboratories, computer centers, and high-tech manufacturing.

      PIC-V®

      Questions about this application? Contact info@GriswoldControls.com or 949.559.6000

      Griswold Controls Case Studies

      Have a question about this or another Griswold Controls Case Study?

      Fill out the form below and someone from Griswold Controls will get back to you shortly.


        Please prove you are human by selecting the key.

         

        Food Industry:

        Hostess Brands

        Location: Arkansas Date of Completion: August 1st, 2022 Representative: Fluid Solutions Griswold Controls Products Used: Balancing all aspects of their HVAC system leading to balanced flow at all times,...

         

        Health Care:

        RUTGERS UNIVERSITY: RWJUH CENTER FOR INNOVATION

        RUTGERS UNIVERSITY: RWJUH CENTER FOR INNOVATION  Location: New Brunswick, New Jersey Completion Date: September 2023 Sales Representative: Wales Darby Griswold Products Used: Pre-assembled Coil Piping Packages...

        PRINCETON UNIVERSITY CBE BUILDING

        Location: Princeton, New Jersey  Completion Date: 2025  Sales Rep: Wales Darby  Griswold Products Used: Pre-Assembled Coil Hookups (CPP-IRIS) with Isolator R Valves  Project Description  At the forefront...

        ANAZAO HEALTH

        Location: Tampa, Florida  Completion Date: Late 2024  Sales Rep: Florida Hydronics  Griswold Products Used: QuickSet Packages and Large Flanged QuickSet Manual Valves   Our thoughts are with the...

        UT Southwestern Medical Center

        Location: Dallas, Texas Completion Date: 2023 Sales Rep: Texas Air Systems Griswold Controls Products Used: Coil Piping Piping Packages including Automatic Flow Limiting IR Valve   Description: The UT Southwestern has...

        West Henderson Hospital Tower

        Location: Las Vegas, Nevada Date of Completion: Late 2024 Representative: Norman S. Wright Griswold Controls Products Used: Approximately 500 CPP-2IRIS packages with customer supplied ATCs Installed by Griswold...

        Covenant Health West Tower

        Location: Lubbock, TX Date of Completion: 2021 Representative: Texas AirSystems Griswold Controls Products Used: Manual CPPS - 2QIS   Description: The life expectancy in the US is now...

        City of Hope Cancer Center – Irvine

        Location: Irvine, California Date of Completion: 2021 Representative: J.D. Sales Griswold Controls Products Used: QuickSet Manual Balance Valves -Brass and Steel Flange versions and other complementary components (Flanged...

        MFSH NICU – Postpartum

        Location: Williamsville, New York Date of Completion: Spring 2019 Representative: F.P. Langley Co Griswold Controls Products Used: CPP-PICV with customer supplied Actuators Description: MFSH (Millard Fillmore Suburban Hospital)...

        The OU Medical Center Adult Patient Tower

        Location: Oklahoma City, Oklahoma Date of Completion: Fall 2019 Representative: Reintjes & Hiter Griswold Controls Products Used: CPP-2IRIS Packages with customer supplied ATCs Description: The OU Medical Center Adult Patient...

        The University of Texas Southwestern Medical Center

        Location: Dallas, TX Date of Completion: Winter 2019 Representative: Neal and Associates Griswold Controls Products Used: CPP-2IRIS Packages with hoses installed and customer supplied ATCs Description: The University of...

        Mason General Hospital MOB Medical Office Building

        Location: Shelton, WA Date of Completion: Summer 2019 Representative: Proctor Sales Griswold Controls Products Used: CPP-2IRIS Packages with hoses installed and customer supplied ATCs Description: At the Mason...

        The Van Ness Campus at Cathedral Hill Hospital

        Location: San Francisco, California Date of Completion: Unknown Representative: California Hydronics Corporation (CHC) Griswold Controls Products Used: Lead Free K-Valves Description:  Located in San Francisco, The Van Ness...

        Mount Carmel East, New Ned Tower

        Location: Columbus, Ohio Date of Completion: Unknown Representative: Kevin McGovern Associates Griswold Controls Products Used: 3/4" – 1-1/2", 2QIS & 3QIS Sweat CPPs Description: Mount Carmel Health is...

        Delray Medical Center

        Location: Delray Beach, Florida Date of Completion: Early 2017 Representative: Diversified Fluid Controls Griswold Controls Products Used: 1/2" – 1-1/2" L, 2IRIS Female cpps w/SS Ball&Stem, Exts &...

        Tukh Cambridge North Tower

        Location: Kansas City, Kansas Date of Completion: 2018 Representative: Diversified Fluid Controls Griswold Controls Products Used: 1/2" – 1-1/2", 2QIS & 3QIS Sweat CPPs Description: The University of...

         

        Hospitality:

        400 Central Residency

        Location: St. Petersburg, Florida Griswold Controls Products Used: Hose Kits with Automatic Flow Limiting K Valves   Description: In the sun-kissed landscape of St. Petersburg, Florida, the soaring...

        Peppermill Resort Tower

        Location: Reno, Nevada Date of Completion: Late 2023 Griswold Controls Products Used: Almost 2000 Automizer Coil Piping Packages with KMC Actuators Installed by GC   Description: Nestled in...

        Aurum Golden Apartments

        Location: Golden, Colorado Date of Completion: 2022 Representative: LONG Building Technologies, Inc. Griswold Controls Products Used: Streamline Control   Description: The Garden of the Gods, the Rocky Mountain Range,...

        Parcel 12

        Location: Boston, Massachusetts Date of Completion: TBD Griswold Controls Products Used: Automatic Flow Limiting valves Grooved End – 4”-12” and K Valves Benefit of Griswold Controls Products: Balanced Hydronic...

        Winthrop Center

        Location: Boston, Massachusetts Date of Completion: July 2021 Representative: Equipment Direct Sales Griswold Controls Products Used: Grooved End Valves 12" and 14"   Description: Facility Description: Massachusetts: even...

        Bentall Skyrise

        Location: Vancouver, British Columbia Date of Completion: 2021 Representative: Riada Sales Inc. Griswold Controls Products Used: Custom CPP-6IRIS Coil Piping Packages for installation on 6-way control valves.  ...

        Monteleone Hotel Update, New Orleans

        Hotel Monteleone – New Orleans

        Griswold Controls helps preserve a historic French Quarter landmark through a phased HVAC retrofit using Automizer® coil piping packages.

        Project Overview

        Solution Automizer® Coil Piping Packages & Unimizer® Valves
        Application Hotel / Historic Landmark Renovation
        Mechanical Engineer Wink Engineering
        Representative Schully Strawn & Associates
        Facilities Engineer A.J. Mattern
        Phases Completed Phase 1: 2002 | Phase 2: 2004

        The Challenge

        Hotel Monteleone New Orleans

        Located in the heart of the French Quarter, the 15-story Beaux-Arts landmark Hotel Monteleone required a major HVAC retrofit while remaining fully operational. The property includes over 600 guest rooms and had to maintain comfort, aesthetics, and revenue during renovation.

        • Minimal Guest Disruption Rooms could only be taken offline in small groups. The hotel had to remain fully operational during renovation.
        • Historic Preservation Tight mechanical spaces required a compact, small-footprint solution.
        • System Compatibility The four-pipe fan coil configuration required a unified, single-source solution.
        • Phased Execution The retrofit needed to be efficient across multiple renovation phases.

        The Solution

        Working closely with Wink Engineering and the hotel’s facilities team, Griswold Controls recommended installing Automizer® combination control valve coil piping packages on the four-pipe fan coils.

        Key Advantages

        • Single Source for Coil Components Eliminates coordination issues and ensures system compatibility.
        • Multi-Function Valve Combines actuated temperature control and flow limiting in one compact package.
        • Small Footprint Ideal for historic buildings with tight mechanical space.
        • Equal Percent Control Mirrors coil heat transfer curves for superior temperature regulation.
        • Pre-Assembled & Ready to Install Reduces labor, installation time, and jobsite handling.

        I told Gary to get the Griswold Control valves on order and let my purchasing department know how much the bill would be.

        — A.J. Mattern, Chief Facilities Engineer, Hotel Monteleone

        Because the Automizer features automatic flow control, the retrofit could be accomplished a few rooms at a time without affecting the rest of the hotel's circuits — making it the ideal product for hotel renovation. In a manual balance application, the entire system would have had to be rebalanced every time a room was taken offline. By installing the Automizer, the hotel minimized room downtime, substantially reducing the potential for lost revenue.

        The Results

        Phase 1 (2002): The Monteleone Hotel renovated guest rooms with 288 Automizer CPP2A packages on horizontal units, plus a number of 3-way Unimizer® actuated control valves on vertical units.

        Phase 2 (2004): The hotel ordered an additional 112 Automizer coil piping packages. The re-order decision was automatic — a direct result of satisfaction with Phase 1 performance.

        Because the Automizer features automatic flow control, rooms could be renovated individually without requiring a system-wide rebalance — protecting guest comfort and preventing revenue loss.

        The success at the Monteleone Hotel demonstrates how a technically superior product can simplify phased renovation in occupied, operating buildings — protecting revenue while delivering measurable long-term performance gains.

        It's nice when you are selling a quality product like Griswold Controls. You put your time and effort into getting that first order, and then getting the next order just takes a few minutes on the phone.

        — Gary Lewis, Schully Strawn & Associates

        They work great! I'm very satisfied and look forward to buying Griswold Controls for every new FCU in the hotel as we continue to renovate additional rooms.

        — A.J. Mattern, Chief Facilities Engineer, Hotel Monteleone

        Automizer® Combination Control Valves

        Automizer® Next Generation valves combine an actuated 2-way control valve with a stainless steel automatic flow limiting cartridge and manual isolation ball valve — all within one compact body.

        • Globe Valve Performance Ball valve pricing with equal-percent control.
        • Patented Optimizer® Inserts 30–50% greater rotation response.
        • Automatic Flow Limiting Eliminates overflow and underflow.
        • Field Repairable Stem Resistant to chemical treatments and temperature swings.

        Coil Piping Packages & Hose Kits

        Griswold Controls offers over 900 standard pre-plumbed coil piping packages that simplify engineering design and speed installation.

        • Pre-Assembled & Shrink-Wrapped Ships ready to install.
        • 48-Hour Shipping Standard packages up to 2″.
        • Automatic or Manual Flow Options Works for any balancing application.
        • Single Source Supply Eliminates compatibility concerns.
        Griswold Controls Case Studies

        Have a question about this or another Griswold Controls Case Study?

        Fill out the form below and someone from Griswold Controls will get back to you shortly.


          Please prove you are human by selecting the heart.

          Las Vegas’ Wynn Hotel & Casino

          Wynn Las Vegas Resort – Las Vegas

          Utilization of Griswold Controls coil piping packages to save a significant amount of install time for the new Wynn Las Vegas Resort.

          Project Overview

          Application Fan Coils, VAV Boxes
          Contractor Southland Industries & Hansen Mechanical
          Engineer/Consultant JBA Consulting Engineers
          Completion Date May 2006
          Griswold Controls Case Study - Las Vegas Wynn Hotel

          The most recent – and stunning – addition to the southern Nevada skyline is the new Wynn Las Vegas Resort. Built at a cost of $2.7 billion dollars and opened in April 2005, the 50-story bronze tower contains 2,700 luxury hotel rooms with floor-to-ceiling windows, 22 restaurants, the 2,000 seat “Aqua Theater-in-the-Round,” and the “Promenade” with luxury boutique shopping. Built on the site of the former Desert Inn, it also includes an 18-hole golf course. Whereas most high-end hotels have car rental desks, Wynn Las Vegas houses a Ferrari-Maserati car dealership inside the resort. The front entrance and three-acre Lake of Dreams are shielded from the street by a 140-foot tall mountain with 60-foot tall pine trees.

          Steve Wynn, who had previously built the Mirage (1989), Treasure Island (1993) and Bellagio (1998) hotels, conceived and developed Wynn Las Vegas. Several years ago he sold those three properties to MGM Grand in order to develop Wynn Las Vegas. This resort-casino clearly establishes a new threshold for local, high-end properties. JBA Consulting Engineers, Las Vegas, is the mechanical engineering firm responsible for the project. Bid and mechanical construction activity was divided into seven distinct areas, and the specification allowed for either automatic or manual flow controls. Southland Industries, Las Vegas, handled area one and the central plant, and Hansen Mechanical of Las Vegas was awarded responsibility for areas two through seven, which covered the tower.

          Engineered Equipment & Systems Co., the Griswold rep for southern Nevada, successfully convinced Southland Industries and Hansen Mechanical to utilize Griswold coil piping packages. Unimizers® were installed on a majority of the fan coils, VAV boxes, heating coils and heat pumps in the hotel rooms, showrooms, the Aqua Theater and the villas.

          According to Matt Miceli, the Engineered Equipment & Systems Co. sales engineer responsible for the project, the Unimizer packages significantly reduced Hansen’s ATC coordination costs. Matt said, “Hansen has been a Griswold Controls customer for some time. They especially like Griswold’s coil hookup packages and the way we shrink-wrap them. No other vendor provides this packaging concept. This project also offered them the opportunity to add the Unimizer® to the packages, which greatly simplified the coordination with the ATC contractor. The project time frame was extremely aggressive and the Unimizer® packages saved the contractor a significant amount of install time.” James Gomel, Hansen Mechanical project manager, stated, “The Griswold coil-piping packages allow for installation consistency to the systems along with a valuable savings in labor cost. In addition, incorporating the Unimizer® with the package allows for a complete installation of the coil-piping package, thus eliminating the need for additional labor required to install the controller in the field."

          In total, over 2,000 Griswold Controls piping packages are installed on the project along with over 20 air handler packages in area one. In addition to the flow controls and coil piping packages, Engineered Equipment & Systems Co. sold in excess of $100,000 worth of Griswold Filtration separators and separator package filtration systems for the numerous cooling towers on the project.

          Griswold Controls Case Studies

          Have a question about this or another Griswold Controls Case Study?

          Fill out the form below and someone from Griswold Controls will get back to you shortly.


            Please prove you are human by selecting the truck.

            W Hotel & Victory Park, Dallas

            W Hotel & Victory Park – Dallas

            Griswold Controls helps to re-shape the downtown Dallas skyline, providing space saver packages to maximize floor space in the hotel.

            Project Overview

            Application Terminal Units, Vertical Heat Pumps & Horizontal Heat Pumps
            Contractor Brandt Engineering
            Engineer/Consultant James Johnston & Associates
            Completion Date May 2006
            Griswold Controls Case Study - Dallas’ W Hotel & Victory Park

            Located in the heart of Dallas, just north of the downtown business district in a formerly unusable inner city site, Victory Park is one of the country’s most significant master planned urban developments. The project began with the construction of the American Airlines Center Arena in late 2000, home of the Dallas Mavericks basketball team and the Dallas Stars hockey team. A acre urban center, when complete Victory Park will offer retail establishments, dining, modern office space, residential units, entertainment venues, and a cutting-edge hotel. Part of the development will include Victory Plaza, an area reminiscent of Times Square in New York City.

            In 2005, immediately across the street from the American Airlines Center, McCarthy General Contractors broke ground on what is now the W Hotel. The W Hotel, owned by Starwood Properties, is a 33 story luxury condo–hotel offering unique and exciting interiors, classic W amenities including terry/pique robes, an infinity edge swimming pool on the 16th floor, and top–notch restaurants and lounges. W Benton Wofford of James Johnston & Associates, the Consulting Engineer, designed the building to include hotel facilities up to the 15th floor, and luxury condo units from the 16th to 30th floors. Ross Perot Jr. has his own private penthouse suite complete with his own personal heliport on the roof.

            Griswold Controls IRIS automatic packages with hoses were purchased for the terminal units; vertical stack heat pumps in the hotel rooms; and to maximize floor space, horizontal heat pumps for the condo units. Griswold Controls space saver packages were selected on the vertical stack units because space limitations required that the packages fit inside the heat pump cabinets.

            Matt Summerville of Brandt Engineering, project manager for the mechanical contractor and long-time Griswold Controls customer, was pleased to provide Griswold Controls with project details. As a matter of fact, Brandt employee Mike Clark, the piping superintendent, told Griswold Controls that he had no problems whatsoever with any of the 382 Griswold Controls packages on the W Hotel and would not only use Griswold Controls products again, but would highly recommend them.

            The W Hotel opened in June, 2006.

            Griswold Controls Case Studies

            Have a question about this or another Griswold Controls Case Study?

            Fill out the form below and someone from Griswold Controls will get back to you shortly.


              Please prove you are human by selecting the cup.

              Hotel Intercontinental, Chicago, Illinois

              Hotel InterContinental Case Study

              Improving room comfort with Griswold Controls' Automizer® combination control valves and Coil Piping Packages

              Project Overview

              Application: Hotel
              Griswold Controls Solution: Automizer® combination control valves, Coil piping packages
              Contractor: Bovis Lend Lease, Inc. Tobin Stanley
              Engineer/Consultant: Edwards Engineering Marc Crampton
              Completion Date: 2000
              Hotel InterContinental - North Tower renovation

              The Hotel Inter-Continental was built in 1929 as the Medinah Athletic Club. The contemporary North Tower was added later.

              Cramped Spaces Prompt Ingenuity

              During the renovation, more than 500 fan coils were replaced in North Tower guest rooms. Units were installed above the ceiling in the entry vestibule of the rooms, leaving only 12" of vertical space for the manual balancing system. Tobin Stanley of Bovis Lend Lease contacted Griswold Controls to provide pre-assembled coil piping packages with Automizer® combination control valves, saving space and labor during installation.

              "This gave the client the opportunity to purchase prefab equipment and just put (it) in. This also meant that installers would spend minimal time on the site, so only two floors would have to be closed at a time."

              — Bill Toth, Griswold Controls Sales Representative

              Coil Piping Packages Provide Numerous Benefits

              The balancing cartridge in the Automizer is factory preset to automatically limit the flow for each room or zone, eliminating the need for startup balancing and any subsequent rebalancing. The automatic balancing packages saved the hotel approximately $35,000 in start-up labor alone.

              For this project, the standard coil package included the flow limiting cartridge of the Automizer combined with a low-torque, equal-percentage actuated ball valve and factory mounted Siemens actuators. The entire piping package takes up roughly one-fourth the space of a typical manual piping configuration.

              Trouble-Free Balancing, Increased Comfort

              With the renovation complete and the North Tower in full operation, Kees Guijt, regional director of engineering, reports there has been a significant drop in guest complaints regarding room comfort.

              Automizer® & Coil Piping Packages

              Automizer® Next Generation combination control valves
              Automizer® combination control valves

              Automizer® Next Generation valves feature Griswold Controls' field repairable stem design and allow for field servicing without removal. These all-in-one valves combine an actuated temperature control valve with an automatic flow limiting cartridge, making them ideal for schools, office buildings, VAV boxes, fan coil units, heat pumps, and terminal boxes.

              Coil Piping Packages & Hose Kits

              Griswold Controls offers over 900 standard packages, pre-assembled for easy installation and timely delivery. Options like hoses and extension kits are also available.

              • Wide selection of pre-assembled, easy-to-order configurations
              • Easy ordering: order by specific part numbers
              • Timely delivery of standard packages
              • Variety of options: downsized automatic temperature control, extra ports, inclusion of Automizer or Unimizer valves
              Griswold Controls Case Studies

              Have a question about this or another Griswold Controls Case Study?

              Fill out the form below and someone from Griswold Controls will get back to you shortly.


                Please prove you are human by selecting the car.

                 

                Infrastructure:

                JOAQUIN MURRIETA PARK

                Location: Tucson, Arizona  Completion Date: Late 2024  Sales Rep: SiteOne Landscape Supply  Griswold Products Used: DWS Series Dirty Water Irrigation Valves  Project Description:  The City of Tucson...

                First Solar

                Location: Lawrence County, Alabama Date of Completion: 2025 Griswold Controls Products Used: 3” to 24” Wafers with Automatic Flow Limiting cartridges and Quickset Brass Valves   Description: Sustainability...

                LAX Automated People Mover

                Location: Los Angeles, California Date of Completion: 2023 Griswold Controls Products Used: Coil Piping Packages & Large Flanged QuickSet   Description: Los Angeles International Airport (LAX), a global aviation...

                Metro Wastewater

                Location: Denver, Colorado Date of Completion: Unknown Representative: Long Building Tech CPP-2QIS & CPP3QIS Description: The Metro Wastewater Reclamation District is the wastewater treatment authority for much of...

                 

                Manufacturing:

                GM Lordstown Electric Battery Plant

                Location: Lordstown, Ohio Date of Completion: June 2021 Representative: R.L. Deppmann Griswold Controls Products Used: QuickSet Manual Balance Valves   Description: Facility Description: What do Grand Central Station,...

                 

                Military:

                The DMAFB General Instruction Building

                Location: Tucson, AZ Date of Completion: September 2019 Representative: Varitec Solutions  Griswold Controls Products Used: CPP-2IRIS Packages with customer supplied ATCs Facility Description: The U.S. Air Force, in conjunction with the...

                 

                Technology:

                eBay Utah Data Center – Pressure Independent MVP Valves

                Location: Salt Lake City, Utah Date of Completion: 2013 Griswold Controls Products Used: Pressure Independent MVP Valves   Description: Facility Description: Have you ever been surfing on...

                Facebook Data Center – New Mexico

                Location: Los Lunas, New Mexico Date of Completion: 2021 Representative: Massey Johnson Associates Griswold Controls Products Used: Isolator U, Isolator S   Description: Facility Description: $1 billion dollars...